25 lines
1.7 KiB
TeX
25 lines
1.7 KiB
TeX
This group document records the SSW 590 coursework and its supporting
|
|
commands, designs, and evidence. Assignment 8 implements secure delivery with
|
|
a trusted Jenkins agent, locked Flask/Gunicorn service, security gates,
|
|
Ansible, scoped deployment credentials and recovery runbooks. The prerequisite
|
|
jobs, DNS/TLS and deliberate Jenkins test/secret blocks passed. The reviewed v1
|
|
image was published with passing scans, but staging stopped at a terminal
|
|
request incompatible with the restricted deploy key. A noninteractive Ansible
|
|
preflight passed; its inventory correction awaits review/merge. Successful
|
|
v1/v2 deployment, approvals, rollback and staging recovery remain pending.
|
|
This draft is not ready for submission.
|
|
Assignment 7 introduced site reliability
|
|
engineering: Prometheus, Grafana OSS, Node Exporter, and Blackbox Exporter
|
|
run as four pinned containers beside Gitea and Jenkins on the originally 1\,GiB
|
|
DigitalOcean droplet, with Grafana at \url{https://metrics.yebilly.me/login}
|
|
for approved networks only. A dashboard shows host CPU, memory, and disk and
|
|
the HTTPS availability of Gitea and Jenkins. A 99\% availability objective is
|
|
defined and measured, and three alert rules (service availability, disk
|
|
space, and collection health) notify the team's Discord channel. Each was
|
|
shown firing and resolving; the availability rule through a planned Jenkins
|
|
outage that was detected in about two minutes and recovered about a minute
|
|
after restart. Earlier chapters retain the group's prior assignment
|
|
results, including the Jenkins merge gate and the Gitea Actions manual build.
|
|
On November 14 the team resized the droplet to 2\,GiB without enlarging its
|
|
disk, updated packages and verified the existing services.
|