Add frozen TikZRefinery demo baseline and build pipeline
vpn-dns-gateway/pipeline/head This commit looks good
vpn-dns-gateway/pipeline/pr-main This commit looks good

This commit is contained in:
2026-11-25 22:46:33 -05:00
parent 6064cce05e
commit 27b82c169e
456 changed files with 66509 additions and 0 deletions
@@ -0,0 +1,38 @@
# Week 11 report - prepared November 20, 2026
Vincent explicitly selected the overdue Week 11 assignment (November 13) after
Canvas showed it missing. No Week 12 report or persona/interface addition is
included. The entry identifies retrospective preparation and does not invent a
contemporaneous next-week plan. Completed-work claims cover November 7--13 and
use the retained November 12 resize evidence and checkpoint 5a776cb.
The updated report baseline is 0.1.1-alpha. The full report build uses the
existing TinyTeX/BibTeX/makeindex sequence in documents/build-report.ps1.
The submission ZIP contains the corresponding versioned report PDF, verified
byte for byte. The current report has a one-page Week 11 entry with linked
requirements, use case, class, sequence, activity and resize-evidence locations.
`first-build-result.txt` is the actual first submission-only run on November 20.
`autobuild.png` captures that text in an offscreen read-only Qt log view, following
Week 10's evidence convention; it is not a desktop terminal capture or a
November 13 build. A browser local-file preview was blocked by URL policy; it
was not retried or bypassed. The offscreen artifact rendering uses no browser
or network access. The final full build includes the image; its result is
`final-build-result.txt`. `qa.json` records page count, navigation, archive and
preservation checks. The PNG and actual first/final results remain evidence.
The existing application, source, CMake configuration and frozen Alpha 0.10.3
package remain unchanged. Existing uncommitted work, examples, slides and
submissions are preserved. Prior canonical 0.1.0-alpha PDFs are retained at
documents/submissions/baselines/architecture-0.1.0-alpha/.
No application tests were rerun. No email, Canvas submission, commit or push
was made. Instructor acceptance and late-work decisions remain pending.
Both final editions passed build/diagnostic and visual checks (214 submission
pages; 274 developer pages). Week 11 is one page, printed page 154, at submission
PDF page 174 and developer PDF page 176. All 6,530 internal links resolve;
stable-ID/reference checks pass. Cleanup removed 159 task-created files
(18.57 MiB), including the build/render copies, temporary log-capture helper
and unused preview HTML. Final deliverables, TeX, the screenshot, actual build
logs, compact QA evidence and historical baselines remain.