Record completed rollback and staging recovery (closes #28) #29

Open
vsun1 wants to merge 1 commits from codex/assignment8-final-evidence into main
Owner

Record build 8's human-approved production rollback to the original v1
image/configuration, build 9's staging bind-mismatch block, and build 10's
restored v2 staging deployment with changed=0 on rerun. Final production is
healthy v1/total 30 and staging v2/total 36. No app, pipeline, deployment-template,
credential or resource/security-limit change is included.

Preserve actual decisions, approval, timings, report hashes, runtime checks and
original HTTPS CSVs. Nine production requests failed during rollback although
the 30-second probe missed it; staging recorded 169 failures during the
deliberate fault/recovery. Retain build 7's pre-deployment process-limit error
and unchanged-limit runner restart. Document sampling and single-Droplet limits.

Update the manual, diagram, inventory, source/access links, runbooks, history
and AI log. Issue 28 was created during finalization with Vincent's approval;
it is not represented as a pre-implementation issue. Preserve CSV bytes and
JSON line endings for reproducible evidence hashes.

Validation: actual Jenkins 8 SUCCESS, 9 expected FAILURE before production,
10 SUCCESS; 12 control/3 app tests and source/dependency gates in each;
matching historical selectors; final HTTPS health/source/price/400 checks and
six monitoring targets up. Full manual build and affected-page visual review.
Existing coursework, earlier services and grading evidence retained.

Closes #28.

Record build 8's human-approved production rollback to the original v1 image/configuration, build 9's staging bind-mismatch block, and build 10's restored v2 staging deployment with changed=0 on rerun. Final production is healthy v1/total 30 and staging v2/total 36. No app, pipeline, deployment-template, credential or resource/security-limit change is included. Preserve actual decisions, approval, timings, report hashes, runtime checks and original HTTPS CSVs. Nine production requests failed during rollback although the 30-second probe missed it; staging recorded 169 failures during the deliberate fault/recovery. Retain build 7's pre-deployment process-limit error and unchanged-limit runner restart. Document sampling and single-Droplet limits. Update the manual, diagram, inventory, source/access links, runbooks, history and AI log. Issue 28 was created during finalization with Vincent's approval; it is not represented as a pre-implementation issue. Preserve CSV bytes and JSON line endings for reproducible evidence hashes. Validation: actual Jenkins 8 SUCCESS, 9 expected FAILURE before production, 10 SUCCESS; 12 control/3 app tests and source/dependency gates in each; matching historical selectors; final HTTPS health/source/price/400 checks and six monitoring targets up. Full manual build and affected-page visual review. Existing coursework, earlier services and grading evidence retained. Closes #28.
vsun1 added 1 commit 2026-11-16 05:08:44 +00:00
Finalize Assignment 8 recovery evidence and manual
vpn-dns-gateway/pipeline/pr-main This commit looks good
vpn-dns-gateway/pipeline/head This commit looks good
fbda9516fe
bill approved these changes 2026-11-16 05:15:25 +00:00
bill left a comment
Owner

Finally

Finally
All checks were successful
vpn-dns-gateway/pipeline/head This commit looks good
vpn-dns-gateway/pipeline/pr-main This commit looks good
Required
Details
You are not authorized to merge this pull request.
This pull request can be merged automatically.
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin codex/assignment8-final-evidence:codex/assignment8-final-evidence
git checkout codex/assignment8-final-evidence
Sign in to join this conversation.
No Reviewers
No labels
2 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: ssw590-group1/vpn-dns-gateway#29