Record verified releases and prepare recovery exercises
This commit is contained in:
@@ -3,12 +3,14 @@ commands, designs, and evidence. Assignment 8 implements secure delivery with
|
||||
a trusted Jenkins agent, locked Flask/Gunicorn service, security gates,
|
||||
Ansible, scoped deployment credentials and recovery runbooks. The prerequisite
|
||||
jobs, DNS/TLS and deliberate Jenkins test/secret blocks passed. The reviewed v1
|
||||
image was published with passing scans. After the noninteractive SSH correction
|
||||
merged, staging passed health, identity and price checks, but its unchanged
|
||||
rerun was blocked by a three-second Docker health deadline. Eight constrained
|
||||
diagnostic probes passed with a ten-second deadline. That correction and the
|
||||
required v2 source/test change await review as separate commits. Complete
|
||||
v1/v2 promotions, approvals, rollback and staging recovery remain pending.
|
||||
images were published with passing scans. After the SSH and health-deadline
|
||||
corrections were reviewed, Jenkins builds 5 and 6 promoted v1 and v2 by exact
|
||||
digest through separate staging/production environments. Both unchanged reruns
|
||||
passed with zero changes; Vincent approved each production operation. The
|
||||
production probe and Grafana panel are live. One failed availability sample
|
||||
was observed during v2 replacement; zero downtime is not claimed. The actual
|
||||
release records and staging-only fault still require review before the healthy
|
||||
production rollback and failed-staging recovery demonstrations.
|
||||
This draft is not ready for submission.
|
||||
Assignment 7 introduced site reliability
|
||||
engineering: Prometheus, Grafana OSS, Node Exporter, and Blackbox Exporter
|
||||
|
||||
Reference in New Issue
Block a user