Move CI runners to Droplet and enable application HTTPS
vpn-dns-gateway/pipeline/pr-main This commit looks good

This commit is contained in:
2026-11-15 12:49:06 -05:00
parent bf28adc7fb
commit ed0a862657
36 changed files with 1266 additions and 72 deletions
+12 -5
View File
@@ -7,14 +7,21 @@ unchanged Ansible reruns, recorded human approval and recovery operations.
Keep the earlier PR job separate from folder-scoped deployment credentials.
Include the reproducible agent/bootstrap, scan policy, runbooks, actual
prerequisite evidence and a clearly marked preparation chapter. Proxy and
monitoring additions are prepared for later application after DNS and health
are ready. The release job is configured but disabled until reviewed source
prerequisite evidence and a clearly marked preparation chapter. Billy's DNS
records and Caddy HTTPS routes are now verified; app requests return 502 until
the backends are deployed. Monitoring additions await healthy production.
The release job is configured but disabled until reviewed source
reaches main. Assessed v1/v2 promotions and both recovery exercises remain
pending and will require separate reviewed changes and execution evidence.
Validation: two existing tests, three Flask tests, twelve control tests;
controlled test/secret blocks; passing source/dependency and runtime-image
gates; Ansible syntax, agent Compose and installed Jenkins parser checks;
successful trusted-agent prerequisite build 1, including pinned deployment SSH
and noninteractive sudo. No production approval or completed release is claimed.
successful prerequisite builds 1 (laptop) and 2 (Droplet), including pinned
deployment SSH and noninteractive sudo. The agent now runs on the existing
2 GiB Droplet to avoid campus SSH restrictions, with separate agent/builder
resource caps and a passing bounded build/scan/smoke trial. Shared-host Docker
administration is documented. The original Gitea Actions runner also moved to
the Droplet with its existing identity, separate daemon/job caps and a passing
reviewed-main run 12 rerun (attempt 3); the initial low-memory attempt is retained.
No production approval or completed release is claimed.