Finalize Assignment 8 recovery evidence and manual
This commit is contained in:
@@ -1050,3 +1050,59 @@ still require those reviewed commits and measured evidence. Codex updated
|
||||
current inventory, architecture, runbooks, history and this record, then rebuilt
|
||||
and visually checked the ignored local PDF. Existing Billy/Claude records and
|
||||
historical execution evidence were preserved.
|
||||
|
||||
\section{Completed Rollback and Staging Recovery}
|
||||
Date: November 15, 2026 Eastern (November 16 UTC); Tool: OpenAI Codex;
|
||||
Human: Vincent Sun; Reviewer of preceding PR: Billy Ye. Vincent reported
|
||||
PR~\#27 merged and asked Codex to finish. Codex reread repository requirements
|
||||
and status, fetched main, verified Billy's 04:12:09 UTC approval and Vincent's
|
||||
04:14:30 merge, and created \texttt{codex/assignment8-final-evidence} from
|
||||
\texttt{72bf10d}. Actions workflow 16 passed before recovery. No commit or
|
||||
push was performed by Codex.
|
||||
|
||||
Codex recorded the healthy-v2 rollback decision and started the reviewed HTTPS
|
||||
observer on The-Ocean. Build 7 stopped before deployment with \texttt{Cannot
|
||||
fork}; task-limit pressure was observed, but its underlying accumulation cause
|
||||
was not established. Codex restarted only the idle delivery agent without
|
||||
raising limits or changing identity, workspace or image. Build 8 passed tests
|
||||
and source gates, then requested a real human production approval. Vincent
|
||||
clicked it himself; Codex verified the archived \texttt{vsun1} identity and
|
||||
04:23:36 UTC decision. The job restored the original v1 image and matching
|
||||
configuration, then verified source, health and total 30. Its deployment took
|
||||
63.904 seconds; the observer captured nine failed requests. The original
|
||||
12.641-second gap between adjacent successful response completions is not
|
||||
claimed as an exact continuous outage.
|
||||
|
||||
A separate staging observer preceded build 9's explicitly selected reviewed
|
||||
port-mismatch configuration. The same v2 digest was retained; Compose wait
|
||||
reported unhealthy and blocked Jenkins before production. Codex captured the
|
||||
failed state and production isolation, then ran build 10 with the original
|
||||
good v2 staging record. It restored the historical playbook/template with
|
||||
\texttt{git archive}, verified v2/source/total 36 and passed changed=0 on rerun.
|
||||
The staging observer captured 169 failed requests; its adjacent successful
|
||||
responses were 172.650 seconds apart, including collection/selection and new-job
|
||||
gates as well as deployment. No image was rebuilt for either recovery.
|
||||
|
||||
Codex preserved exact Jenkins reports, hashes and actual timing. A final runtime
|
||||
capture confirmed production v1/staging v2, correct digests/configuration,
|
||||
invalid-input HTTP 400 and six targets up. The 30-second production probe
|
||||
missed the rollback interruption seen by the finer observer; the actual Grafana
|
||||
chart was flat. No alert-notification history or zero-downtime claim was
|
||||
invented. The first new Grafana screenshot was taken while its panel was still
|
||||
loading; it was replaced only after the chart visibly rendered. Both task
|
||||
observers were stopped by verified PID after post-recovery samples. Original
|
||||
CSV bytes were recopied and checked over pinned SSH; an earlier helper's
|
||||
normalized-text hash is explicitly distinguished from the original byte hash.
|
||||
Git attributes preserve the committed CSV bytes and runtime JSON line endings.
|
||||
|
||||
The assignment requires a tracking issue; none existed. Codex prepared a
|
||||
concrete issue with actual completed-run links and asked Vincent before
|
||||
publishing a project message under his account. Vincent explicitly replied
|
||||
``Yes, publish the prepared issue.'' Codex created issue~\#28 at 04:33:40 UTC
|
||||
and verified it. This late creation is disclosed, not backdated. It prepared
|
||||
the final evidence PR description, source/access links, measured timeline and
|
||||
CSV-derived figure; updated the Hosts table/diagram to production v1 and
|
||||
staging v2, Document History and this log; and prepared the complete TinyTeX
|
||||
build and visual review. Passwords hints, credentials, permissions, earlier
|
||||
coursework, Billy/Claude records and shared services were preserved.
|
||||
Vincent handles final commits/pushes and submission; Billy reviews the final PR.
|
||||
|
||||
Reference in New Issue
Block a user