Add the locked pricing service, trusted-agent pipeline, Ansible deployments, security gates, recovery runbooks, prerequisite evidence, and preparation manual. Prepared with Codex assistance. Vincent explicitly authorized this local commit and will handle the push. Assessed releases and recovery exercises remain pending.
21 lines
1.4 KiB
TeX
21 lines
1.4 KiB
TeX
This group document records the SSW 590 coursework and its supporting
|
|
commands, designs, and evidence. Assignment 8 prepares secure delivery with
|
|
a trusted Jenkins agent, locked Flask/Gunicorn service, security gates,
|
|
Ansible, scoped deployment credentials and recovery runbooks. The prerequisite
|
|
job passed; reviewed v1/v2 publication, DNS/TLS, promotion, rollback and staging
|
|
recovery remain pending. This draft is not ready for submission.
|
|
Assignment 7 introduced site reliability
|
|
engineering: Prometheus, Grafana OSS, Node Exporter, and Blackbox Exporter
|
|
run as four pinned containers beside Gitea and Jenkins on the originally 1\,GiB
|
|
DigitalOcean droplet, with Grafana at \url{https://metrics.yebilly.me/login}
|
|
for approved networks only. A dashboard shows host CPU, memory, and disk and
|
|
the HTTPS availability of Gitea and Jenkins. A 99\% availability objective is
|
|
defined and measured, and three alert rules (service availability, disk
|
|
space, and collection health) notify the team's Discord channel. Each was
|
|
shown firing and resolving; the availability rule through a planned Jenkins
|
|
outage that was detected in about two minutes and recovered about a minute
|
|
after restart. Earlier chapters retain the group's prior assignment
|
|
results, including the Jenkins merge gate and the Gitea Actions manual build.
|
|
On November 14 the team resized the droplet to 2\,GiB without enlarging its
|
|
disk, updated packages and verified the existing services.
|