Files
vpn-dns-gateway/demo/tikzrefinery/documents/assets/weekly-report-8/README.md
T
vsun1 27b82c169e
vpn-dns-gateway/pipeline/head This commit looks good
vpn-dns-gateway/pipeline/pr-main This commit looks good
Add frozen TikZRefinery demo baseline and build pipeline
2026-11-25 22:46:33 -05:00

1.3 KiB

Week 8 package directory evidence

Assignment inspected in Vincent's Chrome tab on October 23, 2026: https://sit.instructure.com/courses/188761/assignments/696106

Weekly Report 8 is due October 23 at 11:59 p.m. and requires at most one page, completed work, next-week plans, action items, issues/risks, current Document History, and a screenshot of the built-package directory with version numbers. Vincent approved using prototype application version 0.1.0 and will clarify the instructor's intended package scope at the next class.

package-directory-2026-10-23.jpg is the original bounded Windows File Explorer capture of code/packages/, containing TikZRefinery-0.1.0-windows-x64/. The report clips the image to the breadcrumb and directory row for legibility; the underlying capture is unaltered. No screenshot content was synthesized. The binary package is retained locally but ignored by Git. Application version 0.1.0, Qt version 6.12.0 and report version 1.8.0 describe different artifacts. See code/tests/evidence/package-2026-10-23.md for the bounded package checks.

week-8-report-preview.png is the reviewed rendering of the one-page Week 8 entry retained for Vincent's review. The authored TeX and complete report PDFs remain authoritative; the preview is generated evidence, not editable source.