# Implement Assignment 8 secure delivery and rollback Use instructor manual 1.43 Chapter 6 and its Startup Pricing Service on the existing Gitea/Jenkins/Caddy/monitoring foundation. - [x] Prepare exact dependencies, base digest, trusted agent and Ansible. - [x] Verify deploy SSH, host-key pinning, sudo and target prerequisites. - [x] Prepare gates, pipeline, approval and recovery automation. - [x] Review/merge v1 source; configure staging/app DNS and TLS routes. - [x] Show blocked unit-test and synthetic-secret Jenkins runs, then repair. - [x] Publish v1; deploy staging; prove changed=0; approve production. - [x] Preserve v1 records; review/merge v2; promote the same v2 digest. - [x] Roll production back to matching v1 image/config; measure interruption. - [x] Review staging-only bad command; show failed wait and recovery. - [x] Add production monitoring and correlate actual samples/timestamps. - [ ] Review/merge final traceability, runbooks, history, AI log and PDF; submit. Actual execution, 15 November Eastern / 16 November UTC: - Reviewed implementation and corrections: PRs [24](https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/pulls/24), [25](https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/pulls/25), [26](https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/pulls/26), and [27](https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/pulls/27). - [Build 5](https://ci.yebilly.me/job/secure-delivery/job/pricing/5/) and [build 6](https://ci.yebilly.me/job/secure-delivery/job/pricing/6/): v1/v2 promotions, exact digests, passing gates, changed=0, and real Vincent approvals. - [Build 8](https://ci.yebilly.me/job/secure-delivery/job/pricing/8/): healthy production rollback passed with original v1 image/configuration, source 34f26e6 and total 30. Vincent approved at 04:23:36 UTC. Nine failed HTTPS samples were observed; zero downtime is not claimed. - [Build 9](https://ci.yebilly.me/job/secure-delivery/job/pricing/9/): the reviewed staging-only port mismatch failed Compose wait and blocked production. - [Build 10](https://ci.yebilly.me/job/secure-delivery/job/pricing/10/): restored the original v2 staging configuration/digest, source 6bddbfb, total 36, then changed=0 on rerun. - Final verified state at 04:32 UTC: production v1, staging v2; both healthy. Six monitoring targets were up. Prometheus's 30-second samples missed the brief rollback interruption that the one-second observer captured. Staging had 169 failed samples during the deliberate fault/recovery. This tracking issue was created during finalization, after the implementation PRs and operational exercises; it is not a claimed pre-implementation issue. The final evidence PR should close it after peer review. A first rollback attempt (build 7) stopped before deployment with a runner process-limit error; the idle runner was restarted without changing its limits before build 8. Local preparation is not assessed release evidence. Preserve branch protection and earlier services/data; keep credentials out of Git and reports.