Files
vsun1 27b82c169e
vpn-dns-gateway/pipeline/head This commit looks good
vpn-dns-gateway/pipeline/pr-main This commit looks good
Add frozen TikZRefinery demo baseline and build pipeline
2026-11-25 22:46:33 -05:00

25 lines
1.5 KiB
Markdown

# Focused use-case diagrams
Editable TikZ input fragments for UC-001 through UC-009, included through
`documents/latex/tkrUseCases.tex` in both report editions.
Each diagram retains one actor, one existing goal/ID, and the TikZRefinery
boundary. Dotted connectors attach notes summarizing the specification;
they do not represent activity transitions or include/extend relationships.
Goal IDs and captions link back to specification tables. Tables link to the
overview and focused figures; the overview's goals also link to the tables.
These views describe proposed product behavior, not implementation evidence.
The separate diagrams under `../design-diagrams/` describe the current scaffold
and separately labelled planned transaction activity. UC-004 uses the same
shared styles, boundary, note panels and report scaling as the other goals.
These diagram fragments introduce no implementation claims. Build the complete report with TinyTeX;
separate diagram PDFs are not maintained.
November 19 adds planned UC-007 provider choice, UC-008 update handling and
UC-009 creation. The actor uses UML's rectangular actor notation; goal
associations and dotted note attachments use orthogonal routes. Placement,
New/Save As and update mechanisms remain open. Existing IDs are retained.
UC-005 (attached labels) and UC-006 (obscured selection) were added for Milestone 2. Both retain the shared styles, actor/goal, boundary, three note panels, dotted annotations and reciprocal links. Their behavior is reviewed design, not implemented evidence.