# Week 9 report review: version 1.9.0
The Week 9 assignment was inspected read-only in Vincent's connected Chrome
session on October 30, 2026:
https://sit.instructure.com/courses/188761/assignments/696107
It is due October 30 at 11:59 p.m. and requires at most one page, completed
and next-week work, applicable actions/risks, and links to updated locations in
both the weekly entry and Document History. Unlike Week 8, this assignment
does not specify a built-package screenshot. Its scope remains an outstanding
instructor clarification from Week 8.
The weekly records the completed ownership/interaction/provider-boundary review
and Milestone 2 specification work. Vincent confirmed submitting 1.8.1.1.
Transaction/history implementation was deferred; new product checks and
participant validation are not claimed. Counts were checked against authored
TeX: 72 requirements, 59 planned test cases, 10 stories, 72 VER plans, 10 VAL plans.
Both editions completed the existing shared TinyTeX sequence: initial pdflatex,
bibtex, makeindex and three final pdflatex passes. Final logs are clean.
`qa-summary.json` records final hashes, page counts, weekly page boundaries and
resolved PDF navigation targets. Week 9 is exactly printed page 111 in each;
Week 8 remains one page. PDFs were used for visual/navigation checks only;
no PDF text extraction was used. Affected pages were rendered, contact sheets
reviewed and the new weekly, abstract, roadmap and prompt record inspected
at reading size. An abstract overflow was corrected before delivery.
The working submission PDF has 161 pages and the developer's edition 217 pages.
The submitted Milestone 2 checkpoint was retained unchanged under
`../../submissions/milestone-2-1.8.1.1/`. The current sources and current PDFs
remain in their usual repository locations. No Canvas upload/submission,
application implementation, commit or push was performed by this task.
Reproducible compiler outputs, draft previews and review images were removed
from `work/week-9-report/` after verification. Final reports, this QA record,
the submitted checkpoint, sources, prototype package/demos and other tasks'
work were retained. The JSON records cleanup measurements and preservation checks.