\chapter{Weekly Reports}\ChapterLabel{WeeklyReports}
|
|
|
|
\section{Week Report 12 (November 20, 2026)}\label{WeeklyReport:12}
|
|
\begingroup
|
|
\footnotesize
|
|
\noindent\textbf{Work Completed During the Past Week}\par\smallskip
|
|
I prepared the Windows Alpha \hyperref[Figure:AlphaDeployment]{deployment view}
|
|
and reviewed plugin records, operations, capabilities, provider choice and
|
|
lifecycle policy in separate UML views
|
|
(\hyperref[Section:PluginContract]{plugin contract}). Requirements/use cases
|
|
now cover provider choice, updates and creation with reciprocal planned checks.
|
|
The report contains 104 product requirements and 81 test definitions; those
|
|
counts do not mean all tests have executed.
|
|
|
|
I then extracted rectangle presentation, selection, movement and resizing into
|
|
a separately loaded native module through a Qt Core API
|
|
(\hyperref[Section:CurrentPlugin]{implemented extraction}). The host retains
|
|
syntax/source rewriting and guarded document acceptance. All six Debug and
|
|
all six Release CTest suites passed, including actual DLL loading, missing and
|
|
incompatible modules, geometry parity and invalid-proposal rejection
|
|
(\hyperref[Section:RectanglePluginCheck]{evidence}). The separate
|
|
\texttt{0.1.2-alpha} package started with a Windows-only PATH; the original
|
|
0.10.3 package remains frozen. Feature-based numbering reserves
|
|
\texttt{0.2.0-alpha} for later shape discovery and creation.
|
|
|
|
For this assignment I added draft
|
|
\hyperref[Persona:PERS-001]{PERS-001, a TikZ-literate report author}, rather than
|
|
claiming an interview result. Its
|
|
\hyperref[Table:PersonaInterfaceMapping]{interface mapping} and actual
|
|
\hyperref[Figure:CurrentUIWireframe]{application screenshot} connect layout,
|
|
source preservation and saving needs to the fitted canvas, corner handles,
|
|
read-only source pane and file controls. Current host/provider class, MVC and
|
|
\hyperref[Figure:CurrentPluginDeployment]{deployment} views distinguish this
|
|
implementation from future design. I also prepared the missing Week 11 entry
|
|
from dated resize evidence, explicitly marking its retrospective preparation.
|
|
|
|
\medskip\noindent\textbf{Work Planned for Next Week}\par\smallskip
|
|
Prepare the Alpha demonstration and preliminary-design submission; review
|
|
shape discovery, creation placement and source-insertion contexts before
|
|
implementing the next feature milestone. Review the package with intended users.
|
|
|
|
\medskip\noindent\textbf{Action Items}\par\smallskip
|
|
Rehearse Open--move/resize--Save--reopen; confirm persona/interface priorities;
|
|
retain the frozen demo and regression fixtures while reviewing the new package.
|
|
|
|
\medskip\noindent\textbf{Issues and Risks}\par\smallskip
|
|
The native API requires the matching toolchain and is not a sandbox. Syntax
|
|
variants and source preservation remain risks. Provider choice/update UI,
|
|
creation, undo/redo and integrated compilation remain pending. The passing
|
|
bounded suites do not establish general plugin or product acceptance.
|
|
\endgroup
|
|
|
|
\clearpage
|
|
\section{Week Report 11 (November 13, 2026)}\label{WeeklyReport:11}
|
|
|
|
\begingroup
|
|
\footnotesize
|
|
\noindent\emph{Prepared retrospectively on November 20 from dated project
|
|
records. Completed work below covers November 7--13, not the later plugin review.}
|
|
|
|
\medskip\noindent\textbf{Work Completed During the Past Week}\par\smallskip
|
|
Following Week 10's plan, I implemented rectangle corner resizing with corner
|
|
crossing, independent $0.01$ cm minimum dimensions and stroke-aware boundary
|
|
clamping. Move and resize stop at the furthest valid geometry rather than
|
|
rejecting the whole gesture. A changed release applies one guarded coordinate
|
|
batch; cancellation and unchanged releases preserve the source revision.
|
|
|
|
All five Debug and all five Release CTests passed on November 12. Checks covered
|
|
all corners, thin rectangles, crossing, bounds, cancellation, stale requests,
|
|
view transforms and save/reopen, preserving the stationary box and unrelated
|
|
source. The saved resize sample also compiled with TinyTeX. These are retained
|
|
results, not tests rerun for this report; see the
|
|
\hyperref[Section:RectangleResizeCheck]{resize evidence}.
|
|
|
|
I updated \RequirementRef{REQ-F-025}, \RequirementRef{REQ-I-013},
|
|
\UseCaseRef{UC-002} and their checks. The
|
|
\hyperref[Figure:ClassEditService]{edit-service class view},
|
|
\hyperref[Figure:DragSequence]{move/resize sequence} and
|
|
\hyperref[Figure:DragActivity]{activity} document responsibilities and interaction.
|
|
The resize work is checkpoint \texttt{5a776cb}. Plugin loading, undo/redo and
|
|
integrated compiler/PDF viewing remain unimplemented.
|
|
|
|
\medskip\noindent\textbf{Work Planned for Next Week}\par\smallskip
|
|
No contemporaneous Week 11 plan was retained. My follow-up plan, recorded now,
|
|
is to review the rectangle-plugin interface, presentation records and lifetime
|
|
wiring before extraction, and prepare the Alpha demonstration. The existing
|
|
working package will remain available while extraction uses a separate package.
|
|
|
|
\medskip\noindent\textbf{Action Items and Risks}\par\smallskip
|
|
Confirm the extraction interfaces, rehearse the supported resize/save workflow,
|
|
and retain regression fixtures. Arbitrary TikZ support and plugin compatibility
|
|
remain risks; keep the first extraction narrow and require source-preservation
|
|
and geometry-parity checks. Late report preparation is explicitly dated above.
|
|
|
|
\IfFileExists{../assets/weekly-report-11/autobuild.png}{%
|
|
\begin{center}
|
|
\includegraphics[width=0.94\linewidth,height=1.42in,keepaspectratio]{../assets/weekly-report-11/autobuild.png}\par
|
|
\scriptsize First November 20 report autobuild (offscreen log view), \texttt{0.1.1-alpha}; versioned PDF ZIP.
|
|
This is current documentation evidence, not a November 13 build or new executable.
|
|
\end{center}
|
|
}{}
|
|
\endgroup
|
|
|
|
\clearpage
|
|
\section{Week Report 10 (November 6, 2026)}\label{WeeklyReport:10}
|
|
|
|
\begingroup
|
|
\footnotesize
|
|
\noindent\textbf{Work Completed During the Past Week}\par\smallskip
|
|
I prioritized canvas feedback over Week 9's planned history implementation.
|
|
The prototype now fits the canvas to the pane, shows the fixed editing
|
|
area, and repaints the box without leaving trails in a clipped raster check.
|
|
Four automated tests passed. I refreshed Windows prototype 0.1.0 and checked
|
|
that it closed and reopened with a Windows-only PATH. The canvas and tests
|
|
are in local checkpoint \texttt{0aeef51}.
|
|
|
|
I linked the canvas requirements and the named numeric values rule
|
|
(\ChapterRef{Requirements}) to checks and clarified the out-of-bounds branch in
|
|
\UseCaseRef{UC-002}. The \hyperref[Figure:ClassDiagramView]{canvas view class diagram}
|
|
and \hyperref[Figure:DragSequence]{whole-element drag sequence} document the
|
|
implemented prototype. The automated report build produces a versioned ZIP.
|
|
See \hyperref[Table:DocumentHistory]{Document History} for this version.
|
|
|
|
\medskip\noindent\textbf{Work Planned for Next Week}\par\smallskip
|
|
I will review the packaged drag on Windows, settle the minimum usable box
|
|
size, and implement and test a corner resize as one guarded source edit.
|
|
The rectangle plugin follows a working resize baseline.
|
|
|
|
\medskip\noindent\textbf{Issues and Risks}\par\smallskip
|
|
Native drag acceptance remains pending. I will use the two-box fixture for
|
|
that review and check that resizing preserves unrelated source. History and
|
|
provider registration remain deferred.
|
|
|
|
\IfFileExists{../assets/weekly-report-10/autobuild.png}{%
|
|
\begin{center}
|
|
\includegraphics[width=0.94\linewidth,height=1.58in,keepaspectratio]{../assets/weekly-report-10/autobuild.png}\par
|
|
\scriptsize First automated 1.10.0 package run. The final ZIP was rebuilt with this capture included.
|
|
\end{center}
|
|
}{}
|
|
\endgroup
|
|
|
|
\clearpage
|
|
\section{Week Report 9 (October 30, 2026)}\label{WeeklyReport:9}
|
|
|
|
\begingroup
|
|
\footnotesize
|
|
|
|
\noindent\textbf{Work Completed During the Past Week}\par\smallskip
|
|
I completed Week 8's review of transaction records and ownership: the document
|
|
will control atomic source/history updates, the edit service prepares proposals,
|
|
the file store handles I/O and the controller coordinates. Reviewed rejection
|
|
feedback, attached labels, overlap selection and provider boundaries are now in
|
|
requirements (\ChapterRef{Requirements}), use cases
|
|
(\ChapterRef{UseCases}), planned class views (\ChapterRef{SoftwareArchitecture})
|
|
and activity/sequence diagrams (\AppendixRef{DesignDocuments}). Unfinished
|
|
registration, ambiguity and lifetime choices remain in the temporary
|
|
\ChapterRef{OpenDesignDecisions}.
|
|
|
|
I prepared and submitted Milestone 2 version 1.8.1.1. I updated the project
|
|
constraints (\ChapterRef{TeamDeclaration}), tradeoffs and design iterations
|
|
(\ChapterRef{DevelopmentPlan}), stories (\ChapterRef{UserStories}), standards
|
|
applicability (\ChapterRef{CodesStandards}), test plan (\ChapterRef{Tests})
|
|
and reciprocal mappings (\ChapterRef{Traceability}). The 72 requirements and
|
|
59 planned test cases map to verification (\ChapterRef{Verification}); ten
|
|
stories map to validation (\ChapterRef{Validation}). The final audit added zoom
|
|
clarity and compiled-output agreement to VAL-002. Both editions built and passed
|
|
visual review.
|
|
|
|
Transaction/history implementation was deferred for review and documentation.
|
|
No new feature, product test run or participant validation is claimed.
|
|
This weekly starts report 1.9.0;
|
|
the \hyperref[FrontMatter:Abstract]{abstract}, linked
|
|
\hyperref[Table:DocumentHistory]{Document History} and report roadmap
|
|
(\AppendixRef{ReportRoadmap}) are updated.
|
|
\ifSubmissionBuild\else
|
|
Internal authoring guidance and assistance records are updated in
|
|
\AppendixRef{AIAgentGuide} and \AppendixRef{AIPromptLog}.
|
|
\fi
|
|
|
|
\medskip\noindent\textbf{Work Planned for Next Week}\par\smallskip
|
|
I will review provider registration, competing interpretations, compatibility
|
|
and lifetime, then begin the narrow transaction/history prototype and
|
|
exact-source undo/redo checks after resolving its required interfaces.
|
|
|
|
\medskip\noindent\textbf{Action Items}\par\smallskip
|
|
\begin{enumerate}[leftmargin=*,nosep]
|
|
\item Review one label expressed in two source forms to test provider boundaries.
|
|
\item Settle required record/interface details and implement the agreed history path.
|
|
\item Obtain Milestone 2 feedback and clarify the package-screenshot scope.
|
|
\end{enumerate}
|
|
|
|
\medskip\noindent\textbf{Issues and Risks}\par\smallskip
|
|
Syntax variants, provider lifetimes and history memory remain risks. I will
|
|
retain the bounded parser and atomic acceptance boundary, review ambiguity
|
|
explicitly and measure storage before choosing limits. Labels, menus, plugins
|
|
and undo/redo remain planned. Instructor feedback and product acceptance are pending.
|
|
|
|
\endgroup
|
|
|
|
\clearpage
|
|
\section{Week Report 8 (October 23, 2026)}\label{WeeklyReport:8}
|
|
|
|
\begingroup
|
|
\footnotesize
|
|
|
|
\noindent\textbf{Work Completed During the Past Week}\par\smallskip
|
|
I completed Week 7's Qt/C++ setup, build and initial parsing objectives.
|
|
The running prototype displays explicit-coordinate rectangles, lines and arrows,
|
|
supports whole-element dragging/cancellation, preserves unrelated source and
|
|
saves/reopens edits. Four automated checks pass; eight reference drawings and
|
|
three saved outputs matched compiled TikZ within the prototype's one-pixel allowance.
|
|
|
|
I clarified transaction/history and plugin behavior in linked requirements,
|
|
use cases and planned tests, aligned UC-004's TikZ diagram, and separated
|
|
proposed collaborators from current classes. Detailed ownership review remains
|
|
pending; undo/redo and plugins are unimplemented.
|
|
|
|
I packaged prototype 0.1.0 with Qt 6.12.0 and checked startup without the
|
|
development Qt PATH. Its directory appears below. Report 1.8.0 uses separate
|
|
weekly numbering; Document History is updated.
|
|
|
|
\medskip\noindent\textbf{Work Planned for Next Week}\par\smallskip
|
|
I will review records, validation and ownership, update class diagrams, then
|
|
begin the common transaction/history implementation and exact-source undo/redo checks.
|
|
|
|
\medskip\noindent\textbf{Action Items}\par\smallskip
|
|
\begin{enumerate}[leftmargin=*,nosep]
|
|
\item Resolve transaction collaborator responsibilities and ownership.
|
|
\item Implement and test agreed history behavior after review.
|
|
\item Confirm the instructor's intended built-package screenshot scope.
|
|
\end{enumerate}
|
|
|
|
\medskip\noindent\textbf{Issues and Risks}\par\smallskip
|
|
Broader syntax, element insertion, endpoint editing and integrated PDF preview
|
|
remain pending. I will retain the narrow subset and regression checks while
|
|
reviewing plugin lifetimes and history storage. Native acceptance and performance
|
|
targets remain unverified; a package startup check does not establish acceptance.
|
|
|
|
\begin{center}
|
|
\includegraphics[width=0.97\linewidth,trim=105bp 289.8bp 0bp 24bp,clip]{../assets/weekly-report-8/package-directory-2026-10-23.jpg}\par
|
|
\scriptsize Prototype package 0.1.0, Windows x64; Qt 6.12.0; October 23, 2026.
|
|
\end{center}
|
|
|
|
\endgroup
|
|
|
|
\clearpage
|
|
\section{Week Report 7 (October 16, 2026)}
|
|
|
|
\begingroup
|
|
\footnotesize
|
|
|
|
\subsection*{Work Completed During the Past Week}
|
|
I added Developer Requirements for source organization, naming, inheritance,
|
|
and ownership, with proposed checks and traceability. I applied the agreed
|
|
\texttt{tkr} prefix to the six classes, matching files, build references, and
|
|
design diagrams. I clarified the maximum of three project-defined inheritance
|
|
levels: base, child, and grandchild. The current design needs no additional
|
|
subclasses.
|
|
|
|
I clarified my professor's diagram-authoring workflow and submitted the IDE
|
|
stakeholder-validation response. He estimated 30--60 minutes for Visio diagram
|
|
creation and about five minutes for editing existing diagram TeX files. These
|
|
describe different tasks, not measured savings. He described increasing manual
|
|
TikZ creation effort with complexity and requested adding elements to
|
|
AI-generated diagrams, a need for later scope review.
|
|
|
|
Week 6's planned diagram review, Qt/C++ setup, scaffold build, and foundation
|
|
tests remain pending. The parsing and box-drag prototype has not begun.
|
|
|
|
\subsection*{Work Planned for Next Week}
|
|
Next week, I will review the MVC, class, and activity diagrams for responsibilities
|
|
and ownership, configure the Qt/C++ toolchain, build the scaffold, and run its
|
|
foundation tests. If successful, I will begin explicit-coordinate parsing for
|
|
the separated-box contact workflow. I will assess the new creation need against
|
|
the initial editing scope.
|
|
|
|
\subsection*{Action Items}
|
|
\begin{enumerate}[leftmargin=*,nosep]
|
|
\item Finish diagram review and record corrections.
|
|
\item Verify the Qt/C++ build and foundation tests before extending code.
|
|
\item Start explicit-coordinate parsing and the box-contact prototype.
|
|
\end{enumerate}
|
|
|
|
\subsection*{Issues and Risks}
|
|
Limited availability and companion coursework delayed review and implementation.
|
|
I will resume with review and build checks while retaining the narrow initial
|
|
subset. Parsing, dragging, source preservation, response time, and canvas/PDF
|
|
agreement remain unverified. Stakeholder estimates require further investigation
|
|
before establishing performance targets or broader scope.
|
|
|
|
\endgroup
|
|
|
|
\clearpage
|
|
\section{Week Report 6 (October 9, 2026)}
|
|
|
|
\begingroup
|
|
\footnotesize
|
|
|
|
\subsection*{Work Completed During the Past Week}
|
|
I advanced Week 5's class-design plan by defining responsibilities, interfaces,
|
|
ownership, naming conventions, and a shallow inheritance structure. I prepared
|
|
the initial six-class C++/Qt scaffold, build configuration, coding guide, and
|
|
foundation tests, and aligned the Development Plan with these decisions.
|
|
The application has not yet been compiled or run.
|
|
|
|
I added TikZ class and activity diagrams, then expanded the design documentation
|
|
with a model--view--controller allocation, a responsibility and interaction
|
|
overview, and linked details for each class. Following reported Milestone 1
|
|
feedback, I also linked the use-case tables to the overview and individual
|
|
use-case diagrams. These diagrams are prepared, but my review is still in
|
|
progress.
|
|
|
|
I drafted the companion IDE course's initial project understanding with
|
|
supporting research. I also checked the new weekly-assignment documentation
|
|
instructions: requirements and user-story tables already exist, and the
|
|
glossary now uses a linked table of terms and definitions.
|
|
|
|
\subsection*{Work Planned for Next Week}
|
|
Next week, I will finish reviewing the design diagrams and resolve any
|
|
responsibility, interface, or ownership discrepancies. I will install and
|
|
verify the Qt/C++ toolchain, build the scaffold, and run the prepared foundation
|
|
tests. If the build succeeds, I will begin explicit-coordinate parsing and the
|
|
box-drag prototype planned in Week 5, which remains pending.
|
|
|
|
\subsection*{Action Items}
|
|
\begin{enumerate}[leftmargin=*,nosep]
|
|
\item Finish diagram review and record needed corrections.
|
|
\item Configure the Qt/C++ kit and run the scaffold and foundation tests.
|
|
\item Begin parsing and the separated-box contact workflow.
|
|
\end{enumerate}
|
|
|
|
\subsection*{Issues and Risks}
|
|
Limited availability delayed diagram review and prototype work. I will resume
|
|
with review and build verification before expanding implementation. Parsing,
|
|
dragging, source preservation, response time, and canvas/PDF agreement remain
|
|
unverified; planned tests and reference diagrams are not passing application
|
|
test evidence.
|
|
|
|
\endgroup
|
|
|
|
\clearpage
|
|
\section{Week Report 5 (October 2, 2026)}
|
|
|
|
\begingroup
|
|
\footnotesize
|
|
|
|
\subsection*{Work Completed During the Past Week}
|
|
I reviewed the Development Plan and provisional requirements with my
|
|
professor's feedback, clarifying dragging, basic shapes, offline operation,
|
|
saving, and immediate visual feedback. I examined the previous group's report
|
|
and repository for lessons about compilation, preview, plugins, and agreement
|
|
between the editor and compiled output.
|
|
|
|
I defined an explicit-coordinate subset for lines, arrows, and rectangles,
|
|
compiled reference examples and expected edits, and expanded proposed
|
|
coordinate-conversion and output-comparison tests. The examples include moving
|
|
separated boxes into contact. I also explored a TikZ loop with a compiled DVI
|
|
example. These are reference demonstrations; application tests remain unexecuted.
|
|
|
|
I selected C++ with Qt and discussed six initial classes, folders, shallow
|
|
inheritance, and ownership. I agreed on descriptive names, variable type
|
|
prefixes, and \texttt{m\_} private-member markers. This advances Week 4's subset,
|
|
stakeholder, and architecture work. The planned PySide6 test was not built;
|
|
Qt/C++ feasibility work will replace it.
|
|
|
|
\subsection*{Work Planned for Next Week}
|
|
Next week, I will review class boundaries, interfaces, and ownership, document
|
|
the language and naming decisions, and generate initial class files and build
|
|
configuration. I will begin a prototype to evaluate dragging, coordinate
|
|
conversion, minimal source updates, and compiled-output agreement.
|
|
|
|
\subsection*{Action Items}
|
|
\begin{enumerate}[leftmargin=*,nosep]
|
|
\item Finalize class responsibilities and ownership.
|
|
\item Verify the Qt/C++ build environment and document naming rules.
|
|
\item Start the box-contact prototype and retain comparison evidence.
|
|
\end{enumerate}
|
|
|
|
\subsection*{Issues and Risks}
|
|
Interaction speed, source preservation, and rendering agreement remain
|
|
unverified. I will evaluate immediate canvas feedback separately from
|
|
compilation, check coordinate conversions independently, and compare saved
|
|
output with reference geometry. Broader syntax remains deferred.
|
|
|
|
\noindent\textbf{Reminder for Next Session:} Resume review of the six proposed
|
|
class boundaries, ownership, and interfaces before generating files.
|
|
|
|
\endgroup
|
|
|
|
\clearpage
|
|
\section{Week Report 4 (September 25, 2026)}
|
|
|
|
\begingroup
|
|
\footnotesize
|
|
|
|
\subsection*{Work Completed During the Past Week}
|
|
I prepared and presented Demo 1, then continued the Development Plan for
|
|
Milestone 1. I drafted provisional user stories, product requirements, use
|
|
cases, test cases, and a traceability matrix. I revised the use-case and
|
|
requirement tables to follow the course template and added a use-case diagram.
|
|
The plan now includes a phase-level work breakdown and a provisional TikZ
|
|
Gantt chart based on my tentative milestone dates. I also prepared separate
|
|
submission and developer editions of the report after learning that the AI
|
|
prompt log may be omitted from the submitted PDF.
|
|
|
|
This completed the initial requirements and use-case drafting planned in Week
|
|
3. The precise supported TikZ subset, component and data-flow sketch, and
|
|
PySide6 feasibility test remain to be done. The proposed requirements and
|
|
tests are drafts, not approved scope or executed test results.
|
|
|
|
\subsection*{Work Planned for Next Week}
|
|
Next week, I will review the Milestone 1 Development Plan for gaps, including
|
|
resources and skills, and seek feedback on the provisional stories and
|
|
requirements. I will define a first supported TikZ object and the source
|
|
preservation boundary, then sketch the major application components and begin
|
|
a focused PySide6 feasibility test for graphical interaction and external
|
|
LaTeX compilation. I will assess the previous group's materials if access
|
|
becomes available.
|
|
|
|
\subsection*{Action Items}
|
|
\begin{enumerate}[leftmargin=*,nosep]
|
|
\item Review the Milestone 1 plan and request stakeholder feedback.
|
|
\item Specify the first editable TikZ subset and source-preservation rules.
|
|
\item Sketch the architecture and run the first PySide6 feasibility check.
|
|
\end{enumerate}
|
|
|
|
\subsection*{Issues and Risks}
|
|
The supported syntax and stakeholder expectations are not yet confirmed, and
|
|
the framework has not been tested in a prototype. I will keep the first
|
|
workflow narrow, seek feedback using representative diagrams, and use the
|
|
feasibility check before committing to the implementation approach. Access to
|
|
the previous project remains pending, so current planning does not depend on
|
|
it.
|
|
|
|
\endgroup
|
|
|
|
\clearpage
|
|
\section{Week Report 3 (September 18, 2026)}
|
|
|
|
\begingroup
|
|
\footnotesize
|
|
\enlargethispage{1in}
|
|
|
|
\subsection*{Work Completed During the Past Week}
|
|
This week, I advanced the project definition and scope planned in Week 2 even
|
|
though the previous group's materials were not yet available. I completed the
|
|
Milestone 0 Team Declaration, which established the TikZRefinery team identity,
|
|
project proposal, mission statement, key drivers, and key constraints. This
|
|
work clarified the business intent: reduce the effort required to refine rough
|
|
or AI-generated TikZ diagrams while preserving readable, editable source.
|
|
|
|
I also refined the initial prototype boundary. The project remains a local
|
|
desktop application centered on source editing, external LaTeX compilation and
|
|
preview, basic graphical manipulation, and reliable \gls{roundtripediting} for
|
|
a deliberately limited \gls{tikzsubset}. I documented source synchronization,
|
|
the external toolchain, the senior-design schedule, and single-developer
|
|
capacity as constraints that must shape the requirements and architecture.
|
|
Qt 6 and PySide6 remain implementation candidates rather than approved choices.
|
|
|
|
Finally, I maintained the project report and repository records so that the
|
|
proposal, glossary, revision history, AI-use records, and future chapter plan
|
|
remain consistent.
|
|
|
|
\subsection*{Work Planned for Next Week}
|
|
Next week, I will turn the approved proposal into initial platform-independent
|
|
requirements and use cases, define the first supported TikZ object and editing
|
|
subset, and draft the application's component and data-flow boundaries. I will
|
|
also build a small PySide6 feasibility test for application startup, a graphics
|
|
scene, and external compilation without treating the result as a final
|
|
framework decision. If the previous group's materials arrive, I will review
|
|
them for reusable lessons, constraints, and failure modes.
|
|
|
|
\subsection*{Action Items}
|
|
\begin{enumerate}[leftmargin=*,nosep]
|
|
\item Draft and review initial requirements and representative use cases.
|
|
\item Define the minimum TikZ subset and source-preservation rules.
|
|
\item Sketch the component architecture and run the PySide6 feasibility test.
|
|
\item Review prior-project evidence when it becomes available.
|
|
\end{enumerate}
|
|
|
|
\subsection*{Issues and Risks}
|
|
Delayed access to the previous project may hide useful lessons, so current work
|
|
will remain independent and later findings will be evaluated rather than
|
|
adopted automatically. Scope remains the primary risk for a single developer;
|
|
the prototype will prioritize a verifiable end-to-end workflow over broad TikZ
|
|
support.
|
|
|
|
\endgroup
|
|
|
|
\clearpage
|
|
\section{Week Report 2 (September 11, 2026)}
|
|
|
|
\subsection*{Work Completed During the Past Week}
|
|
This week, I resolved the platform and ownership question from Week 1. I
|
|
separated from the original group so that Turan and Sergio could continue with
|
|
their web direction, while I began pursuing the graphical TikZ editor as an
|
|
independent desktop project. I selected the name TikZRefinery to reflect the
|
|
goal of turning rough or AI-generated TikZ diagrams into carefully adjusted,
|
|
editable results.
|
|
|
|
I investigated \gls{qt} 6 with \gls{pyside} as the leading desktop framework. Qt Widgets
|
|
could provide the application shell, while QGraphicsScene and QGraphicsView
|
|
could support selectable and movable diagram elements. I also identified that
|
|
Qt would launch and display results from a separate LaTeX toolchain rather than
|
|
compile LaTeX itself. This clarified a preliminary workflow from TikZ source,
|
|
through external compilation, to PDF preview and graphical adjustment.
|
|
|
|
I also learned that a previous senior-design group attempted this project using
|
|
an existing open-source application. I requested access to its repository so I
|
|
can review its approach and failures before committing to a final architecture.
|
|
The \gls{minimumprototype} remains centered on source editing, compilation and
|
|
preview, and manipulation of a deliberately limited subset of TikZ objects.
|
|
|
|
\subsection*{Work Planned for Next Week}
|
|
Next week, I will review the previous implementation if it becomes available,
|
|
write initial platform-independent \glspl{requirement}, define the supported
|
|
\gls{tikzsubset} for the minimum prototype, and draft the desktop application's major
|
|
components and data flow. I will also prepare a small PySide6 feasibility test
|
|
without treating the framework choice as final.
|
|
|
|
\subsection*{Action Items}
|
|
\begin{enumerate}[leftmargin=*,nosep]
|
|
\item Obtain and assess the previous group's repository and lessons learned.
|
|
\item Define the minimum supported editing and compilation workflow.
|
|
\item Draft initial requirements and a preliminary component architecture.
|
|
\end{enumerate}
|
|
|
|
\subsection*{Issues and Risks}
|
|
The previous repository may be delayed, so I will continue with requirements
|
|
that do not depend on it. Supporting arbitrary TikZ would create excessive
|
|
parsing and round-trip-editing risk for one developer; the first prototype will
|
|
therefore use a documented subset and preserve unsupported source where
|
|
possible. The project scope will be reviewed against the available schedule.
|
|
|
|
|
|
\clearpage
|
|
\section{Week Report 1 (September 4, 2026)}
|
|
|
|
\subsection*{Work Completed During the Past Week}
|
|
This week, I selected the professor-provided idea of a graphical TikZ editor and
|
|
began defining the problem. AI-generated diagrams may contain spacing,
|
|
alignment, or scale errors that require precise human correction, while editing
|
|
those details directly in LaTeX can be difficult. The proposed application
|
|
would provide graphical manipulation while retaining editable TikZ source.
|
|
|
|
I discussed the platform with Turan and Sergio. A web application aligned with
|
|
Turan's experience, while I was more interested in desktop development. I
|
|
identified graphical editing, source synchronization, LaTeX compilation,
|
|
preview, and EPS export as major needs. Reliable \gls{roundtripediting} between the
|
|
graphical view and TikZ source appears to be the central technical challenge.
|
|
|
|
\subsection*{Work Planned for Next Week}
|
|
Next week, I will clarify ownership of the web and desktop directions, define a
|
|
minimum viable product, configure and test the LaTeX report, compare desktop
|
|
user-interface frameworks, and begin outlining the application architecture.
|
|
|
|
\subsection*{Action Items}
|
|
\begin{enumerate}[leftmargin=*,nosep]
|
|
\item Resolve the platform direction and project ownership.
|
|
\item Define the minimum prototype and test the LaTeX and desktop tools.
|
|
\end{enumerate}
|
|
|
|
\subsection*{Issues and Risks}
|
|
Unresolved platform scope could divide effort; I will establish clear ownership
|
|
before implementation. Because arbitrary TikZ is difficult to rewrite safely,
|
|
early prototypes will target a limited subset.
|