Patch Jenkins and verify cloud CI host maintenance
vpn-dns-gateway/pipeline/head This commit looks good
vpn-dns-gateway/pipeline/pr-main This commit looks good

This commit is contained in:
2026-11-26 23:23:44 -05:00
parent d65d1fdf5c
commit f3a80a284f
23 changed files with 2370 additions and 28 deletions
+20 -12
View File
@@ -7,8 +7,10 @@ Demonstrate an issue becoming a reviewed source change, a cloud build, automated
test results and a versioned application artifact. TikZRefinery supplies the C++/Qt
workload; Gitea, Jenkins and Grafana supply the workflow and operational view.
This is a rehearsal plan. Before the final rehearsal, complete the reviewed
baseline Jenkins run and record the actual issue, change, job URL and build number.
This is a rehearsal plan. The reviewed baseline passed in
[Jenkins build 2](https://ci.yebilly.me/job/tikzrefinery-demo/2/) at main `d65d1fd`,
producing verified version 1.0.2. Before the final rehearsal, record the separate
live issue, change and subsequent build number.
The proposed provider naming refactor remains a candidate from the senior-project
handoff. Prepare its issue/comment and patch only after that baseline succeeds.
Zammad is a separate assignment. The unfinished VPN is outside this demonstration.
@@ -22,13 +24,14 @@ review, even during the timed demonstration.
Complete these steps before calling the walkthrough ready:
- Merge the reviewed security and baseline PRs, preserving both manual records.
Their current references are [security PR 30](https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/pulls/30)
and [baseline PR 31](https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/pulls/31).
- Configure the separate artifact job to load `demo/Jenkinsfile` from reviewed
`main`. Run it once and verify SCM checkout, stage execution, JUnit display,
artifact archiving, a downloaded artifact and its provenance/checksum. The
existing PR check and the new artifact job are separate checks.
- Completed: reviewed [security PR 30](https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/pulls/30),
[baseline PR 31](https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/pulls/31)
and [repair PR 32](https://git.yebilly.me/ssw590-group1/vpn-dns-gateway/pulls/32)
merged, preserving their manual records. Jenkins core maintenance is applied.
- Completed: the separate artifact job loads `demo/Jenkinsfile` from reviewed
`main`; build 2 proved SCM checkout, stages, eight passing JUnit results,
archiving, authenticated HTTPS download and local provenance/checksum checks.
The existing PR check and artifact job remain separate checks.
- After that baseline passes, agree on the live issue/change and rehearse the
feature-branch, review, merge and artifact-build sequence. Reserve the actual
demonstration commit/push for the assessed workflow.
@@ -36,8 +39,9 @@ Complete these steps before calling the walkthrough ready:
rejects any changed imported byte. An intentional product increment needs an
explicit, tested provenance record for its changed files; do not simply disable
verification or continue claiming all files are unchanged from the original.
- Record the real demo issue URL, branch, expected behavior, baseline build URL,
artifact job URL and last successful fallback build. These values are pending.
- Record the real demo issue URL, branch and expected behavior; those are pending.
Baseline/fallback is build 2, version 1.0.2, at the job linked above. Retain its
downloaded artifacts and [success record](evidence/jenkins-baseline-success-20261126.json).
- Sign in to Gitea, Jenkins and Grafana privately before screen sharing. Check Git
authentication beforehand; pause sharing if a password/token prompt appears.
- Test HTTPS from the actual classroom network. The cloud workers avoid the
@@ -53,7 +57,11 @@ Complete these steps before calling the walkthrough ready:
The November 25 cloud rehearsal sampled approximately 146 seconds for native
build/tests, 75 seconds for reports, 10 seconds for architecture and 49 seconds for
the final package. These are sampled phase spans, not a measured Jenkins duration.
Measure the real job before accepting this timing plan.
The real November 26 Jenkins baseline took **7 min 41 sec** (461,895 ms),
including checkout and artifact/report publication. Existing images/caches were
reused. Begin the build promptly and use its running time for the configuration
and SWOT explanations; rehearse the issue/review sequence against the 20-minute
limit before accepting this schedule.
## Timed walkthrough