Document successful repair and finalize Assignment 5 evidence (refs #12)
Automated Manual Build / manual (push) Successful in 30s
Automated Manual Build / manual (push) Successful in 30s
This commit is contained in:
+5
-2
@@ -85,5 +85,8 @@ controlled failure and repair. Keep tokens and account settings out of shots.
|
||||
|
||||
Run 2 subsequently passed for `0ca3beb` with PDF/ZIP/checksum verification.
|
||||
Run 3 (`1d2822f`) demonstrated the intentional compiler failure, skipped PDF
|
||||
upload, and retained diagnostics. The repaired source is prepared; the passing
|
||||
repair workflow still needs to be captured and verified.
|
||||
upload, and retained diagnostics. Repair run 4 then passed for `b68425b`;
|
||||
its PDF displays `3.3+build.4.b68425b` and was verified against its artifact
|
||||
ZIP and diagnostic checksum. The manual now records this complete sequence.
|
||||
The final evidence update must be pushed and its successful workflow PDF
|
||||
reviewed before submission.
|
||||
|
||||
Reference in New Issue
Block a user