Files
vsun1 27b82c169e
vpn-dns-gateway/pipeline/head This commit looks good
vpn-dns-gateway/pipeline/pr-main This commit looks good
Add frozen TikZRefinery demo baseline and build pipeline
2026-11-25 22:46:33 -05:00

2.3 KiB

Week 11 report - prepared November 20, 2026

Vincent explicitly selected the overdue Week 11 assignment (November 13) after Canvas showed it missing. No Week 12 report or persona/interface addition is included. The entry identifies retrospective preparation and does not invent a contemporaneous next-week plan. Completed-work claims cover November 7--13 and use the retained November 12 resize evidence and checkpoint 5a776cb.

The updated report baseline is 0.1.1-alpha. The full report build uses the existing TinyTeX/BibTeX/makeindex sequence in documents/build-report.ps1. The submission ZIP contains the corresponding versioned report PDF, verified byte for byte. The current report has a one-page Week 11 entry with linked requirements, use case, class, sequence, activity and resize-evidence locations.

first-build-result.txt is the actual first submission-only run on November 20. autobuild.png captures that text in an offscreen read-only Qt log view, following Week 10's evidence convention; it is not a desktop terminal capture or a November 13 build. A browser local-file preview was blocked by URL policy; it was not retried or bypassed. The offscreen artifact rendering uses no browser or network access. The final full build includes the image; its result is final-build-result.txt. qa.json records page count, navigation, archive and preservation checks. The PNG and actual first/final results remain evidence.

The existing application, source, CMake configuration and frozen Alpha 0.10.3 package remain unchanged. Existing uncommitted work, examples, slides and submissions are preserved. Prior canonical 0.1.0-alpha PDFs are retained at documents/submissions/baselines/architecture-0.1.0-alpha/.

No application tests were rerun. No email, Canvas submission, commit or push was made. Instructor acceptance and late-work decisions remain pending.

Both final editions passed build/diagnostic and visual checks (214 submission pages; 274 developer pages). Week 11 is one page, printed page 154, at submission PDF page 174 and developer PDF page 176. All 6,530 internal links resolve; stable-ID/reference checks pass. Cleanup removed 159 task-created files (18.57 MiB), including the build/render copies, temporary log-capture helper and unused preview HTML. Final deliverables, TeX, the screenshot, actual build logs, compact QA evidence and historical baselines remain.