This group document records the SSW 590 coursework and its supporting commands, designs, and evidence. Assignment 8 implements secure delivery with a trusted Jenkins agent, locked Flask/Gunicorn service, security gates, Ansible, scoped deployment credentials and recovery runbooks. The prerequisite jobs, DNS/TLS and deliberate Jenkins test/secret blocks passed. The reviewed v1 images were published with passing scans. After the SSH and health-deadline corrections were reviewed, Jenkins builds 5 and 6 promoted v1 and v2 by exact digest through separate staging/production environments. Both unchanged reruns passed with zero changes; Vincent approved each production operation. The production probe and Grafana panel are live. One failed availability sample was observed during v2 replacement; zero downtime is not claimed. The actual release records and staging-only fault still require review before the healthy production rollback and failed-staging recovery demonstrations. This draft is not ready for submission. Assignment 7 introduced site reliability engineering: Prometheus, Grafana OSS, Node Exporter, and Blackbox Exporter run as four pinned containers beside Gitea and Jenkins on the originally 1\,GiB DigitalOcean droplet, with Grafana at \url{https://metrics.yebilly.me/login} for approved networks only. A dashboard shows host CPU, memory, and disk and the HTTPS availability of Gitea and Jenkins. A 99\% availability objective is defined and measured, and three alert rules (service availability, disk space, and collection health) notify the team's Discord channel. Each was shown firing and resolving; the availability rule through a planned Jenkins outage that was detected in about two minutes and recovered about a minute after restart. Earlier chapters retain the group's prior assignment results, including the Jenkins merge gate and the Gitea Actions manual build. On November 14 the team resized the droplet to 2\,GiB without enlarging its disk, updated packages and verified the existing services.