Record build 8's human-approved production rollback to the original v1
image/configuration, build 9's staging bind-mismatch block, and build 10's
restored v2 staging deployment with changed=0 on rerun. Final production is
healthy v1/total 30 and staging v2/total 36. No app, pipeline, deployment-template,
credential or resource/security-limit change is included.
Preserve actual decisions, approval, timings, report hashes, runtime checks and
original HTTPS CSVs. Nine production requests failed during rollback although
the 30-second probe missed it; staging recorded 169 failures during the
deliberate fault/recovery. Retain build 7's pre-deployment process-limit error
and unchanged-limit runner restart. Document sampling and single-Droplet limits.
Update the manual, diagram, inventory, source/access links, runbooks, history
and AI log. Issue 28 was created during finalization with Vincent's approval;
it is not represented as a pre-implementation issue. Preserve CSV bytes and
JSON line endings for reproducible evidence hashes.
Validation: actual Jenkins 8 SUCCESS, 9 expected FAILURE before production,
10 SUCCESS; 12 control/3 app tests and source/dependency gates in each;
matching historical selectors; final HTTPS health/source/price/400 checks and
six monitoring targets up. Full manual build and affected-page visual review.
Existing coursework, earlier services and grading evidence retained.
Record build 8's human-approved production rollback to the original v1
image/configuration, build 9's staging bind-mismatch block, and build 10's
restored v2 staging deployment with changed=0 on rerun. Final production is
healthy v1/total 30 and staging v2/total 36. No app, pipeline, deployment-template,
credential or resource/security-limit change is included.
Preserve actual decisions, approval, timings, report hashes, runtime checks and
original HTTPS CSVs. Nine production requests failed during rollback although
the 30-second probe missed it; staging recorded 169 failures during the
deliberate fault/recovery. Retain build 7's pre-deployment process-limit error
and unchanged-limit runner restart. Document sampling and single-Droplet limits.
Update the manual, diagram, inventory, source/access links, runbooks, history
and AI log. Issue 28 was created during finalization with Vincent's approval;
it is not represented as a pre-implementation issue. Preserve CSV bytes and
JSON line endings for reproducible evidence hashes.
Validation: actual Jenkins 8 SUCCESS, 9 expected FAILURE before production,
10 SUCCESS; 12 control/3 app tests and source/dependency gates in each;
matching historical selectors; final HTTPS health/source/price/400 checks and
six monitoring targets up. Full manual build and affected-page visual review.
Existing coursework, earlier services and grading evidence retained.
Closes #28.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Record build 8's human-approved production rollback to the original v1
image/configuration, build 9's staging bind-mismatch block, and build 10's
restored v2 staging deployment with changed=0 on rerun. Final production is
healthy v1/total 30 and staging v2/total 36. No app, pipeline, deployment-template,
credential or resource/security-limit change is included.
Preserve actual decisions, approval, timings, report hashes, runtime checks and
original HTTPS CSVs. Nine production requests failed during rollback although
the 30-second probe missed it; staging recorded 169 failures during the
deliberate fault/recovery. Retain build 7's pre-deployment process-limit error
and unchanged-limit runner restart. Document sampling and single-Droplet limits.
Update the manual, diagram, inventory, source/access links, runbooks, history
and AI log. Issue 28 was created during finalization with Vincent's approval;
it is not represented as a pre-implementation issue. Preserve CSV bytes and
JSON line endings for reproducible evidence hashes.
Validation: actual Jenkins 8 SUCCESS, 9 expected FAILURE before production,
10 SUCCESS; 12 control/3 app tests and source/dependency gates in each;
matching historical selectors; final HTTPS health/source/price/400 checks and
six monitoring targets up. Full manual build and affected-page visual review.
Existing coursework, earlier services and grading evidence retained.
Closes #28.