Finalize Assignment 8 recovery evidence and manual
vpn-dns-gateway/pipeline/head This commit looks good
vpn-dns-gateway/pipeline/pr-main This commit looks good

This commit is contained in:
2026-11-16 00:03:46 -05:00
parent 72bf10dcec
commit fbda9516fe
23 changed files with 7696 additions and 126 deletions
+15 -6
View File
@@ -1,6 +1,6 @@
# Assignment 8 evidence
## Reviewed Jenkins execution, 15 November 2026
## Completed Jenkins execution, 15 November Eastern / 16 November UTC
PRs 24–26 are merged. The actual [test/secret gate demonstrations](evidence/gates-20261115.md)
blocked as intended. [Release attempt 3](evidence/release-attempt-3-20261115.md)
@@ -11,8 +11,15 @@ Eight isolated diagnostic probes passed with ten seconds instead of three.
After review, [builds 5 and 6](evidence/releases-20261115.md) completed v1/v2
promotions, zero-change reruns and actual human approvals. Production monitoring
is live; one HTTP 502 sample during v2 replacement is preserved. The exact
successful records and staging-only fault/revert history await review before
recovery. Both recovery exercises remain unexecuted.
successful records and staging-only fault/revert history were reviewed in PR 27.
[Completed recovery evidence](evidence/recovery-20261115.md) records build 7's
pre-deployment runner error, human-approved rollback 8, blocked staging fault 9,
and original-configuration recovery 10 with changed=0. Final production is
healthy v1/total 30 and staging v2/total 36. Original CSVs, hashes, runtime
checks and monitoring correlation preserve observed interruptions and limits.
[Issue 28](https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/issues/28) was
created during finalization with Vincent's authorization; final group review
and submission remain.
## Preparation evidence — historical baseline
@@ -60,12 +67,14 @@ from the initial laptop checks above. UTC dates cross into November 15 while
the client's Eastern date is still November 14. At that point the PDF runner
was unchanged. It subsequently moved too; see the
[manual runner migration record](../gitea/droplet-runner/EVIDENCE.md).
Assessed releases and recovery are still pending.
At that migration snapshot, assessed releases and recovery were still pending;
the completed results are linked above.
## DNS and TLS readiness
On 15 November Billy's two DNS records were verified and Caddy's prepared
routes applied. Both names have trusted TLS and HTTP 308 redirects; HTTPS
returns 502 while pricing backends are absent. See the
returned 502 while pricing backends were absent. See the
[dated HTTPS evidence](evidence/https-20261115.md). Application deployment,
production monitoring and assessed recovery evidence remain pending.
production monitoring and recovery were pending at that readiness snapshot;
their subsequent completed results are linked above.