\chapter{Weekly Reports}\ChapterLabel{WeeklyReports} \section{Week Report 12 (November 20, 2026)}\label{WeeklyReport:12} \begingroup \footnotesize \noindent\textbf{Work Completed During the Past Week}\par\smallskip I prepared the Windows Alpha \hyperref[Figure:AlphaDeployment]{deployment view} and reviewed plugin records, operations, capabilities, provider choice and lifecycle policy in separate UML views (\hyperref[Section:PluginContract]{plugin contract}). Requirements/use cases now cover provider choice, updates and creation with reciprocal planned checks. The report contains 104 product requirements and 81 test definitions; those counts do not mean all tests have executed. I then extracted rectangle presentation, selection, movement and resizing into a separately loaded native module through a Qt Core API (\hyperref[Section:CurrentPlugin]{implemented extraction}). The host retains syntax/source rewriting and guarded document acceptance. All six Debug and all six Release CTest suites passed, including actual DLL loading, missing and incompatible modules, geometry parity and invalid-proposal rejection (\hyperref[Section:RectanglePluginCheck]{evidence}). The separate \texttt{0.1.2-alpha} package started with a Windows-only PATH; the original 0.10.3 package remains frozen. Feature-based numbering reserves \texttt{0.2.0-alpha} for later shape discovery and creation. For this assignment I added draft \hyperref[Persona:PERS-001]{PERS-001, a TikZ-literate report author}, rather than claiming an interview result. Its \hyperref[Table:PersonaInterfaceMapping]{interface mapping} and actual \hyperref[Figure:CurrentUIWireframe]{application screenshot} connect layout, source preservation and saving needs to the fitted canvas, corner handles, read-only source pane and file controls. Current host/provider class, MVC and \hyperref[Figure:CurrentPluginDeployment]{deployment} views distinguish this implementation from future design. I also prepared the missing Week 11 entry from dated resize evidence, explicitly marking its retrospective preparation. \medskip\noindent\textbf{Work Planned for Next Week}\par\smallskip Prepare the Alpha demonstration and preliminary-design submission; review shape discovery, creation placement and source-insertion contexts before implementing the next feature milestone. Review the package with intended users. \medskip\noindent\textbf{Action Items}\par\smallskip Rehearse Open--move/resize--Save--reopen; confirm persona/interface priorities; retain the frozen demo and regression fixtures while reviewing the new package. \medskip\noindent\textbf{Issues and Risks}\par\smallskip The native API requires the matching toolchain and is not a sandbox. Syntax variants and source preservation remain risks. Provider choice/update UI, creation, undo/redo and integrated compilation remain pending. The passing bounded suites do not establish general plugin or product acceptance. \endgroup \clearpage \section{Week Report 11 (November 13, 2026)}\label{WeeklyReport:11} \begingroup \footnotesize \noindent\emph{Prepared retrospectively on November 20 from dated project records. Completed work below covers November 7--13, not the later plugin review.} \medskip\noindent\textbf{Work Completed During the Past Week}\par\smallskip Following Week 10's plan, I implemented rectangle corner resizing with corner crossing, independent $0.01$ cm minimum dimensions and stroke-aware boundary clamping. Move and resize stop at the furthest valid geometry rather than rejecting the whole gesture. A changed release applies one guarded coordinate batch; cancellation and unchanged releases preserve the source revision. All five Debug and all five Release CTests passed on November 12. Checks covered all corners, thin rectangles, crossing, bounds, cancellation, stale requests, view transforms and save/reopen, preserving the stationary box and unrelated source. The saved resize sample also compiled with TinyTeX. These are retained results, not tests rerun for this report; see the \hyperref[Section:RectangleResizeCheck]{resize evidence}. I updated \RequirementRef{REQ-F-025}, \RequirementRef{REQ-I-013}, \UseCaseRef{UC-002} and their checks. The \hyperref[Figure:ClassEditService]{edit-service class view}, \hyperref[Figure:DragSequence]{move/resize sequence} and \hyperref[Figure:DragActivity]{activity} document responsibilities and interaction. The resize work is checkpoint \texttt{5a776cb}. Plugin loading, undo/redo and integrated compiler/PDF viewing remain unimplemented. \medskip\noindent\textbf{Work Planned for Next Week}\par\smallskip No contemporaneous Week 11 plan was retained. My follow-up plan, recorded now, is to review the rectangle-plugin interface, presentation records and lifetime wiring before extraction, and prepare the Alpha demonstration. The existing working package will remain available while extraction uses a separate package. \medskip\noindent\textbf{Action Items and Risks}\par\smallskip Confirm the extraction interfaces, rehearse the supported resize/save workflow, and retain regression fixtures. Arbitrary TikZ support and plugin compatibility remain risks; keep the first extraction narrow and require source-preservation and geometry-parity checks. Late report preparation is explicitly dated above. \IfFileExists{../assets/weekly-report-11/autobuild.png}{% \begin{center} \includegraphics[width=0.94\linewidth,height=1.42in,keepaspectratio]{../assets/weekly-report-11/autobuild.png}\par \scriptsize First November 20 report autobuild (offscreen log view), \texttt{0.1.1-alpha}; versioned PDF ZIP. This is current documentation evidence, not a November 13 build or new executable. \end{center} }{} \endgroup \clearpage \section{Week Report 10 (November 6, 2026)}\label{WeeklyReport:10} \begingroup \footnotesize \noindent\textbf{Work Completed During the Past Week}\par\smallskip I prioritized canvas feedback over Week 9's planned history implementation. The prototype now fits the canvas to the pane, shows the fixed editing area, and repaints the box without leaving trails in a clipped raster check. Four automated tests passed. I refreshed Windows prototype 0.1.0 and checked that it closed and reopened with a Windows-only PATH. The canvas and tests are in local checkpoint \texttt{0aeef51}. I linked the canvas requirements and the named numeric values rule (\ChapterRef{Requirements}) to checks and clarified the out-of-bounds branch in \UseCaseRef{UC-002}. The \hyperref[Figure:ClassDiagramView]{canvas view class diagram} and \hyperref[Figure:DragSequence]{whole-element drag sequence} document the implemented prototype. The automated report build produces a versioned ZIP. See \hyperref[Table:DocumentHistory]{Document History} for this version. \medskip\noindent\textbf{Work Planned for Next Week}\par\smallskip I will review the packaged drag on Windows, settle the minimum usable box size, and implement and test a corner resize as one guarded source edit. The rectangle plugin follows a working resize baseline. \medskip\noindent\textbf{Issues and Risks}\par\smallskip Native drag acceptance remains pending. I will use the two-box fixture for that review and check that resizing preserves unrelated source. History and provider registration remain deferred. \IfFileExists{../assets/weekly-report-10/autobuild.png}{% \begin{center} \includegraphics[width=0.94\linewidth,height=1.58in,keepaspectratio]{../assets/weekly-report-10/autobuild.png}\par \scriptsize First automated 1.10.0 package run. The final ZIP was rebuilt with this capture included. \end{center} }{} \endgroup \clearpage \section{Week Report 9 (October 30, 2026)}\label{WeeklyReport:9} \begingroup \footnotesize \noindent\textbf{Work Completed During the Past Week}\par\smallskip I completed Week 8's review of transaction records and ownership: the document will control atomic source/history updates, the edit service prepares proposals, the file store handles I/O and the controller coordinates. Reviewed rejection feedback, attached labels, overlap selection and provider boundaries are now in requirements (\ChapterRef{Requirements}), use cases (\ChapterRef{UseCases}), planned class views (\ChapterRef{SoftwareArchitecture}) and activity/sequence diagrams (\AppendixRef{DesignDocuments}). Unfinished registration, ambiguity and lifetime choices remain in the temporary \ChapterRef{OpenDesignDecisions}. I prepared and submitted Milestone 2 version 1.8.1.1. I updated the project constraints (\ChapterRef{TeamDeclaration}), tradeoffs and design iterations (\ChapterRef{DevelopmentPlan}), stories (\ChapterRef{UserStories}), standards applicability (\ChapterRef{CodesStandards}), test plan (\ChapterRef{Tests}) and reciprocal mappings (\ChapterRef{Traceability}). The 72 requirements and 59 planned test cases map to verification (\ChapterRef{Verification}); ten stories map to validation (\ChapterRef{Validation}). The final audit added zoom clarity and compiled-output agreement to VAL-002. Both editions built and passed visual review. Transaction/history implementation was deferred for review and documentation. No new feature, product test run or participant validation is claimed. This weekly starts report 1.9.0; the \hyperref[FrontMatter:Abstract]{abstract}, linked \hyperref[Table:DocumentHistory]{Document History} and report roadmap (\AppendixRef{ReportRoadmap}) are updated. \ifSubmissionBuild\else Internal authoring guidance and assistance records are updated in \AppendixRef{AIAgentGuide} and \AppendixRef{AIPromptLog}. \fi \medskip\noindent\textbf{Work Planned for Next Week}\par\smallskip I will review provider registration, competing interpretations, compatibility and lifetime, then begin the narrow transaction/history prototype and exact-source undo/redo checks after resolving its required interfaces. \medskip\noindent\textbf{Action Items}\par\smallskip \begin{enumerate}[leftmargin=*,nosep] \item Review one label expressed in two source forms to test provider boundaries. \item Settle required record/interface details and implement the agreed history path. \item Obtain Milestone 2 feedback and clarify the package-screenshot scope. \end{enumerate} \medskip\noindent\textbf{Issues and Risks}\par\smallskip Syntax variants, provider lifetimes and history memory remain risks. I will retain the bounded parser and atomic acceptance boundary, review ambiguity explicitly and measure storage before choosing limits. Labels, menus, plugins and undo/redo remain planned. Instructor feedback and product acceptance are pending. \endgroup \clearpage \section{Week Report 8 (October 23, 2026)}\label{WeeklyReport:8} \begingroup \footnotesize \noindent\textbf{Work Completed During the Past Week}\par\smallskip I completed Week 7's Qt/C++ setup, build and initial parsing objectives. The running prototype displays explicit-coordinate rectangles, lines and arrows, supports whole-element dragging/cancellation, preserves unrelated source and saves/reopens edits. Four automated checks pass; eight reference drawings and three saved outputs matched compiled TikZ within the prototype's one-pixel allowance. I clarified transaction/history and plugin behavior in linked requirements, use cases and planned tests, aligned UC-004's TikZ diagram, and separated proposed collaborators from current classes. Detailed ownership review remains pending; undo/redo and plugins are unimplemented. I packaged prototype 0.1.0 with Qt 6.12.0 and checked startup without the development Qt PATH. Its directory appears below. Report 1.8.0 uses separate weekly numbering; Document History is updated. \medskip\noindent\textbf{Work Planned for Next Week}\par\smallskip I will review records, validation and ownership, update class diagrams, then begin the common transaction/history implementation and exact-source undo/redo checks. \medskip\noindent\textbf{Action Items}\par\smallskip \begin{enumerate}[leftmargin=*,nosep] \item Resolve transaction collaborator responsibilities and ownership. \item Implement and test agreed history behavior after review. \item Confirm the instructor's intended built-package screenshot scope. \end{enumerate} \medskip\noindent\textbf{Issues and Risks}\par\smallskip Broader syntax, element insertion, endpoint editing and integrated PDF preview remain pending. I will retain the narrow subset and regression checks while reviewing plugin lifetimes and history storage. Native acceptance and performance targets remain unverified; a package startup check does not establish acceptance. \begin{center} \includegraphics[width=0.97\linewidth,trim=105bp 289.8bp 0bp 24bp,clip]{../assets/weekly-report-8/package-directory-2026-10-23.jpg}\par \scriptsize Prototype package 0.1.0, Windows x64; Qt 6.12.0; October 23, 2026. \end{center} \endgroup \clearpage \section{Week Report 7 (October 16, 2026)} \begingroup \footnotesize \subsection*{Work Completed During the Past Week} I added Developer Requirements for source organization, naming, inheritance, and ownership, with proposed checks and traceability. I applied the agreed \texttt{tkr} prefix to the six classes, matching files, build references, and design diagrams. I clarified the maximum of three project-defined inheritance levels: base, child, and grandchild. The current design needs no additional subclasses. I clarified my professor's diagram-authoring workflow and submitted the IDE stakeholder-validation response. He estimated 30--60 minutes for Visio diagram creation and about five minutes for editing existing diagram TeX files. These describe different tasks, not measured savings. He described increasing manual TikZ creation effort with complexity and requested adding elements to AI-generated diagrams, a need for later scope review. Week 6's planned diagram review, Qt/C++ setup, scaffold build, and foundation tests remain pending. The parsing and box-drag prototype has not begun. \subsection*{Work Planned for Next Week} Next week, I will review the MVC, class, and activity diagrams for responsibilities and ownership, configure the Qt/C++ toolchain, build the scaffold, and run its foundation tests. If successful, I will begin explicit-coordinate parsing for the separated-box contact workflow. I will assess the new creation need against the initial editing scope. \subsection*{Action Items} \begin{enumerate}[leftmargin=*,nosep] \item Finish diagram review and record corrections. \item Verify the Qt/C++ build and foundation tests before extending code. \item Start explicit-coordinate parsing and the box-contact prototype. \end{enumerate} \subsection*{Issues and Risks} Limited availability and companion coursework delayed review and implementation. I will resume with review and build checks while retaining the narrow initial subset. Parsing, dragging, source preservation, response time, and canvas/PDF agreement remain unverified. Stakeholder estimates require further investigation before establishing performance targets or broader scope. \endgroup \clearpage \section{Week Report 6 (October 9, 2026)} \begingroup \footnotesize \subsection*{Work Completed During the Past Week} I advanced Week 5's class-design plan by defining responsibilities, interfaces, ownership, naming conventions, and a shallow inheritance structure. I prepared the initial six-class C++/Qt scaffold, build configuration, coding guide, and foundation tests, and aligned the Development Plan with these decisions. The application has not yet been compiled or run. I added TikZ class and activity diagrams, then expanded the design documentation with a model--view--controller allocation, a responsibility and interaction overview, and linked details for each class. Following reported Milestone 1 feedback, I also linked the use-case tables to the overview and individual use-case diagrams. These diagrams are prepared, but my review is still in progress. I drafted the companion IDE course's initial project understanding with supporting research. I also checked the new weekly-assignment documentation instructions: requirements and user-story tables already exist, and the glossary now uses a linked table of terms and definitions. \subsection*{Work Planned for Next Week} Next week, I will finish reviewing the design diagrams and resolve any responsibility, interface, or ownership discrepancies. I will install and verify the Qt/C++ toolchain, build the scaffold, and run the prepared foundation tests. If the build succeeds, I will begin explicit-coordinate parsing and the box-drag prototype planned in Week 5, which remains pending. \subsection*{Action Items} \begin{enumerate}[leftmargin=*,nosep] \item Finish diagram review and record needed corrections. \item Configure the Qt/C++ kit and run the scaffold and foundation tests. \item Begin parsing and the separated-box contact workflow. \end{enumerate} \subsection*{Issues and Risks} Limited availability delayed diagram review and prototype work. I will resume with review and build verification before expanding implementation. Parsing, dragging, source preservation, response time, and canvas/PDF agreement remain unverified; planned tests and reference diagrams are not passing application test evidence. \endgroup \clearpage \section{Week Report 5 (October 2, 2026)} \begingroup \footnotesize \subsection*{Work Completed During the Past Week} I reviewed the Development Plan and provisional requirements with my professor's feedback, clarifying dragging, basic shapes, offline operation, saving, and immediate visual feedback. I examined the previous group's report and repository for lessons about compilation, preview, plugins, and agreement between the editor and compiled output. I defined an explicit-coordinate subset for lines, arrows, and rectangles, compiled reference examples and expected edits, and expanded proposed coordinate-conversion and output-comparison tests. The examples include moving separated boxes into contact. I also explored a TikZ loop with a compiled DVI example. These are reference demonstrations; application tests remain unexecuted. I selected C++ with Qt and discussed six initial classes, folders, shallow inheritance, and ownership. I agreed on descriptive names, variable type prefixes, and \texttt{m\_} private-member markers. This advances Week 4's subset, stakeholder, and architecture work. The planned PySide6 test was not built; Qt/C++ feasibility work will replace it. \subsection*{Work Planned for Next Week} Next week, I will review class boundaries, interfaces, and ownership, document the language and naming decisions, and generate initial class files and build configuration. I will begin a prototype to evaluate dragging, coordinate conversion, minimal source updates, and compiled-output agreement. \subsection*{Action Items} \begin{enumerate}[leftmargin=*,nosep] \item Finalize class responsibilities and ownership. \item Verify the Qt/C++ build environment and document naming rules. \item Start the box-contact prototype and retain comparison evidence. \end{enumerate} \subsection*{Issues and Risks} Interaction speed, source preservation, and rendering agreement remain unverified. I will evaluate immediate canvas feedback separately from compilation, check coordinate conversions independently, and compare saved output with reference geometry. Broader syntax remains deferred. \noindent\textbf{Reminder for Next Session:} Resume review of the six proposed class boundaries, ownership, and interfaces before generating files. \endgroup \clearpage \section{Week Report 4 (September 25, 2026)} \begingroup \footnotesize \subsection*{Work Completed During the Past Week} I prepared and presented Demo 1, then continued the Development Plan for Milestone 1. I drafted provisional user stories, product requirements, use cases, test cases, and a traceability matrix. I revised the use-case and requirement tables to follow the course template and added a use-case diagram. The plan now includes a phase-level work breakdown and a provisional TikZ Gantt chart based on my tentative milestone dates. I also prepared separate submission and developer editions of the report after learning that the AI prompt log may be omitted from the submitted PDF. This completed the initial requirements and use-case drafting planned in Week 3. The precise supported TikZ subset, component and data-flow sketch, and PySide6 feasibility test remain to be done. The proposed requirements and tests are drafts, not approved scope or executed test results. \subsection*{Work Planned for Next Week} Next week, I will review the Milestone 1 Development Plan for gaps, including resources and skills, and seek feedback on the provisional stories and requirements. I will define a first supported TikZ object and the source preservation boundary, then sketch the major application components and begin a focused PySide6 feasibility test for graphical interaction and external LaTeX compilation. I will assess the previous group's materials if access becomes available. \subsection*{Action Items} \begin{enumerate}[leftmargin=*,nosep] \item Review the Milestone 1 plan and request stakeholder feedback. \item Specify the first editable TikZ subset and source-preservation rules. \item Sketch the architecture and run the first PySide6 feasibility check. \end{enumerate} \subsection*{Issues and Risks} The supported syntax and stakeholder expectations are not yet confirmed, and the framework has not been tested in a prototype. I will keep the first workflow narrow, seek feedback using representative diagrams, and use the feasibility check before committing to the implementation approach. Access to the previous project remains pending, so current planning does not depend on it. \endgroup \clearpage \section{Week Report 3 (September 18, 2026)} \begingroup \footnotesize \enlargethispage{1in} \subsection*{Work Completed During the Past Week} This week, I advanced the project definition and scope planned in Week 2 even though the previous group's materials were not yet available. I completed the Milestone 0 Team Declaration, which established the TikZRefinery team identity, project proposal, mission statement, key drivers, and key constraints. This work clarified the business intent: reduce the effort required to refine rough or AI-generated TikZ diagrams while preserving readable, editable source. I also refined the initial prototype boundary. The project remains a local desktop application centered on source editing, external LaTeX compilation and preview, basic graphical manipulation, and reliable \gls{roundtripediting} for a deliberately limited \gls{tikzsubset}. I documented source synchronization, the external toolchain, the senior-design schedule, and single-developer capacity as constraints that must shape the requirements and architecture. Qt 6 and PySide6 remain implementation candidates rather than approved choices. Finally, I maintained the project report and repository records so that the proposal, glossary, revision history, AI-use records, and future chapter plan remain consistent. \subsection*{Work Planned for Next Week} Next week, I will turn the approved proposal into initial platform-independent requirements and use cases, define the first supported TikZ object and editing subset, and draft the application's component and data-flow boundaries. I will also build a small PySide6 feasibility test for application startup, a graphics scene, and external compilation without treating the result as a final framework decision. If the previous group's materials arrive, I will review them for reusable lessons, constraints, and failure modes. \subsection*{Action Items} \begin{enumerate}[leftmargin=*,nosep] \item Draft and review initial requirements and representative use cases. \item Define the minimum TikZ subset and source-preservation rules. \item Sketch the component architecture and run the PySide6 feasibility test. \item Review prior-project evidence when it becomes available. \end{enumerate} \subsection*{Issues and Risks} Delayed access to the previous project may hide useful lessons, so current work will remain independent and later findings will be evaluated rather than adopted automatically. Scope remains the primary risk for a single developer; the prototype will prioritize a verifiable end-to-end workflow over broad TikZ support. \endgroup \clearpage \section{Week Report 2 (September 11, 2026)} \subsection*{Work Completed During the Past Week} This week, I resolved the platform and ownership question from Week 1. I separated from the original group so that Turan and Sergio could continue with their web direction, while I began pursuing the graphical TikZ editor as an independent desktop project. I selected the name TikZRefinery to reflect the goal of turning rough or AI-generated TikZ diagrams into carefully adjusted, editable results. I investigated \gls{qt} 6 with \gls{pyside} as the leading desktop framework. Qt Widgets could provide the application shell, while QGraphicsScene and QGraphicsView could support selectable and movable diagram elements. I also identified that Qt would launch and display results from a separate LaTeX toolchain rather than compile LaTeX itself. This clarified a preliminary workflow from TikZ source, through external compilation, to PDF preview and graphical adjustment. I also learned that a previous senior-design group attempted this project using an existing open-source application. I requested access to its repository so I can review its approach and failures before committing to a final architecture. The \gls{minimumprototype} remains centered on source editing, compilation and preview, and manipulation of a deliberately limited subset of TikZ objects. \subsection*{Work Planned for Next Week} Next week, I will review the previous implementation if it becomes available, write initial platform-independent \glspl{requirement}, define the supported \gls{tikzsubset} for the minimum prototype, and draft the desktop application's major components and data flow. I will also prepare a small PySide6 feasibility test without treating the framework choice as final. \subsection*{Action Items} \begin{enumerate}[leftmargin=*,nosep] \item Obtain and assess the previous group's repository and lessons learned. \item Define the minimum supported editing and compilation workflow. \item Draft initial requirements and a preliminary component architecture. \end{enumerate} \subsection*{Issues and Risks} The previous repository may be delayed, so I will continue with requirements that do not depend on it. Supporting arbitrary TikZ would create excessive parsing and round-trip-editing risk for one developer; the first prototype will therefore use a documented subset and preserve unsupported source where possible. The project scope will be reviewed against the available schedule. \clearpage \section{Week Report 1 (September 4, 2026)} \subsection*{Work Completed During the Past Week} This week, I selected the professor-provided idea of a graphical TikZ editor and began defining the problem. AI-generated diagrams may contain spacing, alignment, or scale errors that require precise human correction, while editing those details directly in LaTeX can be difficult. The proposed application would provide graphical manipulation while retaining editable TikZ source. I discussed the platform with Turan and Sergio. A web application aligned with Turan's experience, while I was more interested in desktop development. I identified graphical editing, source synchronization, LaTeX compilation, preview, and EPS export as major needs. Reliable \gls{roundtripediting} between the graphical view and TikZ source appears to be the central technical challenge. \subsection*{Work Planned for Next Week} Next week, I will clarify ownership of the web and desktop directions, define a minimum viable product, configure and test the LaTeX report, compare desktop user-interface frameworks, and begin outlining the application architecture. \subsection*{Action Items} \begin{enumerate}[leftmargin=*,nosep] \item Resolve the platform direction and project ownership. \item Define the minimum prototype and test the LaTeX and desktop tools. \end{enumerate} \subsection*{Issues and Risks} Unresolved platform scope could divide effort; I will establish clear ownership before implementation. Because arbitrary TikZ is difficult to rewrite safely, early prototypes will target a limited subset.