# Completed production rollback and staging recovery Executed 15 November 2026 Eastern / 16 November UTC. All times below are UTC. Primary data: [results and report hashes](recovery-20261115.json), [actual runtime and Prometheus responses](recovery-runtime-20261115.json), [original production CSV](recovery-production-20261115.csv), and [original staging CSV](recovery-staging-20261115.csv). CSV bytes and SHA-256 values were verified against the remote originals. ## Review and baseline [PR 27](https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/pulls/27) was approved by `bill` at 04:12:09 and merged by `vsun1` at 04:14:30 as `72bf10dcecc8db65dce4750c05bf841bea9b0834`. It preserves the actual successful release records, bad configuration `1e23001e7303d14630cfa97c8de36f31f30b81a0` and immediate revert `29e580c4613f00a02f44bce0dbcee2fd8fdc83ae`. Main is good. [Actions workflow 16](https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/actions/runs/16) passed in 2m17s before recovery. Jobs 7–10 used reviewed main `72bf10d` for control code; their release records select historical app/configuration commits. ## Healthy production rollback This was a planned exercise on healthy v2, not an incident. Decision: 04:17:46.307. The reviewed HTTPS observer started before approval. The original v1 production record selects source/configuration `34f26e6948b7001ede8ca19f23b67a02082e6a9a` and image: ```text git.yebilly.me/ssw590-group1/pricing@sha256:59c880b2704f91668618d9a2ff0bc8fbab0af4239ceb916de261863890ef88d8 ``` [Build 7](https://ci.yebilly.me/job/secure-delivery/job/pricing/7/) stopped after 17.784 s with `Cannot fork` during test setup, before approval/deployment. The agent cgroup showed 115/128 tasks and two limit events; Docker stats showed 132.6/512 MiB, PIDS=114 and no OOM kill. Its process listing showed Java only; the accounting/accumulation mechanism was not established. Only the idle delivery-agent container was restarted, preserving identity, workspace, image, all limits and application services. Immediate Docker stats showed PIDS=13. No resource/security limit was raised. Build 8 is the successful retry. | Build 8 event | Actual result | |---|---| | [Jenkins run](https://ci.yebilly.me/job/secure-delivery/job/pricing/8/) | SUCCESS; 04:22:04.875–04:24:48.529; 163.654 s including approval wait | | Actual approval | `vsun1`, 04:23:36, archived | | Ansible rollback | 04:23:42.801–04:24:46.705; 63.904 s; ok=10 changed=3 unreachable=0 failed=0 | | First v1 health response completed | 04:24:25.313; request started 04:24:23.645 | | Restored behavior | HTTPS health/identity/price passed; v1, source 34f26e6, total 30 | [Actual production v1 SUCCESS screenshot](../../manual/latex/images/assignment8-rollback-8-20261115.jpg): build 8 completed November 16 at 04:24:48 UTC; deployment recap passed. Twelve control and three app tests, source-secret and nine-dependency gates passed. Build/publish was skipped: the original scanned digest and matching Ansible configuration were restored without rebuilding. Deployment-start to first observed v1 response completion was 42.512 s. Decision-to-recovery also includes the runner error, troubleshooting and actual human wait; it is not traffic interruption time. Production: **863 requests, 9 failures** (8 HTTP 502, one timeout), sampled 04:17:46.447–04:32:10.607. Adjacent successful response completions: 04:24:12.672 (v2), 04:24:25.313 (v1), **12.641 s apart**. First failed request: 04:24:13.629. This is sampled evidence, not an exact continuous outage duration or proof of zero interruption between requests. Maximum request-start gap: 2.015 s; two-second timeouts delayed the nominal one-second cadence. ## Separate staging failure and recovery [Build 9](https://ci.yebilly.me/job/secure-delivery/job/pricing/9/) selected the good v2 staging record and changed only its runtime configuration selection to the reviewed bad SHA. Its existing image remained: ```text git.yebilly.me/ssw590-group1/pricing@sha256:efe8658a0adf0854038d58199652030cbd0ef70047a1c6ebc7b09906cf1ec88b ``` Gunicorn bound to 8001; image health/Caddy used 8000. Compose reported `container pricing-staging-app-1 is unhealthy`. The command retained `--wait --wait-timeout 90`; Ansible blocked after 86.690 s including earlier tasks: ok=4 changed=1 unreachable=0 failed=1, exit 2. No unchanged rerun, production approval or production deployment ran. The 04:28:54.827 snapshot confirmed staging unhealthy/HTTP 502 at the same v2 digest while production remained healthy v1/total 30. The failed run did not reach the final metadata-copy task: host `release.json` still described the last good release while Compose was bad. That file alone cannot prove health. [Build 10](https://ci.yebilly.me/job/secure-delivery/job/pricing/10/) used the original good v2 staging record and restored playbook/template from `6bddbfba5a36e0e397537678ffb197e101fb0670` using `git archive`. No rebuild/push. | Staging event | UTC / actual result | |---|---| | Decision / observer start | 04:25:23.940 / 04:25:24.078 | | Failed deployment | 04:26:25.354–04:27:52.043; 86.690 s; build 9 FAILURE | | First failed request | 04:26:53.130 | | Recovery job began | 04:28:38.093 | | Recovery Ansible | 04:29:10.106–04:30:06.603; 56.497 s; ok=10 changed=2 failed=0 | | First recovered v2 response completed | 04:29:44.923; request started 04:29:43.205 | | Unchanged rerun | 04:30:10.352–04:30:58.451; 48.099 s; ok=10 changed=0 failed=0 | | Recovery job ended | 04:30:59.765 SUCCESS; 141.672 s total | Staging: **406 requests, 169 failures** (168 HTTP 502, one timeout), ending 04:32:11.031. Adjacent successful response completions: 04:26:52.273 and 04:29:44.923, **172.650 s apart**. This includes fault, collection/selection, new-job gates and restoration; it is not Ansible duration or an exact continuous outage. Maximum request-start gap: 2.018 s. Production had no additional failed observer requests during the staging exercise; its Compose hash was unchanged. ## Monitoring, final state and limits At 04:34:28.765: production v1/source 34f26e6/total 30; staging v2/source 6bddbfb/total 36. Both healthy, exact original digests/configuration restored, invalid quantity 0 returned HTTP 400, no published application host port. All six scrape targets were up and all three HTTPS probes were 1. The 34 production samples since the decision were all 1: the 30-second probe missed the short rollback interruption captured by the finer observer. Grafana was flat over this exercise, unlike the earlier v2-release dip. The captured 90-minute query returned no `ALERTS` samples; no notification history or Discord-notification claim is made. Staging used its own observer, not the production-only chart. Capacity sample: 1,967 MiB RAM, 660 MiB available; swap 476/2,047 MiB; root space 8.9 GiB available, 62% used. Pricing used 32.53/33.68 MiB; agent 131.9/512 MiB and 71/128 tasks, zero new process-limit events since restart. Grafana used 188.4/192 MiB. These are point samples, not load/soak tests. Serialize jobs on the shared CPU. The same-host observer shares the Droplet failure domain; no off-site monitoring or high availability is claimed. Status-only probes cannot verify price. Both bounded observers were stopped after post-recovery verification rather than waiting out their 1,800-second maximum. Only their verified PIDs were signaled. Earlier services, volumes, credentials, gates and backups remain. [Issue 28](https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/issues/28) was created with Vincent's explicit authorization at 04:33:40 during finalization, after implementation and exercises. It records a late workflow correction, not a pre-implementation issue. Final group review/merge and submission remain.