# Completed production rollback and staging recovery
Executed 15 November 2026 Eastern / 16 November UTC. All times below are UTC.
Primary data: [results and report hashes](recovery-20261115.json),
[actual runtime and Prometheus responses](recovery-runtime-20261115.json),
[original production CSV](recovery-production-20261115.csv), and
[original staging CSV](recovery-staging-20261115.csv). CSV bytes and SHA-256
values were verified against the remote originals.
## Review and baseline
[PR 27](https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/pulls/27) was approved
by `bill` at 04:12:09 and merged by `vsun1` at 04:14:30 as
`72bf10dcecc8db65dce4750c05bf841bea9b0834`. It preserves the actual successful
release records, bad configuration `1e23001e7303d14630cfa97c8de36f31f30b81a0`
and immediate revert `29e580c4613f00a02f44bce0dbcee2fd8fdc83ae`. Main is good.
[Actions workflow 16](https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/actions/runs/16)
passed in 2m17s before recovery. Jobs 7–10 used reviewed main `72bf10d` for
control code; their release records select historical app/configuration commits.
## Healthy production rollback
This was a planned exercise on healthy v2, not an incident. Decision:
04:17:46.307. The reviewed HTTPS observer started before approval. The original
v1 production record selects source/configuration
`34f26e6948b7001ede8ca19f23b67a02082e6a9a` and image:
```text
git.yebilly.me/ssw590-group1/pricing@sha256:59c880b2704f91668618d9a2ff0bc8fbab0af4239ceb916de261863890ef88d8
```
[Build 7](https://ci.yebilly.me/job/secure-delivery/job/pricing/7/) stopped after
17.784 s with `Cannot fork` during test setup, before approval/deployment.
The agent cgroup showed 115/128 tasks and two limit events; Docker stats showed
132.6/512 MiB, PIDS=114 and no OOM kill. Its process listing showed Java only;
the accounting/accumulation mechanism was not established. Only the idle
delivery-agent container was restarted, preserving identity, workspace, image,
all limits and application services. Immediate Docker stats showed PIDS=13.
No resource/security limit was raised. Build 8 is the successful retry.
| Build 8 event | Actual result |
|---|---|
| [Jenkins run](https://ci.yebilly.me/job/secure-delivery/job/pricing/8/) | SUCCESS; 04:22:04.875–04:24:48.529; 163.654 s including approval wait |
| Actual approval | `vsun1`, 04:23:36, archived |
| Ansible rollback | 04:23:42.801–04:24:46.705; 63.904 s; ok=10 changed=3 unreachable=0 failed=0 |
| First v1 health response completed | 04:24:25.313; request started 04:24:23.645 |
| Restored behavior | HTTPS health/identity/price passed; v1, source 34f26e6, total 30 |
[Actual production v1 SUCCESS screenshot](../../manual/latex/images/assignment8-rollback-8-20261115.jpg):
build 8 completed November 16 at 04:24:48 UTC; deployment recap passed.
Twelve control and three app tests, source-secret and nine-dependency gates
passed. Build/publish was skipped: the original scanned digest and matching
Ansible configuration were restored without rebuilding. Deployment-start to
first observed v1 response completion was 42.512 s. Decision-to-recovery also
includes the runner error, troubleshooting and actual human wait; it is not
traffic interruption time.
Production: **863 requests, 9 failures** (8 HTTP 502, one timeout), sampled
04:17:46.447–04:32:10.607. Adjacent successful response completions:
04:24:12.672 (v2), 04:24:25.313 (v1), **12.641 s apart**. First failed request:
04:24:13.629. This is sampled evidence, not an exact continuous outage duration
or proof of zero interruption between requests. Maximum request-start gap:
2.015 s; two-second timeouts delayed the nominal one-second cadence.
## Separate staging failure and recovery
[Build 9](https://ci.yebilly.me/job/secure-delivery/job/pricing/9/) selected the
good v2 staging record and changed only its runtime configuration selection
to the reviewed bad SHA. Its existing image remained:
```text
git.yebilly.me/ssw590-group1/pricing@sha256:efe8658a0adf0854038d58199652030cbd0ef70047a1c6ebc7b09906cf1ec88b
```
Gunicorn bound to 8001; image health/Caddy used 8000. Compose reported
`container pricing-staging-app-1 is unhealthy`. The command retained
`--wait --wait-timeout 90`; Ansible blocked after 86.690 s including earlier
tasks: ok=4 changed=1 unreachable=0 failed=1, exit 2. No unchanged rerun,
production approval or production deployment ran.
The 04:28:54.827 snapshot confirmed staging unhealthy/HTTP 502 at the same v2
digest while production remained healthy v1/total 30. The failed run did not
reach the final metadata-copy task: host `release.json` still described the
last good release while Compose was bad. That file alone cannot prove health.
[Build 10](https://ci.yebilly.me/job/secure-delivery/job/pricing/10/) used the
original good v2 staging record and restored playbook/template from
`6bddbfba5a36e0e397537678ffb197e101fb0670` using `git archive`. No rebuild/push.
| Staging event | UTC / actual result |
|---|---|
| Decision / observer start | 04:25:23.940 / 04:25:24.078 |
| Failed deployment | 04:26:25.354–04:27:52.043; 86.690 s; build 9 FAILURE |
| First failed request | 04:26:53.130 |
| Recovery job began | 04:28:38.093 |
| Recovery Ansible | 04:29:10.106–04:30:06.603; 56.497 s; ok=10 changed=2 failed=0 |
| First recovered v2 response completed | 04:29:44.923; request started 04:29:43.205 |
| Unchanged rerun | 04:30:10.352–04:30:58.451; 48.099 s; ok=10 changed=0 failed=0 |
| Recovery job ended | 04:30:59.765 SUCCESS; 141.672 s total |
Staging: **406 requests, 169 failures** (168 HTTP 502, one timeout), ending
04:32:11.031. Adjacent successful response completions: 04:26:52.273 and
04:29:44.923, **172.650 s apart**. This includes fault, collection/selection,
new-job gates and restoration; it is not Ansible duration or an exact continuous
outage. Maximum request-start gap: 2.018 s. Production had no additional failed
observer requests during the staging exercise; its Compose hash was unchanged.
## Monitoring, final state and limits
At 04:34:28.765: production v1/source 34f26e6/total 30; staging v2/source
6bddbfb/total 36. Both healthy, exact original digests/configuration restored,
invalid quantity 0 returned HTTP 400, no published application host port.
All six scrape targets were up and all three HTTPS probes were 1. The 34
production samples since the decision were all 1: the 30-second probe missed
the short rollback interruption captured by the finer observer. Grafana was
flat over this exercise, unlike the earlier v2-release dip. The captured
90-minute query returned no `ALERTS` samples; no notification history or
Discord-notification claim is made. Staging used its own observer, not the
production-only chart.
Capacity sample: 1,967 MiB RAM, 660 MiB available; swap 476/2,047 MiB;
root space 8.9 GiB available, 62% used. Pricing used 32.53/33.68 MiB;
agent 131.9/512 MiB and 71/128 tasks, zero new process-limit events since
restart. Grafana used 188.4/192 MiB. These are point samples, not load/soak
tests. Serialize jobs on the shared CPU. The same-host observer shares the
Droplet failure domain; no off-site monitoring or high availability is claimed.
Status-only probes cannot verify price.
Both bounded observers were stopped after post-recovery verification rather
than waiting out their 1,800-second maximum. Only their verified PIDs were
signaled. Earlier services, volumes, credentials, gates and backups remain.
[Issue 28](https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/issues/28) was
created with Vincent's explicit authorization at 04:33:40 during finalization,
after implementation and exercises. It records a late workflow correction,
not a pre-implementation issue. Final group review/merge and submission remain.