This group document records the SSW 590 coursework and its supporting
|
||||
commands, designs, and evidence. Assignment 8 implements secure delivery with
|
||||
a trusted Jenkins agent, locked Flask/Gunicorn service, security gates,
|
||||
Ansible, scoped deployment credentials and recovery runbooks. The prerequisite
|
||||
jobs, DNS/TLS and deliberate Jenkins test/secret blocks passed. The reviewed v1
|
||||
images were published with passing scans. After the SSH and health-deadline
|
||||
corrections were reviewed, Jenkins builds 5 and 6 promoted v1 and v2 by exact
|
||||
digest through separate staging/production environments. Both unchanged reruns
|
||||
passed with zero changes; Vincent approved each production operation. The
|
||||
production probe and Grafana panel are live. One failed availability sample
|
||||
was observed during v2 replacement; zero downtime is not claimed. The actual
|
||||
release records and staging-only fault still require review before the healthy
|
||||
production rollback and failed-staging recovery demonstrations.
|
||||
This draft is not ready for submission.
|
||||
This group manual records SSW 590 coursework, commands, designs and evidence.
|
||||
Assignment 8 delivers a locked Flask/Gunicorn service through a trusted Jenkins
|
||||
agent, security gates, Ansible, scoped credentials and human approval. Reviewed
|
||||
builds 5 and 6 promoted v1/v2 by exact digest; both unchanged staging reruns
|
||||
passed with zero changes. Production monitoring is live. After review of the
|
||||
release records and fault/revert history, build 8 restored the original v1
|
||||
production image and configuration with Vincent's approval. Build 9 blocked
|
||||
the staging-only port mismatch; build 10 restored v2 with changed=0. Final
|
||||
production is v1 (total 30), staging v2 (total 36). Finer HTTPS sampling recorded
|
||||
nine failed production requests during rollback and 169 during the staging
|
||||
fault. The 30-second probe missed the brief rollback interruption but captured
|
||||
an earlier v2-release dip; zero downtime is not claimed. Technical demonstrations
|
||||
are complete, and this version is for group submission review. The tracking
|
||||
issue's late creation during finalization is disclosed.
|
||||
Assignment 7 introduced site reliability
|
||||
engineering: Prometheus, Grafana OSS, Node Exporter, and Blackbox Exporter
|
||||
run as four pinned containers beside Gitea and Jenkins on the originally 1\,GiB
|
||||
|
||||