# Week 9 report review: version 1.9.0
|
|
|
|
The Week 9 assignment was inspected read-only in Vincent's connected Chrome
|
|
session on October 30, 2026:
|
|
https://sit.instructure.com/courses/188761/assignments/696107
|
|
|
|
It is due October 30 at 11:59 p.m. and requires at most one page, completed
|
|
and next-week work, applicable actions/risks, and links to updated locations in
|
|
both the weekly entry and Document History. Unlike Week 8, this assignment
|
|
does not specify a built-package screenshot. Its scope remains an outstanding
|
|
instructor clarification from Week 8.
|
|
|
|
The weekly records the completed ownership/interaction/provider-boundary review
|
|
and Milestone 2 specification work. Vincent confirmed submitting 1.8.1.1.
|
|
Transaction/history implementation was deferred; new product checks and
|
|
participant validation are not claimed. Counts were checked against authored
|
|
TeX: 72 requirements, 59 planned test cases, 10 stories, 72 VER plans, 10 VAL plans.
|
|
|
|
Both editions completed the existing shared TinyTeX sequence: initial pdflatex,
|
|
bibtex, makeindex and three final pdflatex passes. Final logs are clean.
|
|
`qa-summary.json` records final hashes, page counts, weekly page boundaries and
|
|
resolved PDF navigation targets. Week 9 is exactly printed page 111 in each;
|
|
Week 8 remains one page. PDFs were used for visual/navigation checks only;
|
|
no PDF text extraction was used. Affected pages were rendered, contact sheets
|
|
reviewed and the new weekly, abstract, roadmap and prompt record inspected
|
|
at reading size. An abstract overflow was corrected before delivery.
|
|
|
|
The working submission PDF has 161 pages and the developer's edition 217 pages.
|
|
The submitted Milestone 2 checkpoint was retained unchanged under
|
|
`../../submissions/milestone-2-1.8.1.1/`. The current sources and current PDFs
|
|
remain in their usual repository locations. No Canvas upload/submission,
|
|
application implementation, commit or push was performed by this task.
|
|
|
|
Reproducible compiler outputs, draft previews and review images were removed
|
|
from `work/week-9-report/` after verification. Final reports, this QA record,
|
|
the submitted checkpoint, sources, prototype package/demos and other tasks'
|
|
work were retained. The JSON records cleanup measurements and preservation checks.
|