Files
vpn-dns-gateway/delivery/ISSUE.md
T
vsun1 fbda9516fe
vpn-dns-gateway/pipeline/head This commit looks good
vpn-dns-gateway/pipeline/pr-main This commit looks good
Finalize Assignment 8 recovery evidence and manual
2026-11-16 00:03:46 -05:00

3.0 KiB

Implement Assignment 8 secure delivery and rollback

Use instructor manual 1.43 Chapter 6 and its Startup Pricing Service on the existing Gitea/Jenkins/Caddy/monitoring foundation.

  • Prepare exact dependencies, base digest, trusted agent and Ansible.
  • Verify deploy SSH, host-key pinning, sudo and target prerequisites.
  • Prepare gates, pipeline, approval and recovery automation.
  • Review/merge v1 source; configure staging/app DNS and TLS routes.
  • Show blocked unit-test and synthetic-secret Jenkins runs, then repair.
  • Publish v1; deploy staging; prove changed=0; approve production.
  • Preserve v1 records; review/merge v2; promote the same v2 digest.
  • Roll production back to matching v1 image/config; measure interruption.
  • Review staging-only bad command; show failed wait and recovery.
  • Add production monitoring and correlate actual samples/timestamps.
  • Review/merge final traceability, runbooks, history, AI log and PDF; submit.

Actual execution, 15 November Eastern / 16 November UTC:

  • Reviewed implementation and corrections: PRs 24, 25, 26, and 27.
  • Build 5 and build 6: v1/v2 promotions, exact digests, passing gates, changed=0, and real Vincent approvals.
  • Build 8: healthy production rollback passed with original v1 image/configuration, source 34f26e6 and total 30. Vincent approved at 04:23:36 UTC. Nine failed HTTPS samples were observed; zero downtime is not claimed.
  • Build 9: the reviewed staging-only port mismatch failed Compose wait and blocked production.
  • Build 10: restored the original v2 staging configuration/digest, source 6bddbfb, total 36, then changed=0 on rerun.
  • Final verified state at 04:32 UTC: production v1, staging v2; both healthy. Six monitoring targets were up. Prometheus's 30-second samples missed the brief rollback interruption that the one-second observer captured. Staging had 169 failed samples during the deliberate fault/recovery.

This tracking issue was created during finalization, after the implementation PRs and operational exercises; it is not a claimed pre-implementation issue. The final evidence PR should close it after peer review. A first rollback attempt (build 7) stopped before deployment with a runner process-limit error; the idle runner was restarted without changing its limits before build 8.

Local preparation is not assessed release evidence. Preserve branch protection and earlier services/data; keep credentials out of Git and reports.