Files
vpn-dns-gateway/manual/latex/abstract.tex
T
vsun1 fbda9516fe
vpn-dns-gateway/pipeline/head This commit looks good
vpn-dns-gateway/pipeline/pr-main This commit looks good
Finalize Assignment 8 recovery evidence and manual
2026-11-16 00:03:46 -05:00

29 lines
2.0 KiB
TeX

This group manual records SSW 590 coursework, commands, designs and evidence.
Assignment 8 delivers a locked Flask/Gunicorn service through a trusted Jenkins
agent, security gates, Ansible, scoped credentials and human approval. Reviewed
builds 5 and 6 promoted v1/v2 by exact digest; both unchanged staging reruns
passed with zero changes. Production monitoring is live. After review of the
release records and fault/revert history, build 8 restored the original v1
production image and configuration with Vincent's approval. Build 9 blocked
the staging-only port mismatch; build 10 restored v2 with changed=0. Final
production is v1 (total 30), staging v2 (total 36). Finer HTTPS sampling recorded
nine failed production requests during rollback and 169 during the staging
fault. The 30-second probe missed the brief rollback interruption but captured
an earlier v2-release dip; zero downtime is not claimed. Technical demonstrations
are complete, and this version is for group submission review. The tracking
issue's late creation during finalization is disclosed.
Assignment 7 introduced site reliability
engineering: Prometheus, Grafana OSS, Node Exporter, and Blackbox Exporter
run as four pinned containers beside Gitea and Jenkins on the originally 1\,GiB
DigitalOcean droplet, with Grafana at \url{https://metrics.yebilly.me/login}
for approved networks only. A dashboard shows host CPU, memory, and disk and
the HTTPS availability of Gitea and Jenkins. A 99\% availability objective is
defined and measured, and three alert rules (service availability, disk
space, and collection health) notify the team's Discord channel. Each was
shown firing and resolving; the availability rule through a planned Jenkins
outage that was detected in about two minutes and recovered about a minute
after restart. Earlier chapters retain the group's prior assignment
results, including the Jenkins merge gate and the Gitea Actions manual build.
On November 14 the team resized the droplet to 2\,GiB without enlarging its
disk, updated packages and verified the existing services.