23 lines
1.3 KiB
Markdown
23 lines
1.3 KiB
Markdown
# Week 8 package directory evidence
|
|
|
|
Assignment inspected in Vincent's Chrome tab on October 23, 2026:
|
|
https://sit.instructure.com/courses/188761/assignments/696106
|
|
|
|
Weekly Report 8 is due October 23 at 11:59 p.m. and requires at most one page,
|
|
completed work, next-week plans, action items, issues/risks, current Document
|
|
History, and a screenshot of the built-package directory with version numbers.
|
|
Vincent approved using prototype application version 0.1.0 and will clarify
|
|
the instructor's intended package scope at the next class.
|
|
|
|
`package-directory-2026-10-23.jpg` is the original bounded Windows File Explorer
|
|
capture of `code/packages/`, containing `TikZRefinery-0.1.0-windows-x64/`.
|
|
The report clips the image to the breadcrumb and directory row for legibility;
|
|
the underlying capture is unaltered. No screenshot content was synthesized.
|
|
The binary package is retained locally but ignored by Git. Application version
|
|
0.1.0, Qt version 6.12.0 and report version 1.8.0 describe different artifacts.
|
|
See `code/tests/evidence/package-2026-10-23.md` for the bounded package checks.
|
|
|
|
`week-8-report-preview.png` is the reviewed rendering of the one-page Week 8
|
|
entry retained for Vincent's review. The authored TeX and complete report PDFs
|
|
remain authoritative; the preview is generated evidence, not editable source.
|