Add frozen TikZRefinery demo baseline and build pipeline
vpn-dns-gateway/pipeline/head This commit looks good
vpn-dns-gateway/pipeline/pr-main This commit looks good

This commit is contained in:
2026-11-25 22:46:33 -05:00
parent 6064cce05e
commit 27b82c169e
456 changed files with 66509 additions and 0 deletions
@@ -0,0 +1,6 @@
This document specifies the stakeholder needs, requirements, architecture,
implementation constraints, tests, verification evidence, validation evidence,
and release criteria for the \ProjectName. It is both a printable engineering
record and the authoritative input for AI-assisted implementation. A conforming
implementation may be regenerated from the complete specification, but no
single chapter should be treated as sufficient on its own.