138 lines
8.0 KiB
TeX
138 lines
8.0 KiB
TeX
\part{Design, Evaluation, and Optimization}
|
|
|
|
\include{dsnRequirements}
|
|
\include{dsnUserStories}
|
|
\include{dsnUseCases}
|
|
\include{dsnArchitectureOverview}
|
|
\include{dsnUserInterfaceDesign}
|
|
\include{dsnLogicalView}
|
|
\include{dsnProcessView}
|
|
\include{dsnDevelopmentView}
|
|
\include{dsnPhysicalView}
|
|
|
|
\chapter{Constraints and Assumptions}\ChapterLabel{ConstraintsAssumptions}
|
|
\section{Design and Implementation Constraints}
|
|
Record mandated technologies, budgets, schedules, standards, interfaces, facilities, safety limits, and other restrictions.
|
|
\section{Assumptions and Dependencies}
|
|
Record assumptions, external dependencies, owners, risks if invalidated, and contingency plans.
|
|
|
|
\chapter{Applicable Codes, Standards, and Regulations}\ChapterLabel{CodesStandardsRegulations}
|
|
Identify the applicable codes, standards, regulations, policies, and ethical obligations. State how the project will demonstrate compliance.
|
|
|
|
\chapter{Concept Development and Selection}\ChapterLabel{ConceptDevelopment}
|
|
Document alternatives, screening criteria, trade studies, stakeholder input, concept selection rationale, and the resulting baseline concept.
|
|
|
|
\begin{dsnMilestone}[Milestone 1: Design Proposal]
|
|
First week of October: present the mission, customer, needs, requirements, and concepts.
|
|
\end{dsnMilestone}
|
|
|
|
\chapter{Preliminary and Detailed Design}\ChapterLabel{PreliminaryDetailedDesign}
|
|
Document geometry, materials, manufacturing alternatives, software/hardware decomposition, and system-integration plans.
|
|
\section{System Architecture}
|
|
\subsection{Overview of System Architecture}
|
|
Show the system boundary, major subsystems, data/material/energy flows, responsibilities, and integration strategy.
|
|
\subsection{Hardware Architecture}
|
|
Describe hardware subsystems, interfaces, and allocation of requirements.
|
|
\subsection{Software Architecture}
|
|
Describe software layers, components, data flows, deployment, and allocation of requirements.
|
|
\subsection{Security Architecture}
|
|
Describe assets, threats, trust boundaries, controls, access rules, and residual risks as applicable.
|
|
\subsection{Communication Architecture}
|
|
Describe protocols, networks, message/data formats, timing, and failure handling.
|
|
\section{System Design}
|
|
\subsection{System Behavior Description}
|
|
Describe system states, workflows, use cases, timing, error handling, and safety behavior.
|
|
\subsection{Databases/Data Storage}
|
|
Describe data models, data lifecycle, retention, backup, privacy, and integrity controls.
|
|
\subsection{Data Conversion}
|
|
Describe imported, transformed, migrated, or exported data and its validation.
|
|
\subsection{Sub-System Interfaces}
|
|
Specify interfaces, signals, protocols, APIs, tolerances, and integration responsibilities.
|
|
\subsection{User Interface Design}
|
|
Present user tasks, wireframes, interaction flows, accessibility considerations, and usability criteria.
|
|
\section{Mechanical Design}
|
|
\subsection{Components and Sub-Assemblies - Bill of Materials}
|
|
Provide the bill of materials, part identifiers, quantities, sources, costs, and assembly relationships.
|
|
\subsection{Geometric Specification - CAD Models/Drawings}
|
|
Provide or reference controlled CAD models, drawings, dimensions, tolerances, and revision identifiers.
|
|
\subsection{Materials Selected}
|
|
Justify material selections using relevant mechanical, environmental, cost, and safety criteria.
|
|
\subsection{Manufacturing Processes Selected}
|
|
Describe selected processes, capabilities, quality controls, and alternatives considered.
|
|
\subsection{Process Description or Optimization Notes}
|
|
Document process steps, parameters, optimization results, and lessons learned.
|
|
\section{Electronics/Electro-Mechanical Design}
|
|
\subsection{Circuits}
|
|
Provide schematics, circuit rationale, design calculations, and test points.
|
|
\subsection{Electrical and Electro-Mechanical Interfaces}
|
|
Specify connectors, signals, power, mechanical mounting, protections, and interface constraints.
|
|
\subsection{List of Components: Motors, Sensors, Electronics}
|
|
List components, part numbers, specifications, source, cost, and selection rationale.
|
|
\subsection{Power System}
|
|
Describe power sources, budgets, conversion, distribution, protection, battery charging, and safety.
|
|
\section{Software Components Design}
|
|
\subsection{Algorithms}
|
|
Describe algorithms, inputs, outputs, assumptions, complexity/performance, and validation approach.
|
|
\subsection{Modules/Classes/Methods}
|
|
Describe modules, classes, methods, responsibilities, dependencies, and interfaces.
|
|
\subsection{Application Programming Interfaces}
|
|
Specify APIs, endpoints, contracts, error behavior, versioning, and authentication as applicable.
|
|
\subsection{Coding/Implementation Details}
|
|
Describe key implementation decisions, build/run process, configuration, and coding conventions.
|
|
|
|
\chapter{Design Evaluation Methods}\ChapterLabel{DesignEvaluationMethods}
|
|
\section{Design Concepts and Concept Screening}
|
|
Update concept screening if the alternatives or criteria changed after the initial selection.
|
|
\section{Design Evaluation/Selection Methods}
|
|
Describe the evaluation method, metrics, weights, experimental design, analysis technique, and decision rule.
|
|
\section{Analysis Cases and Results}
|
|
Present analysis cases, assumptions, calculations, simulation or experiment results, uncertainty, and conclusions.
|
|
\section{Impact on System Design}
|
|
Explain how analysis results determined system parameters and resulting design revisions.
|
|
|
|
\begin{dsnMilestone}[Milestone 2: Preliminary Design Review]
|
|
Third week of November: document the design, finalized concept evaluation and selection, and analysis.
|
|
\end{dsnMilestone}
|
|
|
|
\chapter{Alpha Prototyping: Plan and Budget}\ChapterLabel{AlphaPrototyping}
|
|
Define the alpha prototype scope, integration plan, demonstration criteria, budget, procurement, and test plan. The alpha demonstration must show all components and subsystems and how they fit together; full system integration is not required, but every individual subsystem must function.
|
|
|
|
\chapter{Testing and Evaluation: Plan and Results}\ChapterLabel{TestingEvaluation}
|
|
Provide test objectives, procedures, equipment, data, pass/fail criteria, results, anomalies, corrective actions, and traceability to requirements.
|
|
|
|
\include{dsnTests}
|
|
\include{dsnTraceability}
|
|
\include{dsnVerification}
|
|
\include{dsnValidation}
|
|
|
|
\begin{dsnMilestone}[Milestone 3: Performance and Cost Review with Alpha Prototype Demonstration]
|
|
Third week of February.
|
|
\end{dsnMilestone}
|
|
|
|
\chapter{Beta Prototyping: Design Revision and Optimization}\ChapterLabel{BetaPrototyping}
|
|
\section{Mechanical Design}
|
|
Describe mechanical revisions and optimizations made after alpha testing.
|
|
\section{Electronics/Electro-Mechanical Design}
|
|
Describe electrical and electro-mechanical revisions and optimizations made after alpha testing.
|
|
\section{Software Design}
|
|
Describe software revisions, defect corrections, performance improvements, and configuration changes.
|
|
\section{System-Level Design}
|
|
Describe integration changes, system-level optimization, and readiness for beta demonstration.
|
|
|
|
\chapter{Fabrication, Assembly, and Manufacturing Processes}\ChapterLabel{FabricationAssemblyManufacturing}
|
|
Document fabrication, assembly, manufacturing, quality-control steps, process outcomes, and lessons learned.
|
|
|
|
\chapter{High-Performance Testing and Evaluation}\ChapterLabel{HighPerformanceTesting}
|
|
Present final integrated-system tests under realistic user environments, results, limitations, and evidence that requirements are met.
|
|
|
|
\begin{dsnMilestone}[Milestone 4: Optimized Design Review with Beta Prototype Demonstration]
|
|
Last week of March: the design and prototype must be reasonably complete. The beta demonstration must integrate all subsystems into a fully functional system and demonstrate operation in realistic user environments.
|
|
\end{dsnMilestone}
|
|
|
|
\chapter{Final Design Specification}\ChapterLabel{FinalDesignSpecification}
|
|
Provide the final controlled specification, final configuration, delivered design documents, requirements status, test evidence, known limitations, and acceptance status. Include detailed design documents in Appendix~D.
|
|
|
|
\begin{dsnMilestone}[Milestone 5: Submission of the Final Report]
|
|
Spring finals week.
|
|
\end{dsnMilestone}
|