Record verified releases and prepare recovery exercises

This commit is contained in:
2026-11-15 23:00:00 -05:00
parent 231d11528a
commit 6c5342219a
23 changed files with 1619 additions and 119 deletions
+145 -44
View File
@@ -8,20 +8,20 @@ Startup Pricing Service and the existing Gitea, Jenkins, Caddy and monitoring
foundation. The Canvas page lists November 13, 2026 at 11:59pm; Vincent reports
an extension. Preparation began November 14; DNS/TLS and the first reviewed
Jenkins gate runs were verified November 15. PR~\#24 is merged, the delivery
job is enabled, and reviewed v1 images are published. After the SSH correction
merged, staging passed its initial HTTPS, identity and price checks. Its
unchanged rerun stopped at Docker's health deadline. A bounded timeout
diagnostic passed; the correction and v2 source/test change await review.
\textbf{It is not ready for submission.} Complete v1/v2 promotion,
production rollback, staging failure/recovery and monitoring correlation remain
pending. Published image metadata is not evidence of a successful deployment.
job is enabled, and reviewed Jenkins builds 5 and 6 successfully promoted v1
and v2 through staging and production using exact digests. Both unchanged
staging reruns passed with zero changes, and Vincent approved each production
operation in Jenkins. Production monitoring is live. The actual successful
records are prepared for review before the two recovery exercises.
\textbf{It is not ready for submission.} Healthy production rollback, deliberate
staging failure/recovery and their measured timelines remain pending.
The instructor's v1 source and tests were copied from
\path{Examples/dosSecureDelivery/v1/} to \path{delivery/app/}. Flask validates
requests and calculates the price; Gunicorn serves it with one worker on private
port 8000. There is no payment processing, customer data or application volume.
For three units v1 returns USD 30; the prepared separate v2 source/test change
returns USD 36 in local tests. It has not been released. The image embeds its actual source commit during the build. Health,
For three units v1 returns USD 30; the separate reviewed v2 release returns
USD 36. Both were verified in staging and production. The image embeds its actual source commit during the build. Health,
identity and pricing are verified separately.
\section{Deployment and Trust Boundaries}
@@ -43,8 +43,8 @@ identity and pricing are verified separately.
\node[box] (host) at (9.6,0) {The-Ocean host\\\texttt{deploy} SSH account\\Python, Docker/Compose};
\node[box] (monitor) at (0,-2.8) {Prometheus, Grafana,\\Blackbox and Node Exporter\\Private metrics ports};
\node[box] (proxy) at (4.8,-2.8) {Caddy TLS proxy\\Public 80/443\\Private \texttt{gitea\_web} network};
\node[box] (stage) at (9.6,-2.8) {Staging v1 (gate blocked)\\\texttt{staging.yebilly.me}\\{\scriptsize\texttt{pricing-staging:8000}}};
\node[planned] (prod) at (9.6,-5.2) {Production app (planned)\\\texttt{app.yebilly.me}\\{\scriptsize\texttt{pricing-production:8000}}};
\node[box] (stage) at (9.6,-2.8) {Staging v2\\\texttt{staging.yebilly.me}\\{\scriptsize\texttt{pricing-staging:8000}}};
\node[box] (prod) at (9.6,-5.2) {Production v2\\\texttt{app.yebilly.me}\\{\scriptsize\texttt{pricing-production:8000}}};
\node[data,text width=12.9cm,align=left] (storage) at (4.8,-8.45) {
\textbf{Persistent state and read-only mounts on The-Ocean}\\[3pt]
\begin{tabular}{@{}ll@{}}
@@ -56,7 +56,7 @@ Prometheus & \texttt{monitoring\_prometheus\_data} $\rightarrow$ \texttt{/promet
Grafana & \texttt{monitoring\_grafana\_data} $\rightarrow$ \texttt{/var/lib/grafana}\\
Proxy bind mount & \texttt{/root/gitea/Caddyfile} $\rightarrow$ \texttt{/etc/caddy/Caddyfile} (ro)\\
Monitoring mounts & \texttt{/root/monitoring/}: configuration (ro); host \texttt{/} $\rightarrow$ \texttt{/host} (ro)\\
Staging app config & \texttt{/opt/startup/pricing-staging}; production pending; no app data volume
App configuration & \texttt{/opt/startup/pricing-\{staging,production\}}; no app data volume
\end{tabular}};
\node[draw,dashed,rounded corners,fit=(agent)(local)(builder)(git)(host)(monitor)(prod)(storage),
inner sep=0.55cm,label={[font=\small]below:Existing droplet: 1 vCPU, 2 GiB RAM, 25 GB plan disk}] {};
@@ -67,13 +67,13 @@ Staging app config & \texttt{/opt/startup/pricing-staging}; production pending;
\draw[flow] (agent.south east)--node[note,above,sloped]{SSH}(host.north west);
\draw[flow] (git)--node[note,above]{hook}(jenkins);
\draw[flow] (host)--node[note,right]{apply}(stage);
\draw[flow,dashed] (host.east)--++(0.35,0)|-(prod.east);
\draw[flow,dashed] (monitor)--node[note,above]{probe}(proxy);
\draw[flow] (host.east)--++(0.35,0)|-(prod.east);
\draw[flow] (monitor)--node[note,above]{probe}(proxy);
\draw[flow] (proxy)--node[note,above]{HTTP}(stage);
\draw[flow,dashed] (proxy.south east)--node[note,above,sloped]{HTTP}(prod.north west);
\draw[flow] (proxy.south east)--node[note,above,sloped]{HTTP}(prod.north west);
\end{tikzpicture}}
\caption{Current architecture. Solid boxes are installed, including staging;
production and its monitoring connection remain planned. Gray boxes identify durable state
\caption{Current architecture after both releases: staging and production v2
are installed, and the production health probe is live. Gray boxes identify durable state
or read-only mounts. Pricing is stateless; each environment retains only its
Compose and release files on the host. The agent and builder now share the
droplet; deployment SSH uses Docker's host gateway with the original pinned
@@ -219,10 +219,10 @@ timing and makes a nonzero changed count on the unchanged rerun a blocking error
\small
\begin{tabularx}{\linewidth}{L{2.1cm}Y Y}
\toprule Traceability field & v1 & v2\\\midrule
Source / config commits & Reviewed \texttt{a19fab3}; health fix awaits review & Separate source/test change prepared\\
Registry digest / Jenkins release build & Published in builds 3 and 4; identifiers below & Not published / not run\\
Staging + unchanged rerun & Build 4: initial deploy passed, rerun blocked & Pending\\
Production approval / result & No approval or promotion yet & No approval or promotion yet\\
Source / config commits & Reviewed \texttt{34f26e6} & Reviewed \texttt{6bddbfb}\\
Registry digest / Jenkins release build & Exact digest; build 5 SUCCESS & Exact digest; build 6 SUCCESS\\
Staging + unchanged rerun & Passed; changed=0 on rerun & Passed; changed=0 on rerun\\
Production approval / result & \texttt{vsun1}; total 30 verified & \texttt{vsun1}; total 36 verified\\
Recovery evidence & Healthy rollback pending & Staging failure/recovery pending\\
\bottomrule
\end{tabularx}
@@ -346,24 +346,123 @@ all resource/security limits remain unchanged. The branch also prepares v2
(version v2, unit price 12, total 36); three local functional tests and twelve
control tests passed. The local Windows functional environment used Flask 3.1.3
and Werkzeug 3.1.8; assessed Jenkins deployment remains locked to Werkzeug
3.1.9. Neither the candidate image nor v2 has been released.
3.1.9. At that preparation point neither candidate had been released; the
following section records their subsequent assessed Jenkins runs.
Keep the v1 health fix and v2 application/test change in separate reviewed
commits, which may share one PR. Merge with a merge commit, preserving both
SHAs. Select the first commit for v1 and the second for v2. Each must pass the
full release path and its own real human approval; save and review actual
successful release records before recovery. No commit SHA is invented here.
Vincent kept the v1 health fix and v2 app/tests in separate commits within
PR~\#26. Billy reviewed both; the merge preserved their SHAs for explicit
Jenkins selection. Each then passed the full release path and its own real
human approval. The actual successful selectors now await review before recovery.
\section{Successful v1 and v2 Releases}
Billy approved PR~\#26 at 02:56:00 UTC on November 16 (November 15 Eastern).
Vincent merged it at 02:57:42 as \texttt{231d115}, preserving both source commits.
Actions manual workflow 15 passed in 2m7s before delivery began. The dedicated
job first loads the reviewed main pipeline, then checks out the selected
reviewed source ancestor; its selected source can therefore differ from the
initial SCM-head metadata shown by Jenkins.
\small
\begin{tabularx}{\linewidth}{L{3.3cm}Y Y}
\toprule Actual result (UTC) & v1 & v2\\\midrule
Jenkins release & \href{https://ci.yebilly.me/job/secure-delivery/job/pricing/5/}{Build 5 SUCCESS} & \href{https://ci.yebilly.me/job/secure-delivery/job/pricing/6/}{Build 6 SUCCESS}\\
Full run including approval wait & 03:00:10--03:05:08; 297.214 s & 03:05:33--03:12:29; 415.707 s\\
Initial staging & 59.160 s; ok=10, changed=3, failed=0 & 60.106 s; ok=10, changed=3, failed=0\\
Unchanged staging rerun & 41.499 s; changed=0, failed=0 & 45.487 s; changed=0, failed=0\\
Actual approver / UTC & \texttt{vsun1}, 03:04:01 & \texttt{vsun1}, 03:11:18\\
Production deployment & 03:04:05--03:05:05; 60.403 s & 03:11:21--03:12:28; 66.234 s\\
Quantity 3 in each environment & USD 30 & USD 36\\
\bottomrule
\end{tabularx}
\normalsize
Each run passed twelve control tests and three Flask tests. Source-secret
reports had zero findings, all nine locked dependency audits had zero
advisories, and both pre-push and registry-digest image gates analyzed two
targets with zero HIGH/CRITICAL findings. No exception was added. Each
source-SHA image was built once, pushed/pulled and promoted by the same digest
through both environments. HTTPS health, version, exact baked source and price
assertions passed in production as well as staging.
The common image repository is \path{git.yebilly.me/ssw590-group1/pricing}.
These are the exact selected source/configuration commits and registry digests:
\par\noindent\begin{minipage}{\linewidth}
\begin{Verbatim}[fontsize=\footnotesize,frame=single]
v1 source/configuration:
34f26e6948b7001ede8ca19f23b67a02082e6a9a
v1 registry digest:
sha256:59c880b2704f91668618d9a2ff0bc8fbab0af4239ceb916de261863890ef88d8
\end{Verbatim}
\end{minipage}\par\smallskip
\noindent\begin{minipage}{\linewidth}
\begin{Verbatim}[fontsize=\footnotesize,frame=single]
v2 source/configuration:
6bddbfba5a36e0e397537678ffb197e101fb0670
v2 registry digest:
sha256:efe8658a0adf0854038d58199652030cbd0ef70047a1c6ebc7b09906cf1ec88b
\end{Verbatim}
\end{minipage}\par\smallskip
The four JSON files under \path{delivery/releases/} are copied unchanged from
these successful builds and pass the strict selector validation. They still
need review/commit before recovery; earlier failed-attempt records were not
substituted. Jenkins archives the full tests, scans, recaps and actual approval
records. Dated human-readable and machine-readable evidence under
\path{delivery/evidence/} preserves their timestamps, results and scan-report
hashes. Full local archives remain in the ignored execution evidence directory.
\section{Live Production Monitoring and Observed Interruption}
Only after healthy v1 production, at 03:08:11 UTC, the previously reviewed
production health target and panel 8 were applied. The guarded helper checked
public production health and the earlier configurations, validated with the
installed promtool, saved protected backups, preserved bind-mounted inodes and
reloaded Prometheus with SIGHUP. Grafana provisioned the dashboard change.
Earlier probes/panels, volumes, retention, credentials and alert rules were
preserved. The backup and applied hashes are recorded in the versioned evidence.
\href{https://prometheus.io/docs/prometheus/latest/configuration/configuration/}{Prometheus documents runtime SIGHUP reload};
\href{https://grafana.com/docs/grafana/latest/administration/provisioning/}{Grafana documents file provisioning}.
Runtime verification was performed separately from syntax validation.
At 03:14:11 UTC all six scrape targets were up, all three HTTPS probes
(Gitea, Jenkins and production) had value 1, and the reload-success metric was
1. The actual Grafana UI displayed the new panel and production series while
retaining its previous seven panels. At 03:28:08 both app containers were
healthy v2 with the exact selected source; identity, health and total 36
returned HTTP 200, and quantity 0 returned HTTP 400. Neither app had an OOM
or memory-limit event in that captured container state.
The production history contained 40 samples and one HTTP 502 / \texttt{probe\_success=0}
at \textbf{03:11:54.602 UTC}, inside v2's 03:11:21.802--03:12:28.037
production deployment window. Its adjacent successful samples were
03:11:24.602 and 03:12:24.602. This is evidence of an interruption during
single-host Compose replacement, not a zero-downtime release. One failed
30-second-cadence sample does not establish an exact 30-second outage; the
two bounding successes were 60 seconds apart. The observed interval is shorter
than the existing one-minute alert duration. No alert firing or notification
is claimed without separate evidence. A blue/green cutover after replacement
health would reduce this risk but is not implemented here.
\begin{figure}[htbp]
\centering
\renewcommand{\theHfigure}{delivery.monitor.\arabic{figure}}
\includegraphics[width=\linewidth,trim=320bp 0bp 0bp 0bp,clip]{images/assignment8-production-monitoring-20261115.jpg}
\caption{Actual Grafana production panel after activation. The visible dip
correlates with v2 replacement; exact UTC samples and HTTP 502 are retained
in the dated runtime JSON. The display uses Eastern time.}
\label{Figure:DeliveryProductionMonitoring}
\end{figure}
\section{Release, Recovery and Monitoring Runbooks}
The versioned \path{delivery/RUNBOOKS.md} gives the executable sequence.
Vincent handles commits/pushes; Billy reviews repository changes. The v1
preparation is now on main, DNS/TLS are ready, and the two deliberate gate
demonstrations have run. The SSH correction is merged. Review/merge the v1
health-timeout fix and separate v2 source/test commit, then retry
\texttt{release} with the reviewed v1 commit first.
Verify staging and changed=0 before a real human approval promotes v1. Save and
review its generated staging/production records. Apply the supplied v2 source
and test changes in another reviewed commit and repeat, expecting 36.
demonstrations and both reviewed releases have run. The four successful release
records must now be reviewed/committed before recovery. The patch in
\path{delivery/exercises/} defines a staging-only port mismatch. Preserve a
reviewed intermediate bad-configuration commit followed by its immediate revert;
the final main template remains correct. Billy must review all three commits
(records, fault, restoration), and a merge commit must preserve the bad SHA.
Only the explicit staging-failure job selects that historical configuration.
For healthy production rollback, record detection/decision time, start the
HTTPS observer, select the committed v1 production record and approve the
@@ -381,10 +480,10 @@ before production. Restore/review the correct template and rerun
total 36 and changed=0. Do not alter shared infrastructure or data to create
the failure.
The production \texttt{/health} probe and Grafana availability panel are prepared
in Git but not deployed while production is absent. Apply them after health is
verified, keeping existing Gitea/Jenkins probes and host metrics. Correlate real
Prometheus/Grafana samples with release/rollback times; 30-second scrapes and
The production \texttt{/health} probe and Grafana availability panel are now
live, as verified above. Future changes must preserve the existing Gitea/Jenkins
probes and host metrics. Correlate actual Prometheus/Grafana samples with the
remaining rollback and recovery times; 30-second scrapes and
alert durations can miss a brief interruption. Uptime probes do not verify
pricing. The observer in \path{delivery/ci/observe.py} records finer HTTPS
samples without treating an intended failure as an observer-script failure.
@@ -403,18 +502,20 @@ previous configuration and gracefully reloaded it while preserving the earlier
routes, allowlists, volumes and bind-mounted inode. Normal curl and Python TLS
checks confirmed trusted hostname-matching certificates, TLS 1.3 and HTTP 308
redirects. Initially both backends returned 502. Build 4 subsequently deployed
staging v1, whose first HTTPS checks passed before the health rerun blocked;
production remains undeployed. Certificate and DNS
staging v1, whose first HTTPS checks passed before the health rerun blocked.
The later reviewed builds 5 and 6 completed promotion, and both environments
were verified as healthy v2. Certificate and DNS
details are recorded in \path{delivery/evidence/https-20261115.md}. Existing
Gitea/Jenkins/Grafana checks still passed. The public application port is HTTPS
443, with internal port 8000 remaining private. Distinct DNS hostnames satisfy
the planned routing boundary; completed application promotion remains outstanding.
the routing boundary; rollback and staging recovery remain outstanding.
PR~\#24 now includes the runner migration and HTTPS changes and is merged.
Issue creation, review/merge of the health fix and v2, complete v1/v2 releases, production approvals,
both recovery demonstrations, final traceability and monitoring evidence, and
the final submission review remain outstanding. Local checks are not a
replacement for those executions.
The health correction, v2, both promotions and their human approvals are
complete. Issue creation if still absent, review/merge of the successful records
and preserved staging-only fault, both recovery demonstrations and their
measured monitoring correlation, and final submission review remain outstanding.
The diagnostic trials are not substitutes for the two remaining executions.
After grading, only when instructed, retain required evidence and remove only
the two pricing projects, their routes, monitoring additions and test DNS.