Record completed rollback and staging recovery (closes #28) #29

Merged
vsun1 merged 1 commits from codex/assignment8-final-evidence into main 2026-11-26 03:09:42 +00:00
Owner

Record build 8's human-approved production rollback to the original v1
image/configuration, build 9's staging bind-mismatch block, and build 10's
restored v2 staging deployment with changed=0 on rerun. Final production is
healthy v1/total 30 and staging v2/total 36. No app, pipeline, deployment-template,
credential or resource/security-limit change is included.

Preserve actual decisions, approval, timings, report hashes, runtime checks and
original HTTPS CSVs. Nine production requests failed during rollback although
the 30-second probe missed it; staging recorded 169 failures during the
deliberate fault/recovery. Retain build 7's pre-deployment process-limit error
and unchanged-limit runner restart. Document sampling and single-Droplet limits.

Update the manual, diagram, inventory, source/access links, runbooks, history
and AI log. Issue 28 was created during finalization with Vincent's approval;
it is not represented as a pre-implementation issue. Preserve CSV bytes and
JSON line endings for reproducible evidence hashes.

Validation: actual Jenkins 8 SUCCESS, 9 expected FAILURE before production,
10 SUCCESS; 12 control/3 app tests and source/dependency gates in each;
matching historical selectors; final HTTPS health/source/price/400 checks and
six monitoring targets up. Full manual build and affected-page visual review.
Existing coursework, earlier services and grading evidence retained.

Closes #28.

Record build 8's human-approved production rollback to the original v1 image/configuration, build 9's staging bind-mismatch block, and build 10's restored v2 staging deployment with changed=0 on rerun. Final production is healthy v1/total 30 and staging v2/total 36. No app, pipeline, deployment-template, credential or resource/security-limit change is included. Preserve actual decisions, approval, timings, report hashes, runtime checks and original HTTPS CSVs. Nine production requests failed during rollback although the 30-second probe missed it; staging recorded 169 failures during the deliberate fault/recovery. Retain build 7's pre-deployment process-limit error and unchanged-limit runner restart. Document sampling and single-Droplet limits. Update the manual, diagram, inventory, source/access links, runbooks, history and AI log. Issue 28 was created during finalization with Vincent's approval; it is not represented as a pre-implementation issue. Preserve CSV bytes and JSON line endings for reproducible evidence hashes. Validation: actual Jenkins 8 SUCCESS, 9 expected FAILURE before production, 10 SUCCESS; 12 control/3 app tests and source/dependency gates in each; matching historical selectors; final HTTPS health/source/price/400 checks and six monitoring targets up. Full manual build and affected-page visual review. Existing coursework, earlier services and grading evidence retained. Closes #28.
vsun1 added 1 commit 2026-11-16 05:08:44 +00:00
Finalize Assignment 8 recovery evidence and manual
vpn-dns-gateway/pipeline/pr-main This commit looks good
vpn-dns-gateway/pipeline/head This commit looks good
fbda9516fe
bill approved these changes 2026-11-16 05:15:25 +00:00
bill left a comment
Owner

Finally

Finally
vsun1 merged commit 6064cce05e into main 2026-11-26 03:09:42 +00:00
Sign in to join this conversation.
No Reviewers
No labels
2 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: ssw590-group1/vpn-dns-gateway#29