Finalize Assignment 8 recovery evidence and manual
This commit is contained in:
+14
-14
@@ -1,17 +1,17 @@
|
||||
This group document records the SSW 590 coursework and its supporting
|
||||
commands, designs, and evidence. Assignment 8 implements secure delivery with
|
||||
a trusted Jenkins agent, locked Flask/Gunicorn service, security gates,
|
||||
Ansible, scoped deployment credentials and recovery runbooks. The prerequisite
|
||||
jobs, DNS/TLS and deliberate Jenkins test/secret blocks passed. The reviewed v1
|
||||
images were published with passing scans. After the SSH and health-deadline
|
||||
corrections were reviewed, Jenkins builds 5 and 6 promoted v1 and v2 by exact
|
||||
digest through separate staging/production environments. Both unchanged reruns
|
||||
passed with zero changes; Vincent approved each production operation. The
|
||||
production probe and Grafana panel are live. One failed availability sample
|
||||
was observed during v2 replacement; zero downtime is not claimed. The actual
|
||||
release records and staging-only fault still require review before the healthy
|
||||
production rollback and failed-staging recovery demonstrations.
|
||||
This draft is not ready for submission.
|
||||
This group manual records SSW 590 coursework, commands, designs and evidence.
|
||||
Assignment 8 delivers a locked Flask/Gunicorn service through a trusted Jenkins
|
||||
agent, security gates, Ansible, scoped credentials and human approval. Reviewed
|
||||
builds 5 and 6 promoted v1/v2 by exact digest; both unchanged staging reruns
|
||||
passed with zero changes. Production monitoring is live. After review of the
|
||||
release records and fault/revert history, build 8 restored the original v1
|
||||
production image and configuration with Vincent's approval. Build 9 blocked
|
||||
the staging-only port mismatch; build 10 restored v2 with changed=0. Final
|
||||
production is v1 (total 30), staging v2 (total 36). Finer HTTPS sampling recorded
|
||||
nine failed production requests during rollback and 169 during the staging
|
||||
fault. The 30-second probe missed the brief rollback interruption but captured
|
||||
an earlier v2-release dip; zero downtime is not claimed. Technical demonstrations
|
||||
are complete, and this version is for group submission review. The tracking
|
||||
issue's late creation during finalization is disclosed.
|
||||
Assignment 7 introduced site reliability
|
||||
engineering: Prometheus, Grafana OSS, Node Exporter, and Blackbox Exporter
|
||||
run as four pinned containers beside Gitea and Jenkins on the originally 1\,GiB
|
||||
|
||||
@@ -1050,3 +1050,59 @@ still require those reviewed commits and measured evidence. Codex updated
|
||||
current inventory, architecture, runbooks, history and this record, then rebuilt
|
||||
and visually checked the ignored local PDF. Existing Billy/Claude records and
|
||||
historical execution evidence were preserved.
|
||||
|
||||
\section{Completed Rollback and Staging Recovery}
|
||||
Date: November 15, 2026 Eastern (November 16 UTC); Tool: OpenAI Codex;
|
||||
Human: Vincent Sun; Reviewer of preceding PR: Billy Ye. Vincent reported
|
||||
PR~\#27 merged and asked Codex to finish. Codex reread repository requirements
|
||||
and status, fetched main, verified Billy's 04:12:09 UTC approval and Vincent's
|
||||
04:14:30 merge, and created \texttt{codex/assignment8-final-evidence} from
|
||||
\texttt{72bf10d}. Actions workflow 16 passed before recovery. No commit or
|
||||
push was performed by Codex.
|
||||
|
||||
Codex recorded the healthy-v2 rollback decision and started the reviewed HTTPS
|
||||
observer on The-Ocean. Build 7 stopped before deployment with \texttt{Cannot
|
||||
fork}; task-limit pressure was observed, but its underlying accumulation cause
|
||||
was not established. Codex restarted only the idle delivery agent without
|
||||
raising limits or changing identity, workspace or image. Build 8 passed tests
|
||||
and source gates, then requested a real human production approval. Vincent
|
||||
clicked it himself; Codex verified the archived \texttt{vsun1} identity and
|
||||
04:23:36 UTC decision. The job restored the original v1 image and matching
|
||||
configuration, then verified source, health and total 30. Its deployment took
|
||||
63.904 seconds; the observer captured nine failed requests. The original
|
||||
12.641-second gap between adjacent successful response completions is not
|
||||
claimed as an exact continuous outage.
|
||||
|
||||
A separate staging observer preceded build 9's explicitly selected reviewed
|
||||
port-mismatch configuration. The same v2 digest was retained; Compose wait
|
||||
reported unhealthy and blocked Jenkins before production. Codex captured the
|
||||
failed state and production isolation, then ran build 10 with the original
|
||||
good v2 staging record. It restored the historical playbook/template with
|
||||
\texttt{git archive}, verified v2/source/total 36 and passed changed=0 on rerun.
|
||||
The staging observer captured 169 failed requests; its adjacent successful
|
||||
responses were 172.650 seconds apart, including collection/selection and new-job
|
||||
gates as well as deployment. No image was rebuilt for either recovery.
|
||||
|
||||
Codex preserved exact Jenkins reports, hashes and actual timing. A final runtime
|
||||
capture confirmed production v1/staging v2, correct digests/configuration,
|
||||
invalid-input HTTP 400 and six targets up. The 30-second production probe
|
||||
missed the rollback interruption seen by the finer observer; the actual Grafana
|
||||
chart was flat. No alert-notification history or zero-downtime claim was
|
||||
invented. The first new Grafana screenshot was taken while its panel was still
|
||||
loading; it was replaced only after the chart visibly rendered. Both task
|
||||
observers were stopped by verified PID after post-recovery samples. Original
|
||||
CSV bytes were recopied and checked over pinned SSH; an earlier helper's
|
||||
normalized-text hash is explicitly distinguished from the original byte hash.
|
||||
Git attributes preserve the committed CSV bytes and runtime JSON line endings.
|
||||
|
||||
The assignment requires a tracking issue; none existed. Codex prepared a
|
||||
concrete issue with actual completed-run links and asked Vincent before
|
||||
publishing a project message under his account. Vincent explicitly replied
|
||||
``Yes, publish the prepared issue.'' Codex created issue~\#28 at 04:33:40 UTC
|
||||
and verified it. This late creation is disclosed, not backdated. It prepared
|
||||
the final evidence PR description, source/access links, measured timeline and
|
||||
CSV-derived figure; updated the Hosts table/diagram to production v1 and
|
||||
staging v2, Document History and this log; and prepared the complete TinyTeX
|
||||
build and visual review. Passwords hints, credentials, permissions, earlier
|
||||
coursework, Billy/Claude records and shared services were preserved.
|
||||
Vincent handles final commits/pushes and submission; Billy reviews the final PR.
|
||||
|
||||
@@ -36,8 +36,8 @@
|
||||
% Replace these values for each assignment.
|
||||
\newcommand{\AssignmentTitle}{Secure Delivery and Rollback -- Group}
|
||||
\newcommand{\AssignmentNumber}{8}
|
||||
\newcommand{\DocumentVersion}{6.3}
|
||||
\newcommand{\DocumentStatus}{Draft}
|
||||
\newcommand{\DocumentVersion}{6.4}
|
||||
\newcommand{\DocumentStatus}{For submission review}
|
||||
\newcommand{\CourseNumber}{SSW 590}
|
||||
\newcommand{\CourseName}{DevOps}
|
||||
\newcommand{\Authors}{Vincent Sun and Billy Ye}
|
||||
|
||||
@@ -12,6 +12,7 @@ link each entry to the changed chapter, table, figure, or controlled artifact.
|
||||
\multicolumn{4}{l}{\small\itshape Document Update History (continued)}\\
|
||||
\toprule \textbf{Date / Version} & \textbf{Author Initials} & \textbf{Change} & \textbf{Changed At}\\ \midrule
|
||||
\endhead \bottomrule \endlastfoot
|
||||
November 15, 2026 / 6.4 & VS, BY, CDX & Verified Billy's PR~\#27 review and Vincent's merge; completed human-approved production rollback (build 8), blocked staging fault (9), and original-configuration recovery with changed=0 (10). Preserved build 7's pre-deployment runner error, measured HTTPS interruptions and monitoring sampling limits. Added original CSVs, hashes, runtime state, timelines, source/access links and final evidence; created issue~\#28 with Vincent's approval during finalization. Updated the Hosts table and architecture to production v1/staging v2; Passwords hints and permissions are unchanged. Prepared the complete manual for submission review. & \ChapterRef{SecureDelivery}, \ChapterRef{HostsPasswords}, \ChapterRef{AIPromptLog}\\
|
||||
November 15, 2026 / 6.3 & BY, VS, CDX & Recorded PR~\#26's review/merge and successful Jenkins v1/v2 releases 5/6, zero-change reruns, actual vsun1 approvals and identical per-release staging/production digests. Saved the four real selectors for review. Applied the reviewed production probe/panel after healthy v1, verified live targets/Grafana and preserved one HTTP 502 sample during v2 replacement. Updated both-app inventory and architecture; prepared a staging-only fault patch and reviewed-history/revert procedure for the still-pending recovery exercises. Passwords hints and access scopes are unchanged. & \ChapterRef{SecureDelivery}, \ChapterRef{HostsPasswords}, \ChapterRef{AIPromptLog}\\
|
||||
November 15, 2026 / 6.2 & VS, CDX & Verified PR~\#25's review/merge and ran pricing build 4: scans/publication and initial staging checks passed; the unchanged rerun blocked at the three-second Docker health deadline. Tested ten seconds under identical limits in an isolated temporary container: eight checks passed, then the container was removed. Prepared the health correction and separate v2 source/test change for one review preserving both commits. Updated staging inventory, diagram and actual evidence; Passwords hints are unchanged. No production approval or completed release is claimed. & \ChapterRef{SecureDelivery}, \ChapterRef{HostsPasswords}, \ChapterRef{AIPromptLog}\\
|
||||
November 15, 2026 / 6.1 & VS, CDX & Verified Billy's latest review and Vincent's merge of PR~\#24; enabled delivery and recorded real blocked-test/secret runs and the first scanned, published v1 image. Preserved the staging SSH failure before any app change. Set Ansible to avoid PTY allocation and verified its credential-bound connection/sudo path in preflight build 3; the correction awaits review/merge before a release retry. Updated current evidence and retained the incomplete-submission status. Hosts and Passwords tables are unchanged: no service, account, credential or permission was added. & \ChapterRef{SecureDelivery}, \ChapterRef{AIPromptLog}\\
|
||||
|
||||
@@ -30,9 +30,11 @@ while the undeployed application backends returned 502. Later that evening
|
||||
(November 16 UTC), build 4 deployed staging v1 and verified its HTTPS identity
|
||||
and price; its unchanged rerun stopped on a Docker health timeout. Production
|
||||
was still absent at that point. The subsequent reviewed builds 5 and 6 promoted
|
||||
both versions with Vincent's approvals; staging and production are now v2.
|
||||
Their unchanged reruns passed. The production probe and Grafana panel were
|
||||
added after healthy production. No credential or permission changed during these runs.
|
||||
both versions with Vincent's approvals; their unchanged reruns passed.
|
||||
After PR~\#27, build 8 rolled production back to v1; build 9 blocked the
|
||||
staging-only fault; build 10 restored staging v2 with changed=0. Final production
|
||||
is v1 and staging v2. The production probe and Grafana panel were added after
|
||||
healthy production. No credential or permission changed during these runs.
|
||||
|
||||
\section{Hosts}
|
||||
\small
|
||||
@@ -57,7 +59,9 @@ public-IP host-key alias. Docker socket control grants host administration.
|
||||
Named identity/workspace and BuildKit cache volumes stay outside Git;
|
||||
configuration under \path{/opt/ssw590-delivery-agent/}; restart unless stopped.
|
||||
Prerequisite builds 2/3 and preparation trials passed; pricing builds 5/6
|
||||
completed both promotions. Campus rehearsal and both recovery exercises remain pending.\\
|
||||
completed both promotions; builds 8--10 completed both recovery cases. Build 7
|
||||
stopped before deployment at the process limit; restarting only the idle agent
|
||||
cleared the condition without raising limits. Campus rehearsal remains pending.\\
|
||||
Environment & Course production (team use)\\
|
||||
Provider & DigitalOcean, NYC1; Ubuntu 24.04 LTS; 1 vCPU; resized from
|
||||
512\,MB to 1\,GiB in October, then to 2\,GiB on November 14, 2026
|
||||
@@ -80,12 +84,13 @@ each; Blackbox runs as \texttt{nobody}) on network \texttt{monitoring\_monitorin
|
||||
\texttt{monitoring\_prometheus\_data} (7\,d / 500\,MB) and
|
||||
\texttt{monitoring\_grafana\_data}\\
|
||||
Pricing applications & Separate Compose projects/aliases
|
||||
\texttt{pricing-staging} and \texttt{pricing-production}, currently v2 on private
|
||||
\texttt{pricing-staging} (v2) and \texttt{pricing-production} (v1), on private
|
||||
port 8000. Each: 64/96 MiB RAM/RAM+swap, 0.25 CPU, 64 PIDs, UID 10001,
|
||||
read-only root, 16 MiB /tmp, ten-second overall health deadline and no host
|
||||
port or app data volume. Separate configuration/release directories:
|
||||
\texttt{/opt/startup/pricing-\{staging,production\}}.
|
||||
Both versions passed promotion and unchanged staging reruns.\\
|
||||
Both versions passed promotion and unchanged staging reruns; production was
|
||||
then rolled back to v1 and staging recovered to v2.\\
|
||||
Exposed ports & 443/TCP and 80/TCP to all; 22/TCP to approved team addresses only
|
||||
(Cloud Firewall \texttt{gitea-fw}); \texttt{ci.yebilly.me} and
|
||||
\texttt{metrics.yebilly.me} answer only Stevens 155.246.0.0/16 and team
|
||||
@@ -94,8 +99,9 @@ otherwise; monitoring ports 9090, 9100, 9115 not reachable\\
|
||||
Owner & BY (server administration); VS (review)\\
|
||||
HTTPS URLs & \url{https://git.yebilly.me}, \url{https://ci.yebilly.me/login},
|
||||
\url{https://metrics.yebilly.me/login}; \url{https://staging.yebilly.me} and
|
||||
\url{https://app.yebilly.me} have trusted certificates. Both were verified
|
||||
as healthy v2, source \texttt{6bddbfb}, total 36, with invalid input HTTP 400\\
|
||||
\url{https://app.yebilly.me} have trusted certificates. Final verification:
|
||||
staging v2/source \texttt{6bddbfb}/total 36; production v1/source
|
||||
\texttt{34f26e6}/total 30. Both healthy; invalid input HTTP 400\\
|
||||
Backup status & No scheduled backup job; manual Gitea SQLite and Jenkins-home
|
||||
backups saved in a protected root directory before the November 14 delivery
|
||||
bootstrap. Container-replacement persistence verified for
|
||||
@@ -106,7 +112,8 @@ Gitea (\ChapterRef{GiteaFoundation}), restart persistence for Jenkins
|
||||
Monitoring status & Prometheus and Grafana: host CPU, memory, root disk, and
|
||||
HTTPS probes of Gitea, Jenkins and pricing production every 30\,s; Grafana
|
||||
retains seven earlier panels plus pricing availability. One production HTTP 502
|
||||
sample was recorded during v2 replacement (\ChapterRef{SecureDelivery}); no
|
||||
sample was recorded during v2 replacement. The 30-second probe missed nine
|
||||
finer observer failures during rollback (\ChapterRef{SecureDelivery}); no
|
||||
zero-downtime or app alert-notification claim is made. Existing alerts \emph{HTTPS service
|
||||
down}, \emph{Root disk space low}, and \emph{Monitoring target down} to Discord \texttt{\#devops-alerts}.
|
||||
Shares the droplet's failure domain; no external check yet (issue~\#20)\\
|
||||
|
||||
@@ -12,9 +12,11 @@ job is enabled, and reviewed Jenkins builds 5 and 6 successfully promoted v1
|
||||
and v2 through staging and production using exact digests. Both unchanged
|
||||
staging reruns passed with zero changes, and Vincent approved each production
|
||||
operation in Jenkins. Production monitoring is live. The actual successful
|
||||
records are prepared for review before the two recovery exercises.
|
||||
\textbf{It is not ready for submission.} Healthy production rollback, deliberate
|
||||
staging failure/recovery and their measured timelines remain pending.
|
||||
records and staging-only fault/revert were reviewed in PR~\#27. Build 8 then
|
||||
restored healthy production v1 after Vincent's approval; build 9 blocked the
|
||||
staging fault, and build 10 restored staging v2 with changed=0. Both recovery
|
||||
cases and measured evidence are complete. The final state is production v1,
|
||||
staging v2. This version awaits final group review and submission.
|
||||
|
||||
The instructor's v1 source and tests were copied from
|
||||
\path{Examples/dosSecureDelivery/v1/} to \path{delivery/app/}. Flask validates
|
||||
@@ -44,7 +46,7 @@ identity and pricing are verified separately.
|
||||
\node[box] (monitor) at (0,-2.8) {Prometheus, Grafana,\\Blackbox and Node Exporter\\Private metrics ports};
|
||||
\node[box] (proxy) at (4.8,-2.8) {Caddy TLS proxy\\Public 80/443\\Private \texttt{gitea\_web} network};
|
||||
\node[box] (stage) at (9.6,-2.8) {Staging v2\\\texttt{staging.yebilly.me}\\{\scriptsize\texttt{pricing-staging:8000}}};
|
||||
\node[box] (prod) at (9.6,-5.2) {Production v2\\\texttt{app.yebilly.me}\\{\scriptsize\texttt{pricing-production:8000}}};
|
||||
\node[box] (prod) at (9.6,-5.2) {Production v1\\\texttt{app.yebilly.me}\\{\scriptsize\texttt{pricing-production:8000}}};
|
||||
\node[data,text width=12.9cm,align=left] (storage) at (4.8,-8.45) {
|
||||
\textbf{Persistent state and read-only mounts on The-Ocean}\\[3pt]
|
||||
\begin{tabular}{@{}ll@{}}
|
||||
@@ -72,8 +74,8 @@ App configuration & \texttt{/opt/startup/pricing-\{staging,production\}}; no app
|
||||
\draw[flow] (proxy)--node[note,above]{HTTP}(stage);
|
||||
\draw[flow] (proxy.south east)--node[note,above,sloped]{HTTP}(prod.north west);
|
||||
\end{tikzpicture}}
|
||||
\caption{Current architecture after both releases: staging and production v2
|
||||
are installed, and the production health probe is live. Gray boxes identify durable state
|
||||
\caption{Current architecture after both recovery cases: staging is v2 and
|
||||
production has been rolled back to v1; the production health probe is live. Gray boxes identify durable state
|
||||
or read-only mounts. Pricing is stateless; each environment retains only its
|
||||
Compose and release files on the host. The agent and builder now share the
|
||||
droplet; deployment SSH uses Docker's host gateway with the original pinned
|
||||
@@ -185,7 +187,7 @@ node and disabled release job. No token or private key was printed or copied
|
||||
into the repository. Private bootstrap inputs were removed after Jenkins stored
|
||||
the credentials; generated agent identity stays in protected named volumes.
|
||||
|
||||
\section{Prepared Pipeline and Release Records}
|
||||
\section{Pipeline and Release Records}
|
||||
The normal release path is checkout of reviewed main ancestry, control and
|
||||
application tests, repository-secret and dependency checks, build, image scan,
|
||||
registry push/pull, exact digest recording, staging deployment, unchanged rerun,
|
||||
@@ -219,11 +221,12 @@ timing and makes a nonzero changed count on the unchanged rerun a blocking error
|
||||
\small
|
||||
\begin{tabularx}{\linewidth}{L{2.1cm}Y Y}
|
||||
\toprule Traceability field & v1 & v2\\\midrule
|
||||
Source / config commits & Reviewed \texttt{34f26e6} & Reviewed \texttt{6bddbfb}\\
|
||||
Registry digest / Jenkins release build & Exact digest; build 5 SUCCESS & Exact digest; build 6 SUCCESS\\
|
||||
Source / config commits & \href{https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/commit/34f26e6948b7001ede8ca19f23b67a02082e6a9a}{Reviewed 34f26e6} & \href{https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/commit/6bddbfba5a36e0e397537678ffb197e101fb0670}{Reviewed 6bddbfb}\\
|
||||
Registry digest / Jenkins release build & Exact digest below; \href{https://ci.yebilly.me/job/secure-delivery/job/pricing/5/}{build 5 SUCCESS} & Exact digest below; \href{https://ci.yebilly.me/job/secure-delivery/job/pricing/6/}{build 6 SUCCESS}\\
|
||||
Publication image scans & 2 targets; zero HIGH/CRITICAL, before push and by pulled digest & 2 targets; zero HIGH/CRITICAL, before push and by pulled digest\\
|
||||
Staging + unchanged rerun & Passed; changed=0 on rerun & Passed; changed=0 on rerun\\
|
||||
Production approval / result & \texttt{vsun1}; total 30 verified & \texttt{vsun1}; total 36 verified\\
|
||||
Recovery evidence & Healthy rollback pending & Staging failure/recovery pending\\
|
||||
Production approval / UTC & \texttt{vsun1}; 03:04:01; total 30 verified & \texttt{vsun1}; 03:11:18; total 36 verified\\
|
||||
Recovery evidence & \href{https://ci.yebilly.me/job/secure-delivery/job/pricing/8/}{Build 8}: original v1 restored & \href{https://ci.yebilly.me/job/secure-delivery/job/pricing/9/}{Build 9} blocked; \href{https://ci.yebilly.me/job/secure-delivery/job/pricing/10/}{10} recovered; changed=0\\
|
||||
\bottomrule
|
||||
\end{tabularx}
|
||||
\normalsize
|
||||
@@ -352,7 +355,8 @@ following section records their subsequent assessed Jenkins runs.
|
||||
Vincent kept the v1 health fix and v2 app/tests in separate commits within
|
||||
PR~\#26. Billy reviewed both; the merge preserved their SHAs for explicit
|
||||
Jenkins selection. Each then passed the full release path and its own real
|
||||
human approval. The actual successful selectors now await review before recovery.
|
||||
human approval. PR~\#27 subsequently reviewed the actual successful selectors
|
||||
and preserved the separate staging fault and restoration commits before recovery.
|
||||
|
||||
\section{Successful v1 and v2 Releases}
|
||||
Billy approved PR~\#26 at 02:56:00 UTC on November 16 (November 15 Eastern).
|
||||
@@ -404,9 +408,9 @@ sha256:efe8658a0adf0854038d58199652030cbd0ef70047a1c6ebc7b09906cf1ec88b
|
||||
\end{minipage}\par\smallskip
|
||||
|
||||
The four JSON files under \path{delivery/releases/} are copied unchanged from
|
||||
these successful builds and pass the strict selector validation. They still
|
||||
need review/commit before recovery; earlier failed-attempt records were not
|
||||
substituted. Jenkins archives the full tests, scans, recaps and actual approval
|
||||
these successful builds and pass the strict selector validation. PR~\#27
|
||||
reviewed and merged them before recovery; earlier failed-attempt records were
|
||||
not substituted. Jenkins archives the full tests, scans, recaps and actual approval
|
||||
records. Dated human-readable and machine-readable evidence under
|
||||
\path{delivery/evidence/} preserves their timestamps, results and scan-report
|
||||
hashes. Full local archives remain in the ignored execution evidence directory.
|
||||
@@ -452,17 +456,192 @@ in the dated runtime JSON. The display uses Eastern time.}
|
||||
\label{Figure:DeliveryProductionMonitoring}
|
||||
\end{figure}
|
||||
|
||||
\section{Recovery Exercises and Timeline}
|
||||
Billy approved \href{https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/pulls/27}{PR~\#27}
|
||||
at 04:12:09 UTC on November 16 (November 15 Eastern); Vincent merged it at
|
||||
04:14:30 as \texttt{72bf10d}. The merge preserved the four actual release
|
||||
records, staging-only fault \texttt{1e23001} and immediate revert
|
||||
\texttt{29e580c}; the final main template remained correct. Actions workflow
|
||||
16 passed in 2m17s before the recovery jobs. Builds 7--10 used that reviewed
|
||||
main for control code; their records independently selected the historical
|
||||
image and Ansible configuration. Full results, report hashes, selected runtime
|
||||
state and original observer CSVs are versioned under \path{delivery/evidence/}
|
||||
as \path{recovery-20261115.md}, its JSON companion, the runtime JSON and the
|
||||
production/staging CSVs. CSV byte hashes were checked against the remote
|
||||
originals; Git attributes preserve them across checkouts.
|
||||
|
||||
\subsection{Healthy Production Rollback}
|
||||
This was an authorized exercise on healthy v2, not an invented production
|
||||
incident. The decision was recorded at 04:17:46.307 UTC; the reviewed HTTPS
|
||||
observer started before approval. The first attempt,
|
||||
\href{https://ci.yebilly.me/job/secure-delivery/job/pricing/7/}{build 7}, stopped
|
||||
after 17.784 seconds during test setup with \texttt{Cannot fork}, before any
|
||||
deployment or approval. The agent reported about 115 tasks against its 128
|
||||
limit and two process-limit events, with no OOM kill. Its process listing
|
||||
showed Java only; the underlying accounting/accumulation mechanism was not
|
||||
established. Only the idle delivery-agent container was restarted, preserving
|
||||
identity, workspace, image and resource/security limits. Immediate task count
|
||||
fell to 13. Earlier services and both apps stayed running; no limit was raised.
|
||||
|
||||
\small
|
||||
\begin{tabularx}{\linewidth}{L{4.4cm}Y}
|
||||
\toprule Production rollback event & Actual UTC / result\\\midrule
|
||||
\href{https://ci.yebilly.me/job/secure-delivery/job/pricing/8/}{Build 8} & SUCCESS; 04:22:04.875--04:24:48.529; 163.654 s including human wait\\
|
||||
Actual human approval & \texttt{vsun1}; 04:23:36\\
|
||||
Ansible rollback start & 04:23:42.801\\
|
||||
First observed v1 response complete & 04:24:25.313; health request began 04:24:23.645\\
|
||||
Ansible verification complete & 04:24:46.705; 63.904 s; ok=10 changed=3 unreachable=0 failed=0\\
|
||||
Restored release & Original v1 digest/configuration \texttt{34f26e6}; HTTPS health, exact source and total 30 passed\\
|
||||
\bottomrule
|
||||
\end{tabularx}
|
||||
\normalsize
|
||||
|
||||
The rollback reused the original build-5 digest and restored its matching
|
||||
Ansible playbook/template with \texttt{git archive}; no image was rebuilt or
|
||||
published. Twelve control tests, three app tests, source-secret and all nine
|
||||
dependency gates passed. The prior passing image scans remain linked to the
|
||||
same exact digest. Deployment-start to first observed v1 response completion
|
||||
was 42.512 seconds. The longer decision-to-recovery timeline includes the
|
||||
runner error, troubleshooting and real approval wait; these are distinct from
|
||||
deployment time and traffic interruption.
|
||||
|
||||
The production observer captured 863 requests from 04:17:46.447 to
|
||||
04:32:10.607, with \textbf{nine failed requests}: eight HTTP 502 responses and
|
||||
one timeout. The first failed request began 04:24:13.629. Adjacent successful
|
||||
response completions were 04:24:12.672 (v2) and 04:24:25.313 (v1), 12.641
|
||||
seconds apart. This does not establish an exact continuous outage; time
|
||||
between samples remains unobserved. The maximum request-start gap was 2.015
|
||||
seconds because a two-second timeout delays the nominal one-second cadence.
|
||||
|
||||
\subsection{Staging-Only Failure and Configuration Recovery}
|
||||
\href{https://ci.yebilly.me/job/secure-delivery/job/pricing/9/}{Build 9}
|
||||
selected the committed good v2 staging record and the full reviewed bad
|
||||
configuration commit:
|
||||
\begin{Verbatim}[fontsize=\footnotesize,frame=single]
|
||||
1e23001e7303d14630cfa97c8de36f31f30b81a0
|
||||
\end{Verbatim}
|
||||
Only the runtime configuration selection changed; the existing v2 digest was
|
||||
reused. Gunicorn bound to 8001 while image health and Caddy still used 8000.
|
||||
Compose reported the container unhealthy and the Jenkins run ended FAILURE.
|
||||
The command retained \texttt{--wait --wait-timeout 90}; Ansible blocked after
|
||||
86.690 seconds including earlier tasks, with \texttt{ok=4 changed=1
|
||||
unreachable=0 failed=1} and exit code 2. The unchanged rerun and both production
|
||||
stages were skipped. No host daemon, proxy or earlier service was altered to
|
||||
create this failure.
|
||||
|
||||
At 04:28:54.827 UTC staging was unhealthy and returned HTTP 502 while
|
||||
production remained healthy v1, total 30. The failed run did not reach the
|
||||
last metadata-copy task: host \path{release.json} still described the last
|
||||
successful release while Compose was bad. That file alone is not health
|
||||
evidence. The final main template had already been restored by the reviewed
|
||||
revert; the recovery job selected the original good v2 configuration from its
|
||||
unchanged record, rather than rebuilding the image or selecting the bad SHA.
|
||||
|
||||
\small
|
||||
\begin{tabularx}{\linewidth}{L{4.4cm}Y}
|
||||
\toprule Staging event & Actual UTC / result\\\midrule
|
||||
Decision / observer start & 04:25:23.940 / 04:25:24.078\\
|
||||
Failed Ansible deployment & 04:26:25.354--04:27:52.043; 86.690 s; build 9 blocked\\
|
||||
First failed request & 04:26:53.130\\
|
||||
\href{https://ci.yebilly.me/job/secure-delivery/job/pricing/10/}{Build 10 recovery} began & 04:28:38.093\\
|
||||
Recovery Ansible deployment & 04:29:10.106--04:30:06.603; 56.497 s; ok=10 changed=2 failed=0\\
|
||||
First recovered v2 response complete & 04:29:44.923; health request began 04:29:43.205\\
|
||||
Unchanged Ansible rerun & 04:30:10.352--04:30:58.451; 48.099 s; ok=10 changed=0 failed=0\\
|
||||
Recovery job ended & 04:30:59.765 SUCCESS; 141.672 s total\\
|
||||
\bottomrule
|
||||
\end{tabularx}
|
||||
\normalsize
|
||||
|
||||
Build 10 restored the recorded \texttt{6bddbfb} playbook/template and the same
|
||||
v2 image. Actual HTTPS health, baked source and total 36 passed, followed by
|
||||
the zero-change rerun. Staging sampling captured 406 requests, with 169 failures
|
||||
(168 HTTP 502 and one timeout). Adjacent successful response completions were
|
||||
04:26:52.273 and 04:29:44.923, 172.650 seconds apart; this includes the
|
||||
deliberate failure, collection/selection and new-job gates as well as recovery.
|
||||
It is not Ansible duration or an exact continuous outage. Maximum request-start
|
||||
gap was 2.018 seconds. Production had no additional failed observer requests
|
||||
during this staging exercise, and its Compose hash stayed unchanged.
|
||||
|
||||
\begin{figure}[htbp]
|
||||
\centering
|
||||
\renewcommand{\theHfigure}{delivery.observer.\arabic{figure}}
|
||||
\includegraphics[width=\linewidth]{images/assignment8-recovery-observers-20261115.png}
|
||||
\caption{Actual HTTPS samples on November 16 UTC: healthy production rollback
|
||||
to v1, then the separate staging v2 fault and recovery. Lines join request-start
|
||||
samples; gaps between requests remain unobserved. Original CSVs and hashes are
|
||||
retained. The staging observer began at 04:25:24.}
|
||||
\label{Figure:DeliveryRecoveryObservers}
|
||||
\end{figure}
|
||||
|
||||
\begin{figure}[htbp]
|
||||
\centering
|
||||
\renewcommand{\theHfigure}{delivery.failure.\arabic{figure}}
|
||||
\includegraphics[width=\linewidth,trim=360bp 0bp 0bp 0bp,clip]{images/assignment8-staging-failure-9-20261115.jpg}
|
||||
\caption{Staging v2, build 9, November 16 at 04:27:57 UTC: unhealthy-container
|
||||
failure, failed recap and both production stages skipped. The original v2
|
||||
image was retained; the reviewed command-only fault was not promoted.}
|
||||
\label{Figure:DeliveryStagingFailure}
|
||||
\end{figure}
|
||||
|
||||
\begin{figure}[htbp]
|
||||
\centering
|
||||
\renewcommand{\theHfigure}{delivery.recovery.\arabic{figure}}
|
||||
\includegraphics[width=\linewidth,trim=360bp 0bp 0bp 0bp,clip]{images/assignment8-staging-recovery-10-20261115.jpg}
|
||||
\caption{Recovered staging v2, build 10, November 16 at 04:30:59 UTC: original
|
||||
configuration restored, unchanged rerun \texttt{changed=0}, production stages
|
||||
excluded and final SUCCESS. Production stays at rolled-back v1.}
|
||||
\label{Figure:DeliveryStagingRecovery}
|
||||
\end{figure}
|
||||
|
||||
\subsection{Monitoring Correlation and Final Verification}
|
||||
The 34 production-probe samples since the rollback decision were all 1 at the
|
||||
04:34:28 UTC capture: the 30-second probe missed the interruption that the
|
||||
finer observer measured. Grafana's production chart is correspondingly flat
|
||||
over this exercise (Figure~\ref{Figure:DeliveryRecoveryMonitoring}). This does
|
||||
not contradict the earlier real v2-release dip. The captured 90-minute
|
||||
\texttt{ALERTS} query returned no series; no notification history was collected
|
||||
and no Discord-notification claim is made. The production-only panel does not
|
||||
measure staging; its separate CSV captures that intentional failure.
|
||||
|
||||
At 04:34:28.765 UTC both containers were healthy: production v1, source
|
||||
\texttt{34f26e6}, total 30; staging v2, source \texttt{6bddbfb}, total 36.
|
||||
Both retained their original digest and matching restored configuration,
|
||||
returned HTTP 400 for quantity 0, and published no host application port.
|
||||
All six scrape targets were up and all three HTTPS probes were 1. The observers
|
||||
were intentionally stopped after post-recovery samples, before their 1,800-second
|
||||
maximum, by signaling only their verified task PIDs. They share the droplet's
|
||||
failure domain; they are not off-site uptime monitoring.
|
||||
|
||||
The capacity snapshot showed 1,967 MiB RAM with 660 MiB available, 476 of
|
||||
2,047 MiB swap used, and 8.9 GiB root space available (62\% used). Production
|
||||
and staging used 32.53 and 33.68 MiB; the agent used 131.9/512 MiB, with
|
||||
71/128 tasks and zero new process-limit events since restart. Grafana used
|
||||
188.4/192 MiB. These are point samples, not a load/soak test or a guarantee
|
||||
against future pressure. Keep manual and delivery jobs sequential on the
|
||||
shared CPU and investigate renewed process-limit events before retrying.
|
||||
|
||||
\begin{figure}[htbp]
|
||||
\centering
|
||||
\renewcommand{\theHfigure}{delivery.recoverymonitor.\arabic{figure}}
|
||||
\includegraphics[width=\linewidth,trim=320bp 0bp 0bp 0bp,clip]{images/assignment8-recovery-monitoring-20261115.jpg}
|
||||
\caption{Actual Grafana view after recovery, November 15 Eastern (November 16
|
||||
UTC). Production and prior service probes remain up at scrape times. The flat
|
||||
production line misses the short rollback interruption shown by the finer
|
||||
CSV sampler; it is not evidence of zero downtime.}
|
||||
\label{Figure:DeliveryRecoveryMonitoring}
|
||||
\end{figure}
|
||||
|
||||
\section{Release, Recovery and Monitoring Runbooks}
|
||||
The versioned \path{delivery/RUNBOOKS.md} gives the executable sequence.
|
||||
Vincent handles commits/pushes; Billy reviews repository changes. The v1
|
||||
preparation is now on main, DNS/TLS are ready, and the two deliberate gate
|
||||
demonstrations and both reviewed releases have run. The four successful release
|
||||
records must now be reviewed/committed before recovery. The patch in
|
||||
\path{delivery/exercises/} defines a staging-only port mismatch. Preserve a
|
||||
reviewed intermediate bad-configuration commit followed by its immediate revert;
|
||||
the final main template remains correct. Billy must review all three commits
|
||||
(records, fault, restoration), and a merge commit must preserve the bad SHA.
|
||||
Only the explicit staging-failure job selects that historical configuration.
|
||||
records and the staging-only fault/revert were reviewed in PR~\#27, and both
|
||||
recoveries are complete. The procedure and patch under
|
||||
\path{delivery/exercises/} retain the reviewed intermediate fault and restoration
|
||||
history; final main remains correct. Only the explicit staging-failure job
|
||||
selects that bad historical configuration. No repeat fault is needed for this
|
||||
submission. The following instructions support later authorized operations.
|
||||
|
||||
For healthy production rollback, record detection/decision time, start the
|
||||
HTTPS observer, select the committed v1 production record and approve the
|
||||
@@ -483,7 +662,7 @@ the failure.
|
||||
The production \texttt{/health} probe and Grafana availability panel are now
|
||||
live, as verified above. Future changes must preserve the existing Gitea/Jenkins
|
||||
probes and host metrics. Correlate actual Prometheus/Grafana samples with the
|
||||
remaining rollback and recovery times; 30-second scrapes and
|
||||
actual rollback and recovery times; 30-second scrapes and
|
||||
alert durations can miss a brief interruption. Uptime probes do not verify
|
||||
pricing. The observer in \path{delivery/ci/observe.py} records finer HTTPS
|
||||
samples without treating an intended failure as an observer-script failure.
|
||||
@@ -494,7 +673,7 @@ compatible expand/migrate/contract approach keeps both old and new code working
|
||||
during migration and delays destructive changes until rollback is no longer
|
||||
needed. This assignment does not add a database.
|
||||
|
||||
\section{Outstanding Work and Cleanup Boundary}
|
||||
\section{Source Links, Grader Access and Cleanup Boundary}
|
||||
Billy added A records for \texttt{staging} and \texttt{app}. On November 15,
|
||||
Google and Cloudflare both returned \texttt{147.182.178.136} for each name,
|
||||
with no AAAA answer. Codex validated the prepared Caddy additions, saved the
|
||||
@@ -508,14 +687,41 @@ were verified as healthy v2. Certificate and DNS
|
||||
details are recorded in \path{delivery/evidence/https-20261115.md}. Existing
|
||||
Gitea/Jenkins/Grafana checks still passed. The public application port is HTTPS
|
||||
443, with internal port 8000 remaining private. Distinct DNS hostnames satisfy
|
||||
the routing boundary; rollback and staging recovery remain outstanding.
|
||||
the routing boundary. Both recovery cases are now complete as recorded above.
|
||||
|
||||
PR~\#24 now includes the runner migration and HTTPS changes and is merged.
|
||||
The health correction, v2, both promotions and their human approvals are
|
||||
complete. Issue creation if still absent, review/merge of the successful records
|
||||
and preserved staging-only fault, both recovery demonstrations and their
|
||||
measured monitoring correlation, and final submission review remain outstanding.
|
||||
The diagnostic trials are not substitutes for the two remaining executions.
|
||||
The health correction, v2, both promotions, actual approvals and both measured
|
||||
recovery cases are complete. \href{https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/issues/28}{Tracking issue 28}
|
||||
was created at 04:33:40 UTC with Vincent's explicit authorization during
|
||||
finalization. The manual asks for an issue at baseline; this late correction
|
||||
does not claim that the issue preceded implementation. Final evidence
|
||||
review/merge and PDF submission remain group actions.
|
||||
|
||||
The following links select reviewed source at \texttt{72bf10d}, unless a
|
||||
historical release is identified. They do not require running a new pipeline.
|
||||
\small
|
||||
\begin{tabularx}{\linewidth}{L{3.3cm}Y}
|
||||
\toprule Artifact & Clickable source or evidence\\\midrule
|
||||
Application and tests & \href{https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/src/commit/34f26e6948b7001ede8ca19f23b67a02082e6a9a/delivery/app}{v1 source/tests}; \href{https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/src/commit/6bddbfba5a36e0e397537678ffb197e101fb0670/delivery/app}{v2 source/tests}\\
|
||||
Locked image build & \href{https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/src/commit/72bf10dcecc8db65dce4750c05bf841bea9b0834/delivery/app/Dockerfile}{Dockerfile}; \href{https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/src/commit/72bf10dcecc8db65dce4750c05bf841bea9b0834/delivery/app/requirements.txt}{exact dependencies}; \href{https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/src/commit/72bf10dcecc8db65dce4750c05bf841bea9b0834/delivery/agent/Dockerfile}{trusted agent image}\\
|
||||
Pipeline and policy & \href{https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/src/commit/72bf10dcecc8db65dce4750c05bf841bea9b0834/delivery/Jenkinsfile}{delivery Jenkinsfile}; \href{https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/src/commit/72bf10dcecc8db65dce4750c05bf841bea9b0834/delivery/SECURITY.md}{scan policy}; \href{https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/src/commit/72bf10dcecc8db65dce4750c05bf841bea9b0834/delivery/ci}{gates and control tests}\\
|
||||
Ansible & \href{https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/src/commit/72bf10dcecc8db65dce4750c05bf841bea9b0834/delivery/ansible/inventory.ini}{inventory without secrets}; \href{https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/src/commit/72bf10dcecc8db65dce4750c05bf841bea9b0834/delivery/ansible/deploy.yml}{playbook}; \href{https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/src/commit/72bf10dcecc8db65dce4750c05bf841bea9b0834/delivery/ansible/templates/compose.yaml.j2}{good Compose template}\\
|
||||
Exact release records & \href{https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/src/commit/72bf10dcecc8db65dce4750c05bf841bea9b0834/delivery/releases/v1-staging.json}{v1 staging}; \href{https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/src/commit/72bf10dcecc8db65dce4750c05bf841bea9b0834/delivery/releases/v1-production.json}{v1 production}; \href{https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/src/commit/72bf10dcecc8db65dce4750c05bf841bea9b0834/delivery/releases/v2-staging.json}{v2 staging}; \href{https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/src/commit/72bf10dcecc8db65dce4750c05bf841bea9b0834/delivery/releases/v2-production.json}{v2 production}\\
|
||||
Original release reports & \href{https://ci.yebilly.me/job/secure-delivery/job/pricing/5/artifact/}{build 5 tests/scans/approval}; \href{https://ci.yebilly.me/job/secure-delivery/job/pricing/6/artifact/}{build 6 tests/scans/approval}\\
|
||||
Recovery reports & \href{https://ci.yebilly.me/job/secure-delivery/job/pricing/8/artifact/}{rollback 8}; \href{https://ci.yebilly.me/job/secure-delivery/job/pricing/9/artifact/}{blocked staging 9}; \href{https://ci.yebilly.me/job/secure-delivery/job/pricing/10/artifact/}{recovery/rerun 10}; \href{https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/src/branch/main/delivery/evidence}{versioned summaries and CSVs}\\
|
||||
\bottomrule
|
||||
\end{tabularx}
|
||||
\normalsize
|
||||
|
||||
For grader access, Jenkins and Grafana retain the existing Stevens-campus/team
|
||||
network allowlist. Off campus, contact Vincent or Billy for approved-network
|
||||
access; the split-tunnel Stevens VPN is not a substitute
|
||||
(Section~\ref{Section:JenkinsAccess}). A login page is not job access: use an
|
||||
authorized account, or request a team-assisted review/read-only access.
|
||||
No separate grader account or new permission is claimed. Never put account
|
||||
secrets in the submission. Public application URLs allow independent health,
|
||||
identity and price checks; the PDF includes the actual results and limitations,
|
||||
and Gitea retains non-secret evidence so a new pipeline run is unnecessary.
|
||||
|
||||
After grading, only when instructed, retain required evidence and remove only
|
||||
the two pricing projects, their routes, monitoring additions and test DNS.
|
||||
|
||||
Binary file not shown.
|
After Width: | Height: | Size: 129 KiB |
Binary file not shown.
|
After Width: | Height: | Size: 70 KiB |
Binary file not shown.
|
After Width: | Height: | Size: 112 KiB |
Binary file not shown.
|
After Width: | Height: | Size: 112 KiB |
Binary file not shown.
|
After Width: | Height: | Size: 86 KiB |
Reference in New Issue
Block a user