Files
vpn-dns-gateway/demo/tikzrefinery/documents/assets/weekly-report-9
vsun1 27b82c169e
vpn-dns-gateway/pipeline/head This commit looks good
vpn-dns-gateway/pipeline/pr-main This commit looks good
Add frozen TikZRefinery demo baseline and build pipeline
2026-11-25 22:46:33 -05:00
..

Week 9 report review: version 1.9.0

The Week 9 assignment was inspected read-only in Vincent's connected Chrome session on October 30, 2026: https://sit.instructure.com/courses/188761/assignments/696107

It is due October 30 at 11:59 p.m. and requires at most one page, completed and next-week work, applicable actions/risks, and links to updated locations in both the weekly entry and Document History. Unlike Week 8, this assignment does not specify a built-package screenshot. Its scope remains an outstanding instructor clarification from Week 8.

The weekly records the completed ownership/interaction/provider-boundary review and Milestone 2 specification work. Vincent confirmed submitting 1.8.1.1. Transaction/history implementation was deferred; new product checks and participant validation are not claimed. Counts were checked against authored TeX: 72 requirements, 59 planned test cases, 10 stories, 72 VER plans, 10 VAL plans.

Both editions completed the existing shared TinyTeX sequence: initial pdflatex, bibtex, makeindex and three final pdflatex passes. Final logs are clean. qa-summary.json records final hashes, page counts, weekly page boundaries and resolved PDF navigation targets. Week 9 is exactly printed page 111 in each; Week 8 remains one page. PDFs were used for visual/navigation checks only; no PDF text extraction was used. Affected pages were rendered, contact sheets reviewed and the new weekly, abstract, roadmap and prompt record inspected at reading size. An abstract overflow was corrected before delivery.

The working submission PDF has 161 pages and the developer's edition 217 pages. The submitted Milestone 2 checkpoint was retained unchanged under ../../submissions/milestone-2-1.8.1.1/. The current sources and current PDFs remain in their usual repository locations. No Canvas upload/submission, application implementation, commit or push was performed by this task.

Reproducible compiler outputs, draft previews and review images were removed from work/week-9-report/ after verification. Final reports, this QA record, the submitted checkpoint, sources, prototype package/demos and other tasks' work were retained. The JSON records cleanup measurements and preservation checks.