Files
vpn-dns-gateway/delivery/PR.md
T
vsun1 fbda9516fe
vpn-dns-gateway/pipeline/head This commit looks good
vpn-dns-gateway/pipeline/pr-main This commit looks good
Finalize Assignment 8 recovery evidence and manual
2026-11-16 00:03:46 -05:00

27 lines
1.5 KiB
Markdown

# Record completed rollback and staging recovery (closes #28)
Record build 8's human-approved production rollback to the original v1
image/configuration, build 9's staging bind-mismatch block, and build 10's
restored v2 staging deployment with changed=0 on rerun. Final production is
healthy v1/total 30 and staging v2/total 36. No app, pipeline, deployment-template,
credential or resource/security-limit change is included.
Preserve actual decisions, approval, timings, report hashes, runtime checks and
original HTTPS CSVs. Nine production requests failed during rollback although
the 30-second probe missed it; staging recorded 169 failures during the
deliberate fault/recovery. Retain build 7's pre-deployment process-limit error
and unchanged-limit runner restart. Document sampling and single-Droplet limits.
Update the manual, diagram, inventory, source/access links, runbooks, history
and AI log. Issue 28 was created during finalization with Vincent's approval;
it is not represented as a pre-implementation issue. Preserve CSV bytes and
JSON line endings for reproducible evidence hashes.
Validation: actual Jenkins 8 SUCCESS, 9 expected FAILURE before production,
10 SUCCESS; 12 control/3 app tests and source/dependency gates in each;
matching historical selectors; final HTTPS health/source/price/400 checks and
six monitoring targets up. Full manual build and affected-page visual review.
Existing coursework, earlier services and grading evidence retained.
Closes #28.