Commit Graph
4 Commits
Author SHA1 Message Date
billandClaude Opus 5.5 336eaaefa7 Add SRE monitoring chapter and manual v5.0 (refs #19)
vpn-dns-gateway/pipeline/pr-main This commit looks good
New chapter "Introduction to SRE: Monitoring and Reliability" covering the
eight Assignment 7 rubric rows: deployment and capacity trial, metrics and
probes, HTTPS and exposure tests, dashboard and build comparison, SLI/SLO
worked example and measured window, alert rules and tests, the Jenkins
outage exercise with blameless review (#20, #21), and controls.

- Title page and abstract for Assignment 7 "Grafana and Prometheus SRE --
  Group", version 5.0; Document History entry.
- Hosts table: monitoring containers, ports, volumes, metrics DNS, swap,
  disabled host services, monitoring and backup status.
- Passwords table: Grafana billy and vsun1, monitoring secrets file,
  Discord webhook (hints only).
- Glossary: SLI, SLA, SRE, error budget, exporter, scrape, contact point,
  blameless review. AI prompt log record.
- EVIDENCE.md: SLO window, post-recovery build, probe status codes,
  improvement issues, Grafana accounts. Outage dashboard figure.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-28 13:08:23 -04:00
billandClaude Opus 5.5 1149e9fbc3 Document Assignment 6 Jenkins CI in the manual (refs #14)
vpn-dns-gateway/pipeline/head This commit looks good
vpn-dns-gateway/pipeline/pr-main This commit looks good
Add the Continuous Integration with Jenkins chapter in the eight rubric
sections: deployment and persistence (capacity test, memory-limit fix,
restart test), HTTPS/access/firewall with IPv4 and IPv6 exposure checks,
webhook traceability with an actual deployment diagram, pipeline stages,
the required pr-main merge gate, PR #15's failure/repair/review/merge
sequence, credentials and controller build boundary, and controls.

Update the Hosts and Passwords tables (1 GiB resize, Jenkins and
ci.yebilly.me, jenkins-bot account and token hints), the title page,
abstract, Document History, glossary, and AI prompt log (including
Vincent's prepared Oct 19-21 record). Note that Assignment 5's PR #13
merged.

Also version pipeline-graph-view and its dependencies in the Jenkins
plugin lockfile, and add Vincent's source-only ci/jenkins-capacity test.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-22 21:20:31 -04:00
vsun1 63bb5ed27e Document successful repair and finalize Assignment 5 evidence (refs #12)
Automated Manual Build / manual (push) Successful in 30s
2026-10-07 22:31:53 -04:00
vsun1 828f6c555b Add automated LaTeX manual build (refs #12)
Automated Manual Build / manual (push) Successful in 1m27s
2026-10-07 18:56:18 -04:00