Finalize Assignment 8 recovery evidence and manual
This commit is contained in:
+23
-8
@@ -6,14 +6,29 @@ existing Gitea/Jenkins/Caddy/monitoring foundation.
|
||||
- [x] Prepare exact dependencies, base digest, trusted agent and Ansible.
|
||||
- [x] Verify deploy SSH, host-key pinning, sudo and target prerequisites.
|
||||
- [x] Prepare gates, pipeline, approval and recovery automation.
|
||||
- [ ] Review/merge v1 source; configure staging/app DNS and TLS routes.
|
||||
- [ ] Show blocked unit-test and synthetic-secret Jenkins runs, then repair.
|
||||
- [ ] Publish v1; deploy staging; prove changed=0; approve production.
|
||||
- [ ] Preserve v1 records; review/merge v2; promote the same v2 digest.
|
||||
- [ ] Roll production back to matching v1 image/config; measure interruption.
|
||||
- [ ] Review staging-only bad command; show failed wait and recovery.
|
||||
- [ ] Add production monitoring and correlate actual samples/timestamps.
|
||||
- [ ] Finalize traceability, runbooks, history, AI log and one PDF.
|
||||
- [x] Review/merge v1 source; configure staging/app DNS and TLS routes.
|
||||
- [x] Show blocked unit-test and synthetic-secret Jenkins runs, then repair.
|
||||
- [x] Publish v1; deploy staging; prove changed=0; approve production.
|
||||
- [x] Preserve v1 records; review/merge v2; promote the same v2 digest.
|
||||
- [x] Roll production back to matching v1 image/config; measure interruption.
|
||||
- [x] Review staging-only bad command; show failed wait and recovery.
|
||||
- [x] Add production monitoring and correlate actual samples/timestamps.
|
||||
- [ ] Review/merge final traceability, runbooks, history, AI log and PDF; submit.
|
||||
|
||||
Actual execution, 15 November Eastern / 16 November UTC:
|
||||
|
||||
- Reviewed implementation and corrections: PRs [24](https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/pulls/24), [25](https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/pulls/25), [26](https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/pulls/26), and [27](https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/pulls/27).
|
||||
- [Build 5](https://ci.yebilly.me/job/secure-delivery/job/pricing/5/) and [build 6](https://ci.yebilly.me/job/secure-delivery/job/pricing/6/): v1/v2 promotions, exact digests, passing gates, changed=0, and real Vincent approvals.
|
||||
- [Build 8](https://ci.yebilly.me/job/secure-delivery/job/pricing/8/): healthy production rollback passed with original v1 image/configuration, source 34f26e6 and total 30. Vincent approved at 04:23:36 UTC. Nine failed HTTPS samples were observed; zero downtime is not claimed.
|
||||
- [Build 9](https://ci.yebilly.me/job/secure-delivery/job/pricing/9/): the reviewed staging-only port mismatch failed Compose wait and blocked production.
|
||||
- [Build 10](https://ci.yebilly.me/job/secure-delivery/job/pricing/10/): restored the original v2 staging configuration/digest, source 6bddbfb, total 36, then changed=0 on rerun.
|
||||
- Final verified state at 04:32 UTC: production v1, staging v2; both healthy. Six monitoring targets were up. Prometheus's 30-second samples missed the brief rollback interruption that the one-second observer captured. Staging had 169 failed samples during the deliberate fault/recovery.
|
||||
|
||||
This tracking issue was created during finalization, after the implementation
|
||||
PRs and operational exercises; it is not a claimed pre-implementation issue.
|
||||
The final evidence PR should close it after peer review. A first rollback
|
||||
attempt (build 7) stopped before deployment with a runner process-limit error;
|
||||
the idle runner was restarted without changing its limits before build 8.
|
||||
|
||||
Local preparation is not assessed release evidence. Preserve branch protection
|
||||
and earlier services/data; keep credentials out of Git and reports.
|
||||
|
||||
Reference in New Issue
Block a user