Add frozen TikZRefinery demo baseline and build pipeline
vpn-dns-gateway/pipeline/head This commit looks good
vpn-dns-gateway/pipeline/pr-main This commit looks good

This commit is contained in:
2026-11-25 22:46:33 -05:00
parent 6064cce05e
commit 27b82c169e
456 changed files with 66509 additions and 0 deletions
@@ -0,0 +1,22 @@
# Week 8 package directory evidence
Assignment inspected in Vincent's Chrome tab on October 23, 2026:
https://sit.instructure.com/courses/188761/assignments/696106
Weekly Report 8 is due October 23 at 11:59 p.m. and requires at most one page,
completed work, next-week plans, action items, issues/risks, current Document
History, and a screenshot of the built-package directory with version numbers.
Vincent approved using prototype application version 0.1.0 and will clarify
the instructor's intended package scope at the next class.
`package-directory-2026-10-23.jpg` is the original bounded Windows File Explorer
capture of `code/packages/`, containing `TikZRefinery-0.1.0-windows-x64/`.
The report clips the image to the breadcrumb and directory row for legibility;
the underlying capture is unaltered. No screenshot content was synthesized.
The binary package is retained locally but ignored by Git. Application version
0.1.0, Qt version 6.12.0 and report version 1.8.0 describe different artifacts.
See `code/tests/evidence/package-2026-10-23.md` for the bounded package checks.
`week-8-report-preview.png` is the reviewed rendering of the one-page Week 8
entry retained for Vincent's review. The authored TeX and complete report PDFs
remain authoritative; the preview is generated evidence, not editable source.
Binary file not shown.

After

Width:  |  Height:  |  Size: 44 KiB

Binary file not shown.

After

Width:  |  Height:  |  Size: 266 KiB